Loading...
20160808114011.pdfARCHITECTURE STUDIO of EVERETT 120T ffi AVEiR EVERETT WA 98201............ 200.931,0000 GARIN@ARCHSTU010EVERET1.0011 2016 August 05 Chuck Miller - Plans Examiner City of Edmonds Building Division 121 5th Avenue N Edmonds, WA 98201 8W H MWI [ 111'J' f-fl"M aN (,rN� Subject: BLD2016-0737 Plan Review Comments - Architectural Response Dear Mr. Chuck Miller, 0 The following is an itemized response to the corresponding comments in the above referenced letter. These response are limited to the architectural related items only. Response to other comments is by others. 1. Window/Skylight/Door Schedule a. Indicate on the plans the required safety glazing for the following windows: i. Marked 'W22' - per IRC R308.4.2. Ii. Marked 'W57' - per IRC R308.4.2. Glazing schedule revised to show safety glazing at windows'W22' and 'W57'. b. Clarify on the plans the difference in the indicated width of the window marked 'W47' and of that represented on sheets V.1' and 'S2.2', and depicted on sheet V.1'. The window size for'W47' is correctly called out on the window schedule and accurately shown on sheet 'A3.1'. The opening represented on V.1' and'S2.2' has been revised to reflect the true size/location of the opening. 2. Basement Level Plan a. Indicate on the plans the required carbon monoxide alarm per IRC R315.3. Note #12 has been revised to read that all smoke detectors are going to be combination detectors, monitoring smoke and carbon monoxide. b. Indicate on the plans the required local exhaust in space'002-Laundry' -per IRC M1507.4. IRC M1507.4 does not require local exhaust in Laundry rooms. An exhaust fan has been added to the Laundry room per your recommendation, but we would like to pursue ARCHITECTURE STUDIO of EVERETT 1201 COcofi ENUE EVERETT WA 992-0-1, mm 206.931.0900 CARIN@ARCOSTU010IVIRITT.COM additional clarification regarding this matter. 3. General Notes -Note #11 -(also Note #12 on sheets 'A2.1' and 'A2.2% and Note #7 on sheet 'A2.3') - Clarify the specified location of the dryer duct termination. It does not appear to coincide with that anticipated by the represented construction. Dryer duct installations must meet the requirements of IRC M1502. Notes have been revised to read that dryer duct will exhaust on south side of building. Drawing 1/A3.1 has been revised to show the location of the dryer duct termination. 4. Main Level Plan a. Indicate on the plans the required smoke alarms in each sleeping room per IRC R314.3.1. Combination smoke/carbon monoxide alarms have been added to sleeping rooms. b. Indicate on the plans the required carbon monoxide alarm per IRC R315.3. Note #13 has been revised to read that all smoke detectors are going to be combination detectors, monitoring smoke and carbon monoxide. c. Indicate on the plans the required local exhaust in space '109-Powder' -per IRC M1507.4. Local exhaust has been added to'109-Powder' per 'A2.1'. d. Clarify the callout for floor type 'F2' at the mid -level landing portion of space '102-Mud Room'. It does not appear to coincide with that anticipated by represented construction. 'A2.1' has been revised to clarify the flooring assembly at'102-Mud Room'. Floor assembly F2 occurs north of grid'13% and assembly'F4' applied to the remaining floor. 5. Upper Level Plan a. Indicate on the plans the required carbon monoxide alarm per IRC R315.3. Note #12 has been revised to read that all smoke detectors are going to be combination detectors, monitoring smoke and carbon monoxide. b. Indicate on the plans the required local exhaust in space'203-Toilet' -per IRC M1507.4. Local exhaust has been added to'203-Toilet' per'A2.2'. We hope that the response to items above sufficiently addresses your concerns. Please do not hesitate to contact me if you have any further questions. Sincerely, Garin Schenk, Architect Architecture Studio of Everett LLC N iMr a w I t wtiT ml it. C 0 M; 206.931.0990