20160921163745.pdfSPECIAL I SPECTION AND TESTING AGREEMENT
Permit N: lob Z.- o 16
Project: WIU51(05- WM44.....
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
SDIV611 111SOCC601i Firin qVid S-Re-chil 111spectors:
The Special Inspection firm of w.Construction Consultant�io�
intonwill perform special
inspection for the following types of work (separate forms ust be ubmitted if more than oil e firm is to be
employed):
a Window Water Penetration Resistance Test it Building Enclosure I
m
per RCW 64.55.050(l)(a) per RCW 64.55U0,4AFVI
Cgi � Y fa E 1.1 W3 N D, S
All individual inspectors to be employed oil this project must have substantial and verifiable training and
experience in building enclosure design and construction, The qualified inspector shall be free from improper
interference or influence relating tel the inspection . Verification that the inspector and the firm are qualified by
education and experience to perform the work and testing required by the project design and specifications may
be requested.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by tile City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. The signed letter will certify that the building enclosure has been inspected during the course of
construction or rehabilitative construction and that it has been constructed or reconstructed in substantial
compliance with the building enclosure design documents, as update pursuant to RCW 64.55.020. Any
unresolved discrepancies must be detailed in the final report.
Coqtrac!o,r*
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications inust be made available, at the jobsite for the use of the special
inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be, in addition to the normal inspections performed by the City
and the contractor is responsible for contactilig the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
\\EDMSVR-DEPTFS\Building\Handouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55
COE.doc7/21/2016
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design I'ro•ofessional.w.
The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that
all required City approvals are obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of RCW 64.55, the IBC,
the approved plans, and this document, may void this agreement and the Building Official's approval of the
special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A
failure of the design and/or construction parties to perform in accordance with this agreement may result in a
STOP WORK notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Pacific Ridge Homes _ Signature
Contractor Pacific „ Ridge Homes �Signmure
Travis McDanold, AIA
Arch./Eng:_...................... atten argerArchi.......__,,_�en.��.......tects Signature
Special Insp... ... Diane Glenn Signature
Construction Consultants of
Special Insp. Agcney w µWashington LLC
ACCEPTED, I�R THE CITY E EDMONDS BUILDING DEPT.
F
By'
'�� Date: / � .Z
... ew_._.: _ _ ._�....._ __ ....
Date
Date:
Date: ^8/1/16
Date:.. ... . -�.
\\EDMSVR-DEPTFS\Building\Handouts Information by Chuck\inspections\special inspection and testing agreement RCW64.55
COE.doc7/21/2016
w w
building,depament shall review 011Y revisionsw: addenda. w s w q w wspecial
inspaction functions for ow w the agreement and the approved w< CitY inspectore
responsible for w w nvarious. ,, w. of w: w w to be r ,e,w i for work to procced.
s
I he arch" /or engineer will ineW their revision and addenda p in such a way as to ensure that
all required !pity approvao are obtained, prior to work shown on the revisions being performed in the field.
JU pmjeot owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCCAVJ4T
A failure of the special inspector or firm to oven in keeping with the mquirvinents of RCW 64-55, the IBC,
ft approved plans, and this document, may void this agreement and the Building Official's approval of the
special inspector. In such a cow a now special inspector and. /or firm would need to be prcposed for approval,
failure of the design and/or construction parties to perform in accordance with this agreement may result in a
STOP WORK notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMT,PM
I have read and agree to comply with the terms and conditions of this egr
Owner: � � �.e �,F p „" .. Signature
-� 1
Si
ontaraaor. F
Oren#.
Date—L-IJ
Date:
AmhJEng• Signature Date:
S
special Ias . Doe:
fT"ignattsrc p _
Special Insp. Agency
AOOEFvrW R THE Cffy OF EDMONDS BUILDING DEPT,
By: Date:
f2
1=MSVR.D13 MSilditV1=dUMinfonngti m by ChwkWwpeW=t&pMd impaction end teabisspmwMRCW64.ss
CO13.&02112016