Loading...
20160802100650.pdf2nd August 2016 City of Edmonds Public Works Department 121 - 5th Ave North Edmonds, WA 98020 RE: permit # BLD 20160096 21911 93rd Ave. W. Attn: Jennifer Lambert Dear Reviewer; This letter is written in response to the Engineering Plan Review Comments dated the 29th of July 2016 for the above noted project. The comments are numbered as noted in your letter. They also should reflect our discussion at the city on 12th July 2016. 1T1A PLAN J 1 of 4 All revision made to all other sheets have been revised to match sheet 1. GRADING & TES'C PLAN 2 OF 4 1,2& 3 noted as OK GENERAL 1. noted as OK New Comments - 7/6/ 2016 1. The engineer of record wants to inspect the trench excavation as a special inspection. A signed form is attached. 2. Note # 8 has been revised to show a drywell outlets more than 5 feet from the property line. 3.a Inspection will be done on both A & B trenches. See revised # 3. b. A 4" tee is noted on note # 7. c. Note 20 has been removed d. THE Figure A-5 is shown on sheet 4 of 4. 4. noted as OK WATER 1, 2 & 3 noted as OK SEWER 1,2,3, 4 & 5 noted as OK STORM 1. noted as OK 2. noted as OK 3. noted as OK 4. The detail of CB # 2 on sheet 4 shows 2' of cover, 5, 6, 7 & 8 noted as OK 9. Noted as OK New Comment 10. A new Drainage Narrative has been enclosed and stamped 2nd August 2016 11. The CB# 2 detail on sheet 4 of 4 has been revised to show a 2 cover from the overflow pipe. 7/6/2016 - Comments from Herrera 1. noted as OK DRY UTILITIES 1 & 2 noted as OK Three copies all 4 sheets of the plans are attached along with this resubmittal letter. Respcctfull Subn i A X, R. Mich t Span( PE RMS Engineering RMIS 11"]Ig,inee'riIu 2 HW 80th Ave V%/ AM Ediru'ioridls. WA 98026