20160512095234.pdfC
C L L I N S ARCHITECTURE • PLANNING • INTERIORS • SUSTAINABILITY
M
710 SECOND AVENUE • SUITE 1400
3SEATTLE WASHINGTON 98104.1710
y T • 206 245 2100 F • 206 245 2101
Z
May 11, 2016
Leif Bjorback
Building Official
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020-3145
Re: Swedish Edmonds IR -Cath Tenant Improvements Description of Revisions by sheet
Dear Leif:
E '! U r 91p
9ElQ 't RuQ DEP)W1°10 V1,11.
C''17Y (),P r:M)ND
G2.4
• Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C
• Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C
AD2.11
• Revised Keynote 8
A2.1
• Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C
• Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C
• Revised location and types of door auto -operator wall devices
A2.11
• Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C
• Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1C
• Revised location and types of door auto -operator wall devices
A2.12
• Revised location and types of door auto -operator wall devices
A2.32
• Revised
Door/Opening Schedule
0
102A:
Remarks
0
106A:
Remarks
0
112:
Remarks and Fire Rating Label
0
113A:
Remarks and Fire Rating Label
0
1138:
Remarks
0
121 A:
Remarks
Swedish Edmonds IR -Cath Tenant Improvements
May 11, 2016
Page 2
A3.1
• Changed 1 HR Fire Barrier to 1 HR Smoke Barrier, redefining Smoke Compartments 1A and 1C
• Eliminated 1 HR Smoke Barriers formerly defining Smoke Compartments 1A and 1 C
• Removed section callout and poche indicating horizontal smoke barrier
• Added section callout at DRSG 122
Sincerely,
Bruce Lindeke
Architect, Project Manager