20161101141634.pdf,wwa tx���ir�a
SPECIAL INSPECTION AND "NESTING AGREEMENT
Penult 0: BLD2016-0146
. w Project: COE BAND SHELL - So1LS
Prior ifo issuance of a permit, this form must be completed in hs endre& and returned to the t ilq+ for
appnovai. The compteledform must have signatures of achnorl+IM miriot by all po am
DUTIES AND RESPONSIBILITIES
���� • � 1'�ti i��rtw �'� �,1�,.t�wwa wl IIT,�sp„wrc�lraHwr;�:
no Special Inspection firm of Coa. i � �+ � " i L_ �'C- _ _ will perform special
inspection for the following types (separate forms must be submitted if more than one firm ie to be
_of work
employed):
-Reinforced Concrete
Bolting in Concrete
Prestressed Concrete
_Shotcrete
_Structural Masonry
_Structural Steal/Welding
High Stroagth Bolting
—Spray applied Fireproofing
_Smoke Control Systems
Lateral Wood
Structural Observation by design professional
_&Soils
Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must he submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections perforned. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
C:IU=s%ThonWi MlMMMW k 11dMW Fi10TWt1ut0u11ookWR1D6Q3WT form Band SMI
Soihr.&D7/641016
+Gets cttMrr
Tito contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildinle I)enartmcnt:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
l7esiIt forofessionuls:
JU architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
QUM
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
Plans and this documeirt, may void this agreement and the .Building Official's approval of the special inspector.
In such a caw a new specialinspector or firm would needto be proposed for approval. A failure of the
design and/or constrilotion parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
1 have read and agree to comply with the terms and conditions of this agreement.
C i-ry OF M WvO
•._.i'��N _.�... 'tta�c � �tDate /t lr
Owner 22 Y .a -Signature t o �,.'" _._ _..... .
Contractor:.
Special Insp. QoSel��r '� Signature
.......��........
Special Insp. Agency_Co aline G l•: o Sc-r C n,c t= S
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT.
By .,,,.._.. ...... Date
Date: J Lc 911 t(o
-„. Date: _1_° �� • ��'
Date: v `To
c:%ummo n"u4flAppD"U.mw\mic somWindowz%Temporary fitemet Fil01WAftnL0Udook\DRlD6Q3Q%SI ram Band Shell
Soili.doO/0016