2016-0553 NW Peak Brewery TI 2- Shapiro Arch.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
L
(425) 771-0220
DATE: September 30, 2016
TO: A.D. Shapiro Architects
Tony Shapiro
tony@adshapiro.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2016-0553
th
Project Address: 18502 76 Avenue W
Project: NW Peak Brewery TI
Scope: Convert auto service center to restaurant and brewery (16% or less alcohol
content) use A-2/F-2 occupancy groups unknown number of occupants V-B
construction - NFPA-13 sprinkler system not required mechanical and plumbing
not included
disapproved
Please be advised that the building plans for the above referenced project have been
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
.
information, clarifications, or changes are neededReviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the clouded or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
nd
Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
General Review Note:
1.On the WSEC Mechanical Summary MECH-SUM Complete the resubmitted form,
including the Mechanical Systems Summary. Of particular concern is the use of a gas
fired unit heater, sized and installed in an existing unconditioned, uninsulated, limited-
access S-1 occupancy now proposed to be used to provide comfort heat for a restaurant
and brewery A-2/F-2 occupancies. The proposed method of providing the required
outdoor air for the uses of space per IMC Table 403.3 must also be indicated on the plans.
2.On the WSEC Interior Lighting Summary LTG-SUM
a.Clarify on the form the Project Description selection of Alteration. The proposed
change of use and change of space use from an unconditioned, uninsulated, limited-
access S-1 occupancy to that of an restaurant and brewery A-2/F-2 occupancies
required compliance as a New Building per WSEC C101.4.4. Provide updated
compliance forms reflecting the proposed lighting in compliance with C405.5.
b.Clarify the difference in the indicated Interior Lighting System Description of lay
in ceiling with flourscent (sic) fixtures throughout and of that noted on WSEC
Interior Lighting Summary Space-By-Space LTG-INT-SPACE on WSEC
Interior Lighting Summary Building Area Method LTG-INT-BLD and on sheet
A110 Detail 5 Reflected Ceiling Plan.
3.Clarify the submittal of both the WSEC Prescriptive Path ENV-PRESCRIPTIVE - and the
WSEC Component Performance ENV-UA Code compliance forms. The selected
compliance path on the submitted WSEC Envelope Summary ENV-SUM is indicated to
be Prescriptive and provides the perspective for the following review comments:
4.On the WSEC Envelope Summary ENV-SUM
a.Clarify on the form the indicated Vertical Fenestration and Skylight Area
Calculation information. It does not appear to reflect that of either the heated or
semi-heated spaces indicated on sheet A101 Detail 2 Code Plan see also
plan review comment 4.b below.
b.The project is indicated to contain semi-heated spaces. Semi-heated spaces shall be
documented separately from other conditioned spaces provide separate compliance
forms for each conditioned space. Note that envelope elements, such as interior
walls separating semi-heated spaces from other conditioned spaces in the same
building, are required to comply with exterior thermal envelope requirements and be
specified as applicable on the plans.
5.On the WSEC Prescriptive Path ENV-PRESCRIPTIVE - Complete the resubmitted form,
including the information regarding each of the building components in compliance with
that required per WSEC Table C402.2, such as R-49 roof insulation when placed below
the roof deck.
On sheet A102 Site Plan:
6.Detail 1 Site Plan Indicate on the plans the required marking to discourage parking in the
access aisle of the accessible parking space per ICC A117.1-2009 section 502.4.4.
On sheet A101 Cover Sheet:
7.Scope of Work
a.Clarify on the plans the difference in the proposal to provide R-30 roof insulation
below the roof deck and of that required per WSEC C101.4.4/Table C402.2 and
indicated on sheet A111 Building Elevations, Sections Detail 5 Section at
Brewery, Tank, & Tasting Rooms.
b.Clarify on the plans the difference in the identified use of space #102 Serving
Room - and of that indicated on sheet A101 Cover Sheet Detail 2 Code Plan.
Page 2 of 6
8.Energy Code - Clarify on the plans the difference in the proposal to provide R-15 wall
insulation and R-30 roof insulation and of that required per WSEC C101.4.4/Table
C402.2. Update the provided information to reflect that determined to be in compliance in
response to plan review comment #2 4. The response to the earlier plan review comment
Clarified difference to provide R-15 wall insulation and R-30 roof insulation
states:
per WSEC C101.4/TableC402.2. Updated information to reflect the attached Energy
form referenced in response 2a
. No change appears to have been made and the
information provided on the referenced form is incomplete.
