Loading...
20160512095234.pdfC C L L I N S ARCHITECTURE • PLANNING • INTERIORS • SUSTAINABILITY M 710 SECOND AVENUE • SUITE 1400 3SEATTLE WASHINGTON 98104.1710 y T • 206 245 2100 F • 206 245 2101 Z May 11, 2016 Leif Bjorback Building Official City of Edmonds 121 5th Avenue North Edmonds, WA 98020-3145 Re: Swedish Edmonds IR -Cath Tenant Improvements Description of Revisions by sheet Dear Leif: E '! U r 91p 9ElQ 't RuQ DEP)W1°10 V1,11. C''17Y (),P r:M)ND G2.4 • Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C • Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C AD2.11 • Revised Keynote 8 A2.1 • Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C • Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C • Revised location and types of door auto -operator wall devices A2.11 • Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C • Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C • Revised location and types of door auto -operator wall devices A2.12 • Revised location and types of door auto -operator wall devices A2.32 • Revised Door/Opening Schedule 0 102A: Remarks 0 106A: Remarks 0 112: Remarks and Fire Rating Label 0 113A: Remarks and Fire Rating Label 0 1138: Remarks 0 121 A: Remarks Swedish Edmonds IR -Cath Tenant Improvements May 11, 2016 Page 2 A3.1 • Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C • Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1 C • Removed section callout and poche indicating horizontal smoke barrier • Added section callout at DRSG 122 Sincerely, Bruce Lindeke Architect, Project Manager