Loading...
20161118164611.pdfARCHITECTURE MAW SPACE PLANNING architectural werks, inc. INTERIOR DESIGN November 16, 2016 City of Edmonds Building Plans Examiner R °A''uy Y„Lz Development Services Department NOV 1215th Avenue N 1)1 Edmonds, WA 98020 b(LIWOM36 COY OF is ° ii RE: Project: Swedish Radia Tenant Improvement Job Address: 21700 Highway 99 Edmonds, WA 98026 Plan Review No: BLDG2016 0669 Since the initial plan review, the scope of work has been revised for this project. We are submitting revised drawings, as well as responses from the plan review comments, for review. See below for a description of the changes on each sheet. Description of Permit ev sio Revilign a ed 11 11 1 1. Sheet A-0.1—Scope of work, Sheet index, and Project Team Permit Revision #2: Sheets A7.1 and A8.1 were added to the sheet index. Owner Revision #3: We have revised the scope of work to a smaller footprint per our client's request. Sheets A4.0 and A4.1 were removed from the scope of work, and the client selected a different contractor as shown under The Project Team on the Cover Sheet, A0.1. 2. Sheet A0.2 — Scope of Work Change and Occupant Load Update Permