20160630083931.pdfr* CITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: June 15, 2016
TO: John Barker
.1ohn crrbarl er. orr
Patrick Doherty
ats� ic, . p11er°t used.. irioii isw a. � vv
FROM: Jeanie McConnell, Engineering Program Manager
j trniq,; I cconn�r l Pty .r qy
RE: Application #: bld20160728
Project: City of Edmonds Plaza and Restroom
Project Address: 121 — 5th Ave
During review of the above noted application, it was found that the following information,
correctior°rs, or clarifications are needed. Reviews by other divisions, such as Planning, Biiildirig, or
Fire may result in additional come -rents, please redline plans or S Ubmit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
GENERAL
1. Please add a note to plans stating "A separate right-of-way construction permit is required for all
work within the city right-of-way." Please note, a ROW permit application with contractor's
signature shall be provided to the city prior to issuance of civil construction plans.
2. For information only, it is understood that PUD will need an easement to locate their pole on the
west side of the proposed restroom building. This will not be a condition of this building
permit, as the pole relocation will occur outside of this process; however, coordination with
PUD should occur as soon as possible to prevent delays later on in the project.
Sleet 113 ll ESC 4, l emnolition flan
1. Reference City standard details for catch basin filter socks — detail E1.3.
2. Straw wattles are shown to surround the catch basins, which is not a required BMP. Straw
wattles, if used, should be placed at the downslope edge of excavations to prevent silt laden
runoff from crossing the parking lot, leaving the property, and/or entering the storm system.
3. Consistent with note 2 above, add notes to the plans to indicate how the excavation areas will be
protected to prevent silt laden runoff.
4. TESC/Demo Note #4 states staging will be located adjacent to parking. Please clarify. Will
staging be provided within the existing parking lot or off-site?
5. Construction fencing is shown to incorporate the existing sidewalk. Sidewalk closed signage
will be required at each end of the closure. Callout required signage on the plan.
Sleet 1.4 — Grading, D,rahiaget and Utility flan.
1. The existing water meter shown to supply the proposed restrooms is actually an abandoned
service and cannot be reused. Please show a new water service from main line to property line,
with meter installation.
2. Where the irrigation line splits off from the domestic service, a DCVA is required. This needs
to occur immediately after the split and therefore aligning meter and DCVA to the north of the
plaza entrance would be appropriate.
3. Please confirm what style of toilet will be installed in the restrooms so the meter and service line
size can be confirmed to be sufficient. At this location the pressure at the City main line is
about 100psi.
4. Callout sanitary sewer pipe material and depth at cleanouts. A cleanout will be required within
2 -feet of the outside of the building and also at the property line.
5. A 12" cast iron lamphole cover shall be installed per City standards at the cleanout at the
property line. Please revise plans accordingly and reference City standard detail Earl.
6. Reference,;`ifor installation of the sewer lateral (from main to property
line).
7. As shown on the plans, the site contains an existing, storinwater detention system. 'nie
stormwater calcs recovered from City records, � i��. indicates the
detention system was sized for 6365sf of impervious surface area and 835sf of landscape yard
area (total of 7200so. Provide calculations on this plan sheet indicating the following:
a. Areas of existing impervious surface area to be removed and replaced by impervious
surface area.
b. Areas of existing impervious surface area to be removed and replaced with landscaping.
c. Areas of existing landscaping to be removed and replaced with impervious surface area.
8. The impervious surface area/site classification worksheet does not accurately represent the
existing and proposed site conditions. The request for clarification noted above should help sort
out the stormwater management requirements for the subject project. Please keep the following
in mind:
d. All impervious surface areas on this site are regulated and would therefore not be
exempt from stormwater management.
e. Any existing impervious surface area proposed to be replaced with new impervious
surface area would fall into the Replaced Regulated category.
Page 2 of 3
f. If the proposed final conditions for the site indicate impervious surface area in excess of
what the original detention system was designed for, then additional stormwater
management may be required.
g. If stormwater mitigation is proposed, the submittal shall clearly indicate the proposed
method of mitigation and any supporting documentation should be provided. The site
classification worksheet provided indicates 1024sf is proposed to be mitigated through
low impact development techniques and the plaza is shown to be constructed of pervious
pavers on the site plan. There is no indication of this stormwater management approach
on the plan and supporting documentation for the design has not been provided.
9. If pervious pavers are being provided as a stormwater mitigation measure, as indicated on sheet
L5, please provide details related to infiltration and construction of the paver system consistent
with paver specs and CLjty haridotit 1.'2?'Ili. In addition, if low impact development techniques are
proposed as a mitigation measure, a covenant will need to be recorded against the property.
This is standard documentation on a City approved form and noted here only as reference.
10. Please show the new location for the relocated power pole. I understand the pole will be located
in the planter area on the west side of the restroom.
Sheet L5 — Site Plan
1. This plan sheet includes utility information that is not provided on Utility Plan sheet L4. Please
remove specifics related to the utilities from the Site Plan and provide all utility information on
Sheet L4 — Grading, Drainage and Utility Plan.
Page 3 of 3