20160705100429.pdfDATE;. June 23, 2016
TO:
FROM
RE:
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425)771-0220
City Website: ww,edznondswa, ov
Dennis Titus
dennist@cgengineering.com
Jeanie McConnell
Engineering Program Manager
Application #: bld20160672
Project: Peoples Bank - Sign
Project Address: 111 Main Street
°3t'¢t �;6rb�xn i�r ;brF�i�e i F� !ba
ra)+5
During review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Reviews by other divisions, such as Planning and Building, may result in
additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a
written response to each of the items below to a permit coordinator.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit
Center hours are M, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays.
City of Edmonds handouts, standard details and development code can be referenced on the City website.
Comments 1 — June 9, 2016
Comments 2 — June 23, 2016
1. June 23, 2016 — Thank you for providing a site plan.
a. The plan indicates a new 7 -foot sidewalk, however, a ,,sidewalli is not beingroposed
with this project �. corrects w. t � . , � ,i �mwf�� a % � - , t- A,,.1 W
b. Dimensions have been placed on the photos provided on the site plan and the dimension
through the sidewalk is noted at 7 -feet on an angle. The plan actually says 7 -inches, but it
can be assumed 7 -feet was the intent. Is this supposed to be a measurement from the face
of the new colunin to the curb? Please clarify the intent of this measurement..
bld20160672 - peoples bank - sign2.docx Page 1 of
2
c. Please confirm the proposed column will be placed against the existing brick column and
fall to the north of the existing landscape area (and not in the sidewalk). With the notes
provided on the photos it is now unclear where the column will sit in relation to the
sidewalk. V % t n
6/91201.6 corn lent - Provide a site plan that cleanly shows the sidewalk, property line, column and
sign location., 'tv<eA Avawk%-',j
2. ok
3. June 23, 2016 — Thank you for providing a street use permit.
a. The street use permit is required to locate a sign over the City sidewalk. The description
of public use provided on the street use permit, however, indicates closure of sidewalk and
parking stalls. A right-of-way construction permit, which has already been submitted, is
required for the closure of the sidewalk and parking stalls. Please revise the street use
permit description of use to be consistent with place nt of a sign overhanging the City
sidewalk. -11 W Al��..1 t� r V\ ', � tm ' m" o P,
b. The insurance certificate notes Berry Sign Systems as the insured. Tile business, People's
Bank, or the property owner, shall be the insured, not the sign company. o '- x
c. Please revise the Certificate Holder information on the insurance form to be consistent
with the information provided in the City handout. The City of Edmonds Engineering
Division at 121 _ 5"' Ave N, Edmonds WA 98020 shall be named as the certificate holder.
6/9/2016 comment - A Street Use Permit is required to install a sign over the City sidewalk. While
blade signs are exempt from this requirement, a street use permit will still be required for the proposed
wall sign. Please refer to City of Edmonds Handout E'75 — Strcet 11sr.wPenni lmmlt rril- inerts for
additional information. Please read the handout thoroughly and submit all required information,
including a certificate of insurance including specific language and confirming required coverage
amounts.
bld20160672 - peoples bank - sign2.doex Page 2 of
2