Loading...
20160921163745.pdfSPECIAL I SPECTION AND TESTING AGREEMENT Permit N: lob Z.- o 16 Project: WIU51(05- WM44..... Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES SDIV611 111SOCC601i Firin qVid S-Re-chil 111spectors: The Special Inspection firm of w.Construction Consultant�io� intonwill perform special inspection for the following types of work (separate forms ust be ubmitted if more than oil e firm is to be employed): a Window Water Penetration Resistance Test it Building Enclosure I m per RCW 64.55.050(l)(a) per RCW 64.55U0,4AFVI Cgi � Y fa E 1.1 W3 N D, S All individual inspectors to be employed oil this project must have substantial and verifiable training and experience in building enclosure design and construction, The qualified inspector shall be free from improper interference or influence relating tel the inspection . Verification that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications may be requested. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by tile City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. The signed letter will certify that the building enclosure has been inspected during the course of construction or rehabilitative construction and that it has been constructed or reconstructed in substantial compliance with the building enclosure design documents, as update pursuant to RCW 64.55.020. Any unresolved discrepancies must be detailed in the final report. Coqtrac!o,r* The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications inust be made available, at the jobsite for the use of the special inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be, in addition to the normal inspections performed by the City and the contractor is responsible for contactilig the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. \\EDMSVR-DEPTFS\Building\Handouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55 COE.doc7/21/2016 Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design I'ro•ofessional.w. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of RCW 64.55, the IBC, the approved plans, and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Pacific Ridge Homes _ Signature Contractor Pacific „ Ridge Homes �Signmure Travis McDanold, AIA Arch./Eng:_...................... atten argerArchi.......__,,_�en.��.......tects Signature Special Insp.­­­.. ... Diane Glenn Signature Construction Consultants of Special Insp. Agcney w µWashington LLC ACCEPTED, I�R THE CITY E EDMONDS BUILDING DEPT. F By' '�� Date: / � .Z ... ew_._.: _ _ ._�....._ __ .... Date Date: Date: ^8/1/16 Date:.. ... . -�. \\EDMSVR-DEPTFS\Building\Handouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55 COE.doc7/21/2016 w w building,depament shall review 011Y revisionsw: addenda. w s w q w wspecial inspaction functions for ow w the agreement and the approved w< CitY inspectore responsible for w w nvarious. ,, w. of w: w w to be r ,e,w i for work to procced. s I he arch" /or engineer will ineW their revision and addenda p in such a way as to ensure that all required !pity approvao are obtained, prior to work shown on the revisions being performed in the field. JU pmjeot owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCCAVJ4T A failure of the special inspector or firm to oven in keeping with the mquirvinents of RCW 64-55, the IBC, ft approved plans, and this document, may void this agreement and the Building Official's approval of the special inspector. In such a cow a now special inspector and. /or firm would need to be prcposed for approval, failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMT,PM I have read and agree to comply with the terms and conditions of this egr Owner: � � �.e �,F p „" .. Signature -� 1 Si ontaraaor. F Oren#. Date—L-IJ Date: AmhJEng• Signature Date: S special Ias . Doe: fT"ignattsrc p _ Special Insp. Agency AOOEFvrW R THE Cffy OF EDMONDS BUILDING DEPT, By: Date: f2 1=MSVR.D13 MSilditV1=dUMinfonngti m by ChwkWwpeW=t&pMd impaction end teabisspmwMRCW64.ss CO13.&02112016