20160405103449.pdfq�� S� T 4 RBBNE r T
City of Edmonds
Building Division
Chuck Miller
Re: Plan Check Comments: BLD2016-0212
Mr. Miller,
March 30, 2016
Thank you for your comments on the above referenced project and taking the time to speak
over the phone. Below are responses to comments related to the structural support of the
metal framing.
16. A note regarding allowable deflection has been added to detail 4/1-9.1.
18. A note regarding the allowable deflection has been added to detail 6/I-9.1. We have been
informed that the architect will add information regarding the screw specification as required
per the UL rating.
21. Per our conversation, Stabbert Engineering LLC has reviewed the note on detail 9/I-9.2
and finds it acceptable.
22. Reference revised detail 22/1-9.2.
23. Per our conversation, Stabbert Engineering, LLC has reviewed the note on detail 9/I-9.2
and finds it acceptable.
Sincerely,
Stabbert Engineering, LLC
Matthew Stabbert, PE, SE
227 BELLEVUE WAY NE #462 • BELLEVUE, WA 98004 - 425.968.5432
C ARCHITECTS
Date:
March 31, 2016
Project:
Affinity Dental TI
Project Address:
123 2"d Ave S
Floor 1 /Suite 110
Edmonds, WA 98020
Permit #:
BLD2016-0212
Scope:
Tenant improvement for dental office — B occupancy group — 22
occupants - II -B construction - NFPA-13 sprinkler system required—
permits for mechanical, plumbing, are to be deferred submittals —
required fire systems under separate permit
Reviewer:
Chuck Miller (Building Division)
Contact:
Christine Benda (JPC Architects)
Please see our responses in red below:
On sheet 1-0.0 — Cover Sheet & Site Plan
1. Drawing Index —Provide as part of a complete submittal sheet 1-9.5 —
Firestopping Detail. It could not be found among the submitted construction
documents.
Sheet 1-9.5 FirestoppingDetails have been added to the revised Ins .
On sheet 1-0.1 — General Notes & Symbols:
2. Door Notes
a. Note #4 — Clarify the reference to IBC Table 715.3 for the required labeling of
rated doors. Table 715.3 cannot be found in the 2012 IBC.
IBC reference has been revised o` 11 .'
b. Note #9 — Change the period during which egress doors are not to be secured
from the egress side from `open to the general public' to `occupied' per IBC
1008.1.9.3.
Revised.
On sheet I-CS.1 — Exit Plan and Codes Summary:
3. Code Notes —Note #3 —Change the number of occupants from `23' to `22'..
Revised.
4. Exit Plan — Occupant Load - Change the number of occupants from `23' to `22'.
Revised.
5. Exit Plan Key Notes
a. Change the note label from 'Exit Plan' to `Accessibility' to reflect the
applicable information provided.
Revised.
425 641 9200 1 909 112th Ave NE Suite 206 Bellevue, WA 98004 I www.jpcarchitects.com
J P C ARCHITECTS
b. Note #1 — Change the code section from '804.4' to '804.2 & 804.5.1'.
Section '804.4' regards sinks.
Revised.
c. Note #2 — Eliminate the provided incorrect information or change it to
reflect that applicable to the element noted in space '118'— Restroom - on
the 'Exit Plan'. Section '308' regards reach range.
Removed.
On sheet 1-2.1 — Dimension Plan:
6. Key Notes
a. Note #3 — Provide on the plans the detail referenced regarding the clear
framed glass relite at the entrance to space '116'— Pan.
Added new Construction Detail 4/1-9.1.2.
b. Note #14 — Change on the plans the elevation reference for the partial -
height partition from `16/1-8.1.1' to '16/1-8.1'.
Revised.
On sheet 1-3.1 — Floor Plan:
7. Floor Plan
a. Clarify the maneuvering clearance on the ingress side of door '103' to
space '104'— Checkout. It does not appear to comply with that required
per ICC A117.1-2009 Table 404.2.3.2.
Per the Dimensionl n Sheet 1-2.1, the front approach on the pull side
of Door 103 is 18" Fin. Clear parallel to doorwayi requirements
of referenced TabI is door is confirmed in compliance
with referenced requirements.
b. Clarify the maneuvering clearance on the egress side of door '118' to
space "118'— Restroom. It does not appear to comply with that required
per ICC A117.1-2009 Table 404.2.3.2.
