Loading...
20160729163435.pdfALEXANDRA L. wmw ESI TI L IIDII SIIGI u..i...�:: 5,325 BaIIIIard Avc% NMI, Slidue 203 NVA 981017 - 206 276 ')"7 11 .rIlc/�aue dliiramCeNlIIIe^xa11111 I1-1iiomiilInofeIdesigilliA1011111 CORRECTIONS: Submitted July 29, 2016 PROJECT # BLD20160695 OWNER: Greg and Stephanie Schuler ADDRESS: 932 Alder St., Edmonds WA 98020 Response to Corrections Notice #1 Planning 1. A new critical area checklist is required since the existing one is more than 5 years old (from 2006). Critical area checklist has been submitted. 2. Datum point. Please identify the datum point used for the height calculations, labeling its elevation, whether actual or assumed. Site Plan A1.0 has been updated to include Datum point. 3. Hot tub. If the hot tub is greater than 3' in height, it must be included in the structural lot coverage calculation. Please make any revisions as required. Hot Tub height has been added to Site Plan A1,0. Engineering 1. The water and sewer are shown as the same line. Please revise the plans accordingly. Site Plan A1.0 has been updated to show the current location of the water meter and water line. 2. Show how the surface water runoff from the new impervious area will be collected and discharged to the onsite stormwater management system. Notes have been added to Site Plan A1.0 to describe how surface water runoff from the new impervious surface is to be collected and discharged. Sincerely, Alexandra Immel