Loading...
20160809104350.pdfPespmse t w„ City of Edmonds Al "LAN REVIEW COMMENTS BUILDING DIVISION � (425) 771-0220 I TO DATE: May 23, 2016 TO: JT & T Construction omerovaa gas ahtm,comra FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2016-0547 Project Address: 8418 Bowdoin Way Project: Noodle Hut TI Scope: Add wall to create hallway/public toilet facility for new tenant in a prior `B' occupancy restaurant - B occupancy group (per IBC 303.1.2) - unknown number of occupants - V-B construction - NFPA-13 sprinkler system not required- mechanical and plumbing not included Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until time revised plans/documents including a written response in iterni ed letter format indicating where The clouded' or otherwise hi bli ahted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General Note: 1. Provide on the plans as part of a complete permit application submittal per the City of Edmonds Tenant Improvement Permit Submittal Requirements' the following information: Specify the tyje of building construction per International Building Code (IBC) 602. C-a � Specify the o ancgroup of the proposed space and that of the adjacent spaces/tenantsper IBA Note if the building/tenant space is provided with an automatic fire sprinkler system and or lire lar�na systemxa ��t Note the�t''al square footage of the tenant space, ie smaller areas within the space, and the nurmtber of ernployees ',�Cn° 'PG 2- Label the use of all areas, rooms, and spaces Provide occupant load calculations using IBC Table 1004.1.2 as applicable for each of the function areas within the tenant space Provide a detail specifying the proposed wall construction, including the materials to be used, the minimum attachment at the bottom and the top of the wall(s), and bracing (if required) Indicate the type of proposed seating (fixed or moveable tables and chairs) and which will meet the accessibility requirements of IBC 1108.2.9.1 and ICC A117.1- 2009 section 902.1. +vide a copy of the Snohomish County Health District review/approval letter. On sheet 1 — Floor Plans: Indicate on the plans the proposed work to be done to meet the accessible route requirements of IBC 3411.7. The cost of providing the accessible route is not required to exceed 20% of the total project cost. Relocating the lavatory to an area outside of the required water closet clearance width per ICC Al17.1-2009 section 604.3.1 and adding grab bars per ICC A117.1-2009 section 609 could be done to meet the requirement. " :— Indicate on the plans the portion of the counter meeting the requirements or ICC Al 17. —2009 section 904.3. PG 4. Indicate on the plans the minimum required beam to support the loads over the proposed door in the south exterior wall to guide proper review, construction, and inspection. Provide a roof framing plan or beam calculations used to justify the specified beam. W or\ ey.-0, ""' \ yincLrl Page 2 of 2