The size of the Restroomrevised r ss the 18" finished
clear requirement r II latch/pull si of the door.
8. Key Notes — Note # 8 — Clarify the difference in the noted height above finished
floor for the installation of the shelving bracket and of that indicated in the
referenced detail — 1/19.3.1 to guide proper installation — see also review note
#24 below.
Installation of br i on Detail 1-9.3.1 has been revised .
On sheet 1-4.1.2 — Reflected Ceiling Plan:
9. Key Notes — Note #2 — Indicate on the plans the proposed location(s) of the 1 -
hour -rated shaft enclosure(s) for the required supply and exhaust ventilation
ducts from space '122' — Medical Gas'— to the exterior per IFC 5306.2.2. While
the installation of the mechanical ventilation system components to provide the
required minimum rate of 1 CFM per square foot of room may be permitted and
performed under deferred or separate permit, the required shaft enclosure(s)
must be represented on the plans to guide proper review, construction, and
425 641 9200 1 909 112th Ave NE Suite 206 Bellevue, WA 98004 I www,jpcarchitects.com
iRevised keynote #2 to include fire wrap specification and installation method,
Added proposed location for rated shaft enclosure.
nspection.
On sheet 1-8.1 — Interior Elevations:
10. Elevation 8 — Checkout 104 — North View — Verify on the plans that the final
installation of the 'Checkout' counter meets the requirements of ICC A117.1-2009
section 904.3.1. Allowing for the vertical portion, from below the 42" high
transaction surface to the top of the 30" portion below, to be open for a depth of
at least 1 foot would appear to allow that portion to meet the requirement for use
as an accessible service counter using a parallel approach at the end of the
counter.
Transaction count r height has been revised to +36"AFF.
11. Elevation 9 — Checkout 104 — East View — See review comment #10 above.
Transaction counter height has been revised o .
On sheet 1-8.2 — Interior Elevations:
12. Elevation 4 — Cerec 126 — East View — Change on the plans the section
reference for the casework from '16/1-9.3.3' to '13/1-9.3.3'.
Revised.
13. Elevation 7 — Operatory #4-134 — South View - Change on the plans the section
reference for the casework with a sink from '11/1-9.3.2' to '12/1-9.3.2'.
Revised.
14. Elevation 13 — Lab 127 — South View - Change on the plans the section
reference for the casework below the 'vacuformer' from '2/1-9.3.2' to '3/1-9.3.2'.
On sheet 1-8.3 — Interior Elevations:
15. Elevation 2
a. Change on the plans the elevation label from 'Operatory #2-132 — East
View, Op #4134 Sim.' to 'Sterilization 120 —North View'.
Revised.
b. Change on the plans the section reference for the casework from '6/1-
9.3.2' to '2/19.3.2'.
Revised.
On sheet 1-9.1 — Construction Details:
16. Detail 4 — Full Ht. Partition
a. Indicate on the plans the 'measure' (expressed in inches/fractions of an
inch) of 'designed deflection' to allow for in the installation of the full height
partitions to avoid moment reversal in the horizontal floor framing
structural members and to guide proper review, construction and
inspection. The information could not be found in the provided structural
calculations.
Detail has been revised — refer to Structural Engineer response attached.
425 641 9200 1 909 112th Ave NE Suite 206 Bellevue, WA 98004 I www.jpcarchitects..com
PC ARCHITECTS
b. Indicate on the plans the required installation criteria of the top of full
height walls at the deflection track. Most manufacturers require very
specific installation to perform as intended to prevent moment reversal.
Detail has been revised — refer to Structural Engineerrs ons c .
17. Detail 5 — Partial Ht. Partition — Change on the plans the detail reference for the
steel stanchion used to support the partial height partition from `14/1-9.1' to '10/1-
9.11
.
Revised.
18. Detail 6 — 1 Hr. Rated Full Ht. Partition
a. See review note #16.a. above.
Detail has beenris —rro Structural Engineerrs s .
b. See review note #16.b. above.
