Loading...
20161115083323.pdfARCHITECTURE FVAWI SPACE PLANNING architectural werks, inc. INTERIOR DESIGN November 10, 2016 City of Edmonds Building Plans Examiner Development Services Department 1215th Avenue N Edmonds, WA 98020 RE: Project: The Everett Clinic Tenant Improvement — Phase 1 Job Address: 2140172"d Ave. W Edmonds, WA 98026 Plan Review No: BLDG20161174 CBTY (V f-.6M0 Since the initial plan review, the scope of work has been revised for this project. We are submitting revised drawings for review. See below for a description of the changes on each sheet. Description, of Revision #1 dated 1112116 1. Sheet G-000 — Sheet Index Edit AWI: We have revised the sheet name for sheets Aid-1011 Aid-1310 A-102, and A-131. We have also added sheet A-602. 2. Sheet G-101— Layout Change, and occupant load update AM: We changed the layout in the clouded area and added room #373 MRI Dressing to the scope of work. The occupant load was updated to correspond to the new layout. 3. Sheet C-101— No changes 4. Sheet A-001— Changes to legends and notes on Sheet AM: Demolition key notes have been edited. The light fixture schedule has been removed, and legends and notes have been re -ordered on the page. 5. Sheet AD-101— Changes to scope of work areas AWI: New work was eliminated in rooms #A326, A331, A333 and 307. The extent of new work has changed for room #357, and #359 will remain a waiting area. Work in rooms #352 and 373 was added to scope. 6. Sheet AD-131— Changes to scope of work areas AWI: New work was eliminated in rooms A331, A333 and 307. The extent of new work has changed for room #357, and #359 will remain a waiting area. Work in 11416 98`' Avenue NE — Suite 200, Kirkland, WA 98033 P: 425.823.2244 F: 425.898.4722 W: www.awerks.com The Everett Clinic - Edmonds November 10, 2016 Page 2 rooms #352 and 373 was added to scope. 7. Sheet A-101- Changes to scope of work areas AWI: Areas of work have been revised to reflect the revised scope of work. 8. Sheet A-102 - Changes to scope of work areas AWI: New work was eliminated in rooms #A326, A331, A333 and 307. The extent of new work has changed for room #357, and #359 will remain a waiting area. Work in rooms #350, 352 and 373 was added to scope. 9. Sheet A-131- Changes to scope of work areas AWI: New work was eliminated in rooms #A331, A333 and 307. The extent of new work has changed for room #357, and #359 will remain a waiting area. Work in rooms #350, 352 and 373 was added to scope. 0. Sheet -33 . - Removed, and added details caused by scope of work changes. AWI: Removal of detail numbers 2, 16, and 17. Added Details number 3, and 11. 11. Sheet A-401- Removed, and added details caused by scope of work changes, AWI: Removal of details number 2, 8, 9, 10, 6. Added new Details number 9 and 13. 12. Sheet A-402 - Removed, and added interior elevations caused by scope of work changes. AWI: Removed elevation numbers 1,3, 6, 8, and 9. Re -ordered elevations number 2 to 1, 4 to 3, and 5 to 4. Added interior elevations: #2 PAR #352, #5 MR/ DRESS # 373, #6 LAB #350. 13. Sheet A-601- Schedules and remarks updated, changed or removed. AWI: In the door schedule, hardware group designations were changed, Doors A326A, A330A, A332A, A333A, A3338, A335A, and 395A were removed from the scope of work. While doors A302A, A303A, A317A, A323A, 350A, 352A, 355A, 358A, 357A, 3578, 374A, and 373A were added to the scope of work. Frame type 2 was removed, a keyed remark was removed, and hardware group numbers were updated. Room finishes and keyed remarks were updated per new scope of work areas. 14. Sheet A-602 - New sheet added for door hardware schedules The Everett Clinic - Edmonds November 10, 2016 Page 3 Please feel free to contact us with any specific questions regarding the drawing revisions. Thank you for your help and assistance with this project review. Sincerely, Architectural Werks, Inc. qw� / r�4' Janet Monda, AIA