Loading...
20161101141634.pdf,wwa tx���ir�a SPECIAL INSPECTION AND "NESTING AGREEMENT Penult 0: BLD2016-0146 . w Project: COE BAND SHELL - So1LS Prior ifo issuance of a permit, this form must be completed in hs endre& and returned to the t ilq+ for appnovai. The compteledform must have signatures of achnorl+IM miriot by all po am DUTIES AND RESPONSIBILITIES ���� • � 1'�ti i��rtw �'� �,1�,.t�wwa wl IIT,�sp„wrc�lraHwr;�: no Special Inspection firm of Coa. i � �+ � " i L_ �'C- _ _ will perform special inspection for the following types (separate forms must be submitted if more than one firm ie to be _of work employed): -Reinforced Concrete Bolting in Concrete Prestressed Concrete _Shotcrete _Structural Masonry _Structural Steal/Welding High Stroagth Bolting —Spray applied Fireproofing _Smoke Control Systems Lateral Wood Structural Observation by design professional _&Soils Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must he submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections perforned. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. C:IU=s%ThonWi MlMMMW k 11dMW Fi10TWt1ut0u11ookWR1D6Q3WT form Band SMI Soihr.&D7/641016 +Gets cttMrr Tito contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildinle I)enartmcnt: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. l7esiIt forofessionuls: JU architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. QUM The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved Plans and this documeirt, may void this agreement and the .Building Official's approval of the special inspector. In such a caw a new specialinspector or firm would needto be proposed for approval. A failure of the design and/or constrilotion parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS 1 have read and agree to comply with the terms and conditions of this agreement. C i-ry OF M WvO •._.i'��N _.�... 'tta�c � �tDate /t lr Owner 22 Y .a -Signature t o �,.'" _._ _..... . Contractor:. Special Insp. QoSel��r '� Signature .......��........ Special Insp. Agency_Co aline G l•: o Sc-r C n,c t= S ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. By .,,,.._.. ...... Date Date: J Lc 911 t(o -„. Date: _1_° �� • ��' Date: v `To c:%ummo n"u4flAppD"U.mw\mic somWindowz%Temporary fitemet Fil01WAftnL0Udook\DRlD6Q3Q%SI ram Band Shell Soili.doO/0016