Loading...
20160328163806.pdfREE ASSOCIATES, PS Civil & Structural Englneering ® 19626 76th Ave. W. #A, Lynnwood, WA 98036 Office (425) 778-2793 wer@reed-assoc.c:om 3-23-2016 Crosby Homes, Inc. Re: PlanS2195A3F-7QBR @ 21911 93,d Ave W Edmonds, Wa BLD2016-0096 R&A#16-106 To whom it may concern, 3/23/16 The following is this office's response to the correction letter for the referenced project. Item 12(a & b): See enclosed calculation packet. Item 13: Walls referenced in letter at cantilevered floor joists have not been used in calculations for shear wall analysis, and are not required. However if nailed per SW -1 they Will exceed the requirements specified by the 2012 IBC, Table 2304.9.1 this is allowed. Item 14:Referenced wall was not designed to IRC but rather to IBC, Wall has been designed to rotate around top of footing, with a required bottom restraint force of 1,093.3 lbs per foot of wall (see Restrained Retaining Wall calculation), a,#4 bar stubbed into footing wall withstand this shear load. A "hooked bar" induces forces into wall & footing that wall nor footing has been designed for and is not required. If you have additional questions or require further information please feel free to contact this office. Sincerely, Wendell Reed, PE, CBO