RE: 1020 Construction and Structural Engineering Review
Dear Linda,
1 1 iqpj%rTM, 001
10
hi the two letters from Mike Clugston (10/29/2015) and Chuck Miller (12/07/2015), there were multiple items that
needed to be addressed that both Mike and Chuck called out. This letter serves as the summary to those comments
along with our responses.
Comment en:tlt Response
Average Front Setback pending approval after Fee was paid and the front setback was approved
payment for application fee (Mike's Letter)
Datum Point needed on bench (Mike's Letter) Updated Site Plan including the Datum point for
bench mark is included
StorniWa ter Trench / Spreader (Mike's Letter) All details relating to the storm system has been
included in the responses to 1020 & 1024
combined development plan
Covered Decks not allowed in Critical Areas Basement floor deck was removed and a landing
Setback (Mikes Letter) for the basement door was added
Slope Considerations (Chuck's Letter) All details relating to the GeoTechnical details was
included in the responses to 1020 & 1024
combined development plan
Structural Concerns (Chuck's Letter - Multiple Our Structural engineer and architect have made
Pages) numerous updates to address the concerns called
out by Chuck Miller.
Numerous comments about fixtures /BTUs, etc Included Original Application Page 2 and updated
response document for page 2