Ms. Linda Thornquist - Senior Permit Coordinator
City of Edmonds
Development Services Department
121 5th Ave North
Edmonds, WA 98020
REGARDING New Proposed MGP Shops Building shell, Edmonds, WA - Revisions to permit
set.
Plan Check: BLD2015-0520
Project Address: 21940 Highway 99
MCG Project No. 14046.99
Dear Ms. Thornquist:
This letter is to accompany the submittal for plan check of the above referenced project
which has already received a building permit. The reason for the resubmittal is that the
drawings have been revised because of the following:
1. A second door added to the Utility Room that was requested by Kevin Zweber,
Fire Official. Leif Bjorback is aware of this change, and asked me to send you
copies of the revised sheets. Drawing sheets A1.00, G0.03, A1.01, A2.01, A6.04,
52.1, 52.2, and E1.0 show this change.
2. The trash enclosure has been reduced to 9' deep based on a conversation
between the owner, Jeff Hughes of Merlone Geier, and Steve Fisher. Drawing
sheets A1.00, A1.0013, C1.0 and C2.0 show this change. A man door has also been
added to the side of the enclosure for easier access.
3. The new site lighting has been adjusted. My electrical engineer has spoken to
Michael Clugston about this change. Drawing sheet ES1.0 and A1.00 show this
change.
4. The structural engineer has some roof framing revisions shown with the clouds
and delta 4 symbols on sheets 52.2 and 58.2.
Please find 3 copies of the revised construction drawing sheets enclosed (13 sheets per
set — sheets A1.00 to C-2.0). All changes have been clouded and labeled with a delta 3
0
U
C/J =
U ¢U D
Z Z W ¢Z¢
Retail. Entertainment. Hospitality. Office a A o o
OT 415.974.6002 Or 415.974.1556 250 Sutter St., Suite 500 San Francisco, CA 94108
I:\0. Admin, In Bax\Marjorie Naylor\GenerahSupplies\LeOerhead.Docx (204-15)
Ms. Linda Thornquist - Senior Permit Coordinator
New Proposed MGP Shops Building shell, Edmonds, WA - Revisions to permit set.
May 26, 2016
Page 2
and/or 4 symbol. 3 copies of revised structural calculations have also been attached for
the revision listed above.
Please let me know if you have any questions. Thank you for your help.
Sincerely,
MCG ARCHITECTURE
Wayne Dong
OLE Oocumentl (204-1.5)