20160729163443.pdfcivil & structural EIIIGINEERII IG engineering &planning July 29, 2016 Jennifer Lambert, Engineering Technician City of Edmonds Second Floor City Hall 121 51h Avenue N Edmonds, WA 98020 RE: Application #BLD20160695 Review Comments #1 Project Name: Schuler Residence Project Address: 932 Alder Street Dear Ms. Lambert, Itemized below is our response to the review comments in the July 22, 2016 letter for the above referenced project. Our response appears in bold. Cover Sheet & Site Plan 1. The water and sewer are shown as the same line. Please revise the plans accordingly. Please refer to the correction response letter dated July 29, 2016 by Alexandra Immel. 2. Show how the surface water runoff from the new impervious area will be collected and discharged to the onsite stormwater management system. Please refer to the correction response letter dated July 29, 2016 by Alexandra Immel. Stormwater Review Comments from Herrera 1. The Infiltration Sizing Summary (4/5/16) is missing the following information: a. Project category (Category 1 Small Site Project). Section I revised as noted. b. Drainage basin/Watershed name. Section I revised as noted. 2. The Infiltration Sizing Summary (4/5/16) and Site Plan A1.0 (5/26/16) contain different areas for the proposed walkway and total impervious area. Please update for consistency. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com Schuler Residence 16050.20 July 29, 2016 Comment Response #1 Page 2 of 2 ..................... _ ..... Infiltration Sizing Summary (4/5/16) Site Plan A1.0 (5/25/16) ..-.......�..... .. _ ....... Walkway 129.61 sf 142.9 sf Total Impervious 4014.23 sf 4,027.52 sf The Infiltration Sizing Summary has been updated. Please verify that the depth of aggregate for the existing infiltration trench is 3 feet. If the existing infiltration trench has a 3' aggregate depth, the existing trench was slightly oversized and the proposed infiltration trench system length could be decreased slightly. Based on the total impervious area (4,014.23 sf), the total infiltration trench system length would need to be 72.25 LF (using a 1.8% sizing factor and a 3' aggregate depth). The additional infiltration trench length needed would be 12.25 LF, instead of the proposed 21.16 LF. The existing trench was designed, permitted, and constructed by others in 2006-2007. As-builts of the system, infiltration testing, and/or engineering reports were not found for this work. The project proposes only infiltration for the new and replaced impervious surfaces, which include the unpermitted impervious areas that have been added since the original approval. 4. The Section II calculations include a typo (2828.55 sf should be 2838.55 sf); however, the calculated result (1,176 sf) is based on the correct value of 2838.55 sf. Corrected. If you have any questions or comments regarding the responses to this review please do not hesitate to call. Sincerely, CG Engineering Greg Guillen, PE, SE Principal 250 4th Avenue South, Suite 200 Edmonds, WA 98020 �I�MINf�� ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com