Loading...
20160425093815.pdfFebruary 18, 2016 Carrie Anderson Venture General Contracting 1518 1' Avenue South, Ste. 400 Seattle, Washington 98134 RE: Point Edwards 10 • Revised Pricing 2/18/2016 We submit the following proposal for Point Edwards 1U Project, located in Lynnwood WA, per provided landscape and irrigation plan pages Irl Through L-5 and 1R-1 through IR -5 dated 10/30/2015 and L101, L121, L131, L132 and C10 dated 10/22/15. No other plans, specifications or details were available for review. Landscaping $211,600.00 (Revised) o Alternate #1: Install 50/50 topsoil ($15,400.00) In Lieu of Lightweight Soil a Irrigation $ 34,900.00 ALTERNATES