2016-0603, 0605, 0609 Bracketts Lots 5, 7, 9.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 26, 2016 TO: Pride Ventures, LLC Jake Lyon jake@prideventuresllc.com FROM: Andrew Gahan, Plans Examiner th RE: Permit Numbers: BLD2016-0603 – Building 5 (21270 80 Avenue W.) th BLD2016-0605 – Building 7 (21276 80 Avenue W.) th BLD2016-0609 – Building 9 (21254 80 Avenue W.) Project: Brackett’s Corner Detached Condominiums During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Sheet A2.0 1.The note sheet references the Seattle Building Code. Please update this sheet with the appropriate Code references. Sheet A2.1 2.See item 1 above. Sheet S2 3.Detail GPA shows that the lag bolts are to be concealed under the post (2” edge distance at each side), but the calculations provided show the bolts configured with ½” edge distance. Please revise the detail or revise the calculations to match. Sheet S5 4.Verify that the lower floor SW-B4 shear wall specified adjacent to the stairs is correct. No such specification could be found in the calculations. 5.Member 2-7 could not be found on the plans, however the header in the upstairs bedroom (adjacent the bonus room) appears to match the loading criteria shown for 2-7. That calculations calls for a (3) 2x8 header but that header was not so specified. Please verify.