ENGINEERING DEVELOPMENT CHECKLIST
ENGINEERING DIVISION
PROPERTY NAME In raham SFR
4, r. 9
PROJECT ADDRESS raemet -7 ; "7
TYPE OF CONSTRUCTION SFR
DEVELOPER/APPLICANT Thomas Thompson
PRE-APP DATE 10/9/082,3pm.
ENGINEERING REPRESENTATIVE Ed Sibrel
The following checklist is a reference to assist in preparing engineering drawings for a more complete
building permit application. Additional information or review comments may be precipitated during the
review of the application.
City of Edmonds Standard Details and Edmonds Community Development Code (ECDC) are
available online at www.ci.edmonds.wa.us
[❑] Traffic Impact Analysis
# Items # 1 and #7 required to be filled out on TI Analysis.
[❑] TOPGRAPHIC DRAWING
Existing and proposed contours (2' or 5' intervals)
Grading plan and quantities of cut and fill. Include quantities for building foundation and provide
bottom of footing elevations.
[❑] STORM DRAINAGE
Detention system
✓ Include control structure detail
✓ Manholes- flat top not concentric
✓ Ladders- polypropylene not galvanized
✓ System profile
Design by licensed engineer (>5000sf impervious area). Please contact Jerry Shuster, Storm
Water Program Manager at 425-771-0220 with specific questions on design requirements.
Storm drainage report to be submitted.
SAENGRTRIVATE DEVELOMENT PROJECT&REVIEMSFR12008 SFRIBraemer Dr - 7402 PreApp.docm Page 1 of 3
Revised 04 October 06
• Structural drawings and calculations for concrete vaults (Will be sent out for peer review. Cost
shall be pass through)
• Footing drains, if required per the Building Code or by the Geotech shall connect to outfall of
detention system.
• Provide RIM and invert elevations for all existing and proposed storm structures.
• Storm Development Charge — calculated at $428 per ESR
[❑] SITE ACCESS
• Driveway/Access Width
✓ 12' drive aisle for SFR
• Driveway/access slope
✓ 14% max slope, waiver up to 20% per ECDC
✓ 6% landing area for the first 20' .
✓ NOTE: proposed driveway access is at 20%. Although this steepness is technically allowed
per code with a waiver, you are highly encouraged to design a shallower driveway run so that
when the inevitable construction problems occur, there is still room for field adjustment of
slope. In no case will a driveway exceeding 20% in slope be allowed to be built.
[❑] FRONTAGE IMPROVEMENTS
❑ Existing
Remove and replace existing sidewalk, curb & gutter per City standards as required to
complete construction and/or per City inspector.
❑ Curb and Gutter / Curb Cut
• Standard Curb and Gutter with curb cut required
• Face of curb shall be 35' from center of cul-de-sac
Roadway widening
• Cul-de-sac abutting frontage shall be paved to C/G.
• Provide additional storm improvements as required
❑ Storm Improvements
• CB to be installed in ROW where detention system ties in
• Storm line to connect new CB to existing City facilities
[❑] ELECTRICAL POWER SOURCE
• Power service shall be underground
[❑] RETAINING WALLS/MODULAR BLOCK WALLS
• Follow Handout B-62
• Provide drawings and calculations (If sent out for peer review, cost shall be pass through).
[❑] WATER SERVICE
EI City of Edmonds Customer
• Water Connection Fee will be required.
• Domestic
✓ Backside of water meter to be located at property line.
SAENGRIPRIVATE DEVELOMENT PROJECTSIREVIEMSFR12008 SFRIBraemer Dr - 7402 PreApp.docm Page 2 of 3
Revised 10107
• Irrigation
✓ Show location of backflow assembly on private property immediately after the meter.
✓ Irrigation Sprinkler Permit to be obtained from Public Works. Contact Linda McMurphy,
Cross Connection Control Specialist at 425-771-0235.
[❑] SANITARY SEWER
❑ City of Edmonds Customer
• Sewer Connection Fee will be required.
• Lateral
✓ 6" minimum
• Cleanouts: required at property line, at edge of easement and at the end of the run. Locking CI
lamphole covers keyed with %" hex bolts shall be installed at property/easement line and
when located in hard surfaces. Cleanouts shall be placed a maximum of 100' apart when the
lateral length exceeds 100 feet.
[❑] RECYCLE/TRASH ENCLOSURE (Contact Steve Fisher, Recycling Coordinator at
425-771-0235)
• Refer to Handout E-37.
• Gate shall be full swing, concrete pad required.
• Enclosure to be accessible by garbage hauler.
• NO UTILITIES (I.E. GAS METERS, POWER, ETC) SHALL BE PLACED WITHIN THE
ENCLOSURE
[❑] EROSION CONTROL
• ESC requirements shall be placed on the engineering drawings.
• ESC standard details shall be placed on drawing.
[❑] TRAFFIC CONTROL PLAN and HAUL ROUTE PLAN
[❑] RIGHT-OF-WAY CONSTRUCTION PERMIT
• A right-of-way construction permit is required for all work within the City right-of-way.
• Contractor is required to have an active state contractors license as well as City business license.
[❑] OTHER3�Uou-�-c`
❑ Easements
NOTES: �02, 7rz..r•rc i�`�c-�- /�.cJ�q�y�rS.
Storm, Water and Sewer maps are provided as a graphical representation of existing utilities. Actual
utility locations are to be verified by the owner/applicant.
SAENGWRIVATE DEVELOMENT PROJECMREVIEMSM2008 SMBraemer Dr - 7402 PreApp.docm Page 3 of 3