20160921163333.pdf`l SPECIAL INSPECTION AND TESTING AGREEMENT
V,
Permit #: 13 to -D 24
ic4
Project:W'I—L". U�fr
Prior to issuance of a permit, this form must be completed in its entirety and returned to the Cityfor
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
S ecial Ins ection I+irro and Special Inspectors:
The Special Inspection firm of Construction Consultants of Washington LLC will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
Window Water Penetration Resistance Test Building Enclosure
per RCW 64.55.050(1)(a) per RCW 64.55 ( (.)11 112 11)1(1
All individual inspectors to be employed on this project must have substantial and verifia 7Itaitii 6�r
experience in building enclosure design and construction. The qualified inspector shall be free from improper
interference or influence relating to the inspection. Verification that the inspector and the firm are qualified by
education and experience to perform the work and testing required by the project design and specifications may
be requested.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. The signed letter will certify that the building enclosure has been inspected during the course of
construction or rehabilitative construction and that it has been constructed or reconstructed in substantial
compliance with the building enclosure design documents, as update pursuant to RCW 64.55.020. Any
unresolved discrepancies must be detailed in the final report.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
\\EDMSVR-DEPTFS\Building\Handouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55
COE.doc7/21/2016
Building.De atrt"I nt:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design ProfesAonatls,
The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that
all required City approvals are obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of RCW 64.55, the IBC, the
approved plans, and this document, may void this agreement and the Building Official's approval of the special
inspector. In such a case a new special inspector'and/or firm would need to be proposed for approval. A failure
of the design and/or construction parties to perform in accordance with this agreement may result in a STOP
WORK notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Pacific fRi�da HomesSignature
m_
Contractor: Pacific Rmde Homes Signature
Travis McDan AIA
Arch./Eng:,,_wwwwW W„mrtteor Architects a . ,Signature
SpecialInsp.� Diane Glenn Signature
Construction Consultants of
Special Insp. Agency WashingtonLLC
ACCEI TE OR THE CITY PF EDMONDS BUILDING DEPT,
By Date:
Date
Dater
Date: 8/1/16
Date:
\\EDMSVR-DEPTFS\BuildingWandouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55
COE.doc7/21/2016
BaliIdiuNen me ;
The building 40parftent shall review any revisions and addenda. The City inspector will monitor the special
inspection functions forcompliance with the ggrventent and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
ROM b2feionast
The ami and/or engineer will coordinate their revision and addenda process in such a way as to ensure that
all required City approvals are obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency -
ENFORCEMENT
A failure of the special inspector or firm to pedorm in keeping with the requirements of RCW 64.55, the MC, the
approved plans, and this document, may void this agreement and the Building Official's approval of $0 special
inspector. In such a can a new special inspector and/or firm would need to be proposed for approval. A failure
of the design and/or construction parties to perform in accordance with this agreement may result in a STOP
WORK notice being posted on the project until nonconforming items have been resolved.
agree Ply ns ft i rent
with the terms and conditions I have read and to comply wr ?�
Owner.
ln�� Data
gy p p Si iratureData.
Contractor.il @ G
AwhIEng. Sipinstasre
Special Inarp.lai�-� H Sigarattare
Special Imp. Agency
ACCE �VZU
EDMONDS BUILDING DEPT.
By.,
Date: q-
%mumvix-DBPrFS WWWWandovle Information by CkuldinepocObnsbpeoiel inspection and testing rgea not RCW64.55