9.Building Code Data
a.Clarify on the plans the note: Occupancy based on Sec 508.3.1 non-separated
occupancies, with A-2, standing space as the governing occupant load per table
1004.1.2.. Function of space and occupant load factors per IBC Table 1004.1.2 are
not factors in determining compliance with IBC 508.3.1.
b.Non-Separated Occupancy Calculation - Reformat and update the provided table on
the plans to properly indicate that proposed and required per IBC Table 503 and IBC
Table 1004.1.2.
c.Non-separated Occupancy Calculation - Occupancy Group Public Eating/Seating,
15 sf/occ A-2 Occupancy - Clarify on the plans the applied occupant load factor
per IBC Table 1004.1.2. Benches, booths, barstools and other seating types, as well
as standing areas, have specific occupant loads factors different than that indicated
for tables and chairs. The indicated area also appears to include space 104
Vestibule space 105 Men space 106 - Women space 107 Brewing
and space 108 unspecified - which should have the appropriate function of
space factor per IBC Table 1004.1.2 applied for the proposed uses.
10.Detail 2 Code Plan - Clarify on the plans the applied occupant load factor for the space
identified as Bar Room per IBC Table 1004.1.2 Benches, booths, barstools and other
seating types, as well as standing areas, have specific occupant loads factors different than
that indicated for tables and chairs see also plan review notes 9.b and 9.c.
On sheet A110 Plans and Details:
11.Detail 1 Seating Plan Indicate on the plans the required minimum and maximum heights
of the accessible portion of the bar above the floor per ICC A117.1-2009 section 902.4.
12.Detail 2 Toilet Room Elevation Clarify on the plans the specified distance above the
floor for the placement of the vertical grab bar. It does not appear to comply with that
required per ICC A117.1-2009 section 604.5.1.
13.Detail 3 Fermenting Vessels Provide on the plans a detail, and a reference to it for the
required attachment of the fermenting vessels (and those marked HLT, MT, and BK) to
resist seismic loads per IBC 1613.1/American Society of Civil Engineers (ASCE) 15.1.1.
Provided detail for required
The response to the earlier plan review comment states:
attachment of fermenting vessels, HLT, MT, and BK to resist seismic loads per IBC
1613.1/ASCE 15.1.1.
. A detail for the attachment and engineering supporting the design
could not be found among the resubmitted construction documents.
14.Detail 4 Toilet Room Enlarged Plan
a.Clarify on the plans the specified distance from the rear wall for the placement of the
vertical grab bar. It does not appear to comply with that required per ICC A117.1-
2009 section 604.5.
Page 3 of 6
b.Clarify on the plans the indicated distance from the edge of the lavatory to the
sidewall adjacent to the toilet. It does not appear to provide the required minimum
clearance per ICC A117.1-2009 section 604.3.1.
15.Detail 11 Floor Plan
a.Indicate on the plans the required minimum maneuvering clearances in space 104
Vestibule per ICC A117.1-2009 section 404.2.3. Indicate on the plans if a door
closer is to be installed on the doors to the restrooms (the information was not
included in the HDW Group section of the Door Schedule).
b.Indicate on the plans the required attachment at the base and top of the full-height
interior walls to guide proper construction and inspection.
16.Door Schedule
a.Clarify on the plans the information provided for the following doors:
Mark 1
·
Mark 3
·
Mark 5
·
Mark 101D
·
Callouts for doors marked as above could not be found on the plans.
b.Indicate on the plans the required door hardware on accessible doors that do not
require tight grasping, pinching, or twisting of the wrist to operate per IBC
1008.1.9.1 and ICC A117.1-2009 section 404.2.6.
c.Indicate on the plans the required door hardware and signage for the door marked
101A in space 101 Tasting Room per IBC 1008.1.9.3.
d.Indicate on the plans the required panic hardware for the door marked 102 in
space 102 Serving Room per IBC 1008.1.10.
17.Window Schedule
a.Clarify on the plans the information provided for the following window:
Mark 9
·
Callouts for a window marked as above could not be found on the plans.
b.Clarify on the plans the count for the windows marked Exist. It appears to be
greater than that represented on the plans.