Detail has been revised — refer to Structural Engineerrs ons c .
c. Provide on the plans the required installation criteria of the materials noted
in UL Design No. U419 (type of fasteners, fastener length, fastener
spacing, type of gypsum wallboard) used to construct the 1 -hour fire -
resistance rated wall to guide proper construction and inspection.
Revised til 6 and added UL Design UL263/U419 on Sheets 1-11.1 & I-
11.2.
d. Change on the plans as needed the installation criteria of the various
materials represented to coincide with that required in UL Design No. 419.
For example, there does not appear to be an allowance for the spacing of
fasteners used to attach floor or ceiling runners at greater than 24" on -
center.
Revised til 6 andsin UL263/U41 9 on Sheets 1-11.1 & I-
11.2.
19. Detail 9 — Med Gas Tank Storage Room — Change on the plans the required
fire -resistance rating of the door(s) used to access the 'med gas tank storage
room' from '45 -MIN' to `1 HR' per International Fire Code (IFC) 5306.2 — see also
review note #26.b. below.
Revised.
20. Detail 10 — Partial Ht. Partition Bracing — Provide on the plans a table, or indicate
the 'measure' (expressed in inches/fractions of an inch), needed to determine the
height of the vertical element of the bracing required for the partial height
partition to be constructed.
Added ll Type El and E2 to confirm finished wall height requirements. it
10/1-9.1 confirms structural stanchion i is to match the height
partition.
On sheet 1-9.2 — Ceiling Details:
21. Detail 9 — Cantilevered GWB Soffit at Entry
a. Clarify the noted allowable deflection measurement found in the
information regarding the deflection track. The information could not be
found in the provided structural calculations — see also review note # 16.a.
425 641 9200 1 909 112th Ave NE Suite 206 Bellevue, WA 98004 i www,jpcarchitects.com
J C ARCHITECTS
above.
Detail has been revised —rfr to Structural Engineerrs ons c .
b. See review note #16.b. above.
Detail has been revised —rfr to Structural Engineerrs ons .
22. Detail 15 — Ceiling Mounted Equipment — Clarify the reference to detail '8/1-9.1'
for the required attachment to the structure above to support ceiling mounted
equipment. The referenced detail does not appear to apply. Verify that any
detail provided and referenced in response to this review comment accounts for
the tension loads developed by the variety of equipment to be installed.
Detail has been revised —rro Structural Engineerrsos til
attached.
23. Detail 16 — Wood Veneer Bridge at Hallway
a. Clarify the noted allowable deflection measurement found in the
information regarding the deflection track. The information could not be
found in the provided structural calculations — see also review note # 16.a.
above.
Detail has been revised —rfr to Structural Engineerrs ons c.
b. See review note #16.b. above.
Detail has been revised —rfr to Structural Engineerrs ons c .
On sheet 1-9.3.1 — Casework Details:
24. Detail 1 — Standards & Brackets - Clarify the difference in the noted height above
finished floor for the installation of the shelving bracket and of that indicated on
sheet 'I-3.1' — Floor Plan — Key Notes — Note #8 — see also review note #8
above.
Installation of rcket height on Detail -.1 has beenris .
25. Detail 3 — Lead Apron Hanger — Clarify the note for the installed height of the
hanger to 'REFER TO ELEVATION'. Elevation '5/1-8.3' does not appear to
specify the installation height.
Installation i s been added to Detail 3/1-9.3.
On sheet 1-10.1 — Door Schedule, Elevations & Details:
26. Door Schedule
a. Clarify on the plans the indicated fire -resistance rating of door' 104'. It
does not appear to meet the requirements for use as an interior exit
stairway fire barrier opening protective per IBC Table 716.5.
Revised 1 -Hr Rating.
b. Clarify on the plans the indicated fire -resistance rating of door '122'. It
does not appear to meet the requirements for an opening into a one-hour
rated interior medical gas room per IFC 5306.2. The assembly is also
required to provide smoke- and draft -control and be labeled per IBC
716.5.7.3 -see also review note #19 above.
Revised 1- r Rating withregarding smoke & dr r I. Also
revised til 9/1-9.1.