Loading...
20160817163343.pdft J 4 Y':...4 1020 Bell St Edmonds, WA 98020 (425) 478-6057 August 5, 2016 Linda Thornquist Senior Permit Coordinator City of Edmonds (425) 771-0220 ext. 1336 RE: 1020 Construction and Structural Engineering Review Dear Linda, 1 1 iqpj%rTM, 001 10 hi the two letters from Mike Clugston (10/29/2015) and Chuck Miller (12/07/2015), there were multiple items that needed to be addressed that both Mike and Chuck called out. This letter serves as the summary to those comments along with our responses. Comment en:tlt Response Average Front Setback pending approval after Fee was paid and the front setback was approved payment for application fee (Mike's Letter) Datum Point needed on bench (Mike's Letter) Updated Site Plan including the Datum point for bench mark is included StorniWa ter Trench / Spreader (Mike's Letter) All details relating to the storm system has been included in the responses to 1020 & 1024 combined development plan Covered Decks not allowed in Critical Areas Basement floor deck was removed and a landing Setback (Mikes Letter) for the basement door was added Slope Considerations (Chuck's Letter) All details relating to the GeoTechnical details was included in the responses to 1020 & 1024 combined development plan Structural Concerns (Chuck's Letter - Multiple Our Structural engineer and architect have made Pages) numerous updates to address the concerns called out by Chuck Miller. Numerous comments about fixtures /BTUs, etc Included Original Application Page 2 and updated response document for page 2 Warm s n���� a.9s„ Arne & :d duel Gaenz