20160802100650.pdf2nd August 2016
City of Edmonds Public Works Department
121 - 5th Ave North
Edmonds, WA 98020
RE: permit # BLD 20160096
21911 93rd Ave. W.
Attn: Jennifer Lambert
Dear Reviewer;
This letter is written in response to the Engineering Plan Review Comments dated the
29th of July 2016 for the above noted project. The comments are numbered as noted in
your letter. They also should reflect our discussion at the city on 12th July 2016.
1T1A PLAN J 1 of 4
All revision made to all other sheets have been revised to match sheet 1.
GRADING & TES'C PLAN 2 OF 4
1,2& 3 noted as OK
GENERAL
1. noted as OK
New Comments - 7/6/ 2016
1. The engineer of record wants to inspect the trench excavation as a special inspection.
A signed form is attached.
2. Note # 8 has been revised to show a drywell outlets more than 5 feet from the property
line.
3.a Inspection will be done on both A & B trenches. See revised # 3.
b. A 4" tee is noted on note # 7.
c. Note 20 has been removed
d. THE Figure A-5 is shown on sheet 4 of 4.
4. noted as OK
WATER
1, 2 & 3 noted as OK
SEWER
1,2,3, 4 & 5 noted as OK
STORM
1. noted as OK
2. noted as OK
3. noted as OK
4. The detail of CB # 2 on sheet 4 shows 2' of cover,
5, 6, 7 & 8 noted as OK
9. Noted as OK
New Comment
10. A new Drainage Narrative has been enclosed and stamped 2nd August 2016
11. The CB# 2 detail on sheet 4 of 4 has been revised to show a 2 cover from the
overflow pipe.
7/6/2016 - Comments from Herrera
1. noted as OK
DRY UTILITIES
1 & 2 noted as OK
Three copies all 4 sheets of the plans are attached along with this resubmittal letter.
Respcctfull Subn i A
X,
R. Mich t Span( PE
RMS Engineering
RMIS 11"]Ig,inee'riIu 2 HW 80th Ave V%/ AM Ediru'ioridls. WA 98026