Loading...
20160808112206.pdfRandall J. Munson Building Designer 17713 1511 Avenue NE— Suite 102 Shoreline, Washington 98155 (206) 349-4551 August 2, 2016 Andrew Gahan, Plans Examiner City of Edmonds - Building Department 121 5th Avenue North Edmonds, Washington 98020 Re: 18626 94th Avenue West Project No. BLD20160215 The following is an item by item response to your correction letter dated April 26, 2016. Sheet A-4 1. Fan added to Sheet A-4, Z Fan added to Sheet A-4. Sheet A-6 3. Added Note to Sheet A-6 to clarify. Sheet A-7 4. Detail 7/A-12 is only for the porch condition. Added Detail 1/A-11 for ledger connection. 5. Added Detail 1 /A-11 for ledger connection. Sheet A-8 6. Added missing Hanger callouts. 7. Added note to clarify. Beam cantilevers, BM 16 to match floor joist depth. 8. Added Beam 24 to support. 9. Corrected on Sheets A-8, A-9 and A-10. 10. Noted Hangers to Rim Joist. 11. Added Joist Hangers to Clarify. but does not connect to BM 16. Increased depth of 12. Wendell revised his calculation, included with submittal. Page Two 18626 94t" Avenue West Project No. BLD20160215 Sheet A-9 13. Added missing hanger. 14� Added missing Shearwall. 15„ Added missing call out. Sheet A-10 16. The assembly is 2" of rigid foam (R 6.6 per inch) equals R13.2, that combined with th R-30 bat equals R-43.2. Sheet A-11 17. Framing revised to match. Sheet A-12 18. Detail 7/A-12 is only at front porch. 19. Revised notes. 20. Removed Detail 15/A-12. Please feel free to contact me directly at (206) 349-4551 if you have any additional concerns. Respectfully Randall J. Munsonf Building Designer