On sheet A111 Building Elevations, Sections:
18.Detail 2 South Elevation Clarify the representation of the wall height of the portion of
the structure from gridline C to D. It does not appear to reflect the existing conditions,
especially the area above the proposed restrooms. Provide a detail for the required
wall/parapet construction above the roof surface. The response to the earlier plan review
Clarified representation of wall height of the portion of structure
comment states:
from gridline C to D. Provided detail for the required wall/parapet construction
above the roof surface.
. No changes, explanation, or detail could be found on the
resubmitted plans.
19.Detail 4 North Elevation
a.Indicate on the plans the location of the door marked 101F on sheet A110
Detail 11 Floor Plan.
Page 4 of 6
b.Clarify the representation of the wall height of the portion of the structure from
gridline C.4 to D. It does not appear to reflect the existing conditions. Provide a
detail for the required wall/parapet construction above the roof surface. The
Clarified representation of
response to the earlier plan review comment states:
wall height of the portion of structure from gridline C.4 to D. Provided
detail for the required wall/parapet construction above the roof surface.
. No
changes, explanation, or detail could be found on the resubmitted plans.
20.Detail 5 Section at Brewery, Tank, & Tasting Rooms - Clarify on the plans the difference
in the proposal to provide R-39 roof insulation below the roof deck and of that required per
WSEC C101.4.4/Table C402.2
21.Detail 9 Scupper Detail at Roof - Clarify on the plans the difference in the proposal to
provide 2 inches of R-24.5 foam insulation and 3-1/2 inches of R-15 batt insulation
below the roof deck and of that required per WSEC C101.4.4/Table C402.2
On sheet S-2 Structural Plans:
22.Detail 1 Main Floor
a.Clarify on the plans the difference in the length and placement of the shear wall and
anchorage along the east side of the structure and of that indicated for shear wall
LA in the provided structural calculations. The wall openings for the windows and
door do not appear to have been accounted for in the provided structural calculations.
b.Clarify on the plans the difference in the length and placement of the shear wall and
anchorage along the north side of the structure and of that indicated for shear wall
TB in the provided structural calculations. The wall opening for the window does
not appear to have been accounted for in the provided structural calculations.
c.Clarify on the plans the difference in the length and placement of the shear wall and
anchorage along the south side of the structure and of that indicated for shear wall
TF in the provided structural calculations. The wall opening for the door does not
appear to have been accounted for in the provided structural calculations.
d.Clarify on the plans the difference in the length and placement of the shear wall and
anchorage along the south side of the structure and of that indicated for shear wall
TE in the provided structural calculations. The wall openings for the existing
windows do not appear to have been accounted for in the provided structural
calculations.
23.Detail 2 Roof Level
a.Clarify on the plans the indicated portion of the roof to be raised to match the
surrounding roof. It does not appear to reflect the existing conditions, especially
the area above the proposed restrooms. The response to the earlier plan review
Response: Please see attached south elevation (page 2) showing
comment states:
the southeast portion of the building whose roof will be raised (clouded in red)
to match the elevation of the rest of the building. The roof of the restroom area
does not need to be raised.
. There are plan review concerns regarding the
representation of the structure on the South Elevation (as well as the East
Elevation and the North Elevation) see plan review comments 18 and 19.b. - that
have been substantiated by site visits to the proposed project site. To date, an
accurate representation of the existing structure, or of the areas to be altered and the
required construction, has not been provided.
Page 5 of 6
b.Indicate on the plans the minimum construction to support the loads over the door
marked 101F on sheet A110 Detail 11 Floor Plan in the north wall of
space 107 Tank Room.
c.Indicate on the plans the minimum construction to support the loads over the
windows marked Exist on sheet A110 Detail 11 Floor Plan in the south
wall of space 107 Tank Room.
d.Indicate on the plans the minimum construction to support the loads over the door
marked 101A and the windows marked 01 on sheet A110 Detail 11
Floor Plan in the east wall of space 101 Tasting Room.
On sheet S-3 Structural Details:
24.Sections 1, 2, 3, 4, and 5 Specify on the plans the minimum fastener for the attachment of
the A35 framing anchors to the roof sheathing. The proposed installation does not appear
to allow for the fastener specified by the manufacturer.
Page 6 of 6