20160307160223.pdfRAM Engineering
City of Edmonds Development Services Department
c/o JoAnne Zulauf
1215th Avenue North
Edmonds, WA 98020
RE: 20226 Maplewood Drive (Lot 1)
Plan Check BLD20151520
Vt Plan Review Comment Response
RAM Job No. 15-028
Ms. Zulauf:
MAR 0 4 2016
BUILDINQ DEPAMMENT'
OM FL N
March 4, 2016
This letter outlines the revisions and corrections made per your review comments dated March 1, 2016.
Below is a list of the comment response documents addressing the comments and requests:
Sheet 1:
1. Detention system using 30" pipe is required to have type 2 manholes. See Table 2 of
Handout E72A.
Plans have been revised to an 18" pipe. Plans and an updated stormwater detention pipe
calculation memo has been provided.
2. Please add bottom elevation of both ends of 30" pipe in detention detail to verify tank slope.
Elevations added to detention pipe detail as requested.
3. Please provide detail for drywell trench.
Drywell trench detail has been added to sheet 4.
Sheet 3:
4. Please remove the driveway drainage note and cb from this plan,
Drainage note and CB have been removed from sheet 3.
If there are any questions regarding the items above or the contents of the revised drawings, please
contact me at your earliest convenience; I can be reached at (425)678-6960 or
RobL@RAMengineeringinc.com. We sincerely appreciate your time and assistance.
Thank you,
Rob Long, PE
Principal
cc: Kayla Clark, c/o Select Homes, Inc.
I Engineering 16531 131h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMenginerringinc.com