Loading...
20160330093552.pdf// '^/ /,�''''/I''- C\ P.1m wi,!�u�jIII�IfyIl�pA w w 4'...... (�' 1 '1 `� �uu, uiumv'I' iHiiuu =t 0,t)—ym '' 01 Mehrdad Rad c 1 u Z E u 4 W From: Mehrdad Rad Sent: Tuesday, February 23, 2016 2:02 PM To: 'kZweber@firedistrict1.org' Cc: Steve Adamson; John Goldberg; Marty Boonstra; 'jwilson@arcon-ti.com' Subject: Edmonds Pad Building Permit Resubmittal Package Attachments: FP1.pdf; LA-1.pdf; LO-1.pdf; REMOTE#1.pdf; Origianl Review Comments.pdf Hi Kevin, Please find attached revised drawing, hydraulic calculation, seismic calculations and following reply to fire sprinkler review comments dated 02/12/16 (attached original review comments): Date of Reply: 02/23/2016 Project Name: Edmonds Pad Building - Fire Sprinkler Submittal Location: 21940 Highway 99, Edmonds, WA Fire Review By: Chris Kimball Checked By: Marty Gillis F1. A. Confirmed. The building is designed for Ordinary Hazzard Group II and no "Extra Hazard Occupancies" nor will they fall under the "special Occupancy Requirements" F1. B. Confirmed. The building is designed for Ordinary Hazzard Group II F1. C. This is a shell and core project. No drop ceiling will be installed F2. A. This is a shell and core project. No wall will be built. F2. B. The building is designed for Ordinary Hazzard Group II. F2. C. Type of hanger anchor attachment added to the drawing and clouded F2. D. The kind and location of alarm bells added to the drawing and clouded (Field Note #4) F2. E. The flushing provisions note added to the drawing and clouded (General Note #10) F2. F. The name and address of the fire sprinkler contractor is clouded on the drawing F2. G. The location of the FDC is clouded on the drawing F2. H. The edition of NFPA 13 is added to the drawing (Scope of work note #1) F3. The spare sprinkler is located on the drawing and clouded F4. A note regarding temperature rating of 200"F is added to the drawing (Field Note #6) F5. Sway bracing calcution zone is added to the drawing and clouded F6. A note is added to the drawing regarding branch line restraint requirements and clouded F7. A note regarding maintaining above 40 degree F is added to the drawing and clouded F8. A note regarding water supply information is added to the plan with the name of the person who conducted the test and clouded F9. Backflow prevention device is added to the calculation and nodes are clouded in the drawing F10. A note regarding main drain is added to the drawing and clouded. F11. Hydraulic design information is added to the drawing and clouded Please let me know If this email and electronic documents are not acceptable and we submit in person. Thank You, Mehrdad Rad I Design Manager, Columbia Fire, Inc 1 111 South Findlay Street, Seattle, WA 98108 C: 425 999 69411 T: 206 232 8569 1 www.coulmbiafire.net