2016-0381 Safeway TI - GC.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: May 12, 2016
TO: Tricon Commercial Construction
eds@tc-const.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2016-0381
Project Address: 23632 Highway 99
Project: Safeway TI
Scope: Convert existing produce prep area to a refrigerated cut-fruit prep area M
occupancy group III-B construction - NFPA-13 sprinkler system plumbing
included mechanical under BLD2016-0456
disapproved
Please be advised that the building plans for the above referenced project have been
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
.
information, clarifications, or changes are neededReviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the clouded or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
On sheet 3 Proposed Fixture Plan:
1.Indicate on the plans the required wall, ceiling, and door insulation of at least R-25 per
Washington State Energy Code (WSEC) C402.5. It will be necessary to install a door, in
addition to the proposed strip-curtain, to meet this requirement.
2.Indicate on the plans the required lighting efficacy of 40 lumens per watt or more. If
lighting efficacy is less than 40 lumens per watt, a timer or other device must be installed
that turns off the lights within 15 minutes of when the cooler is not occupied by people per
WSEC C405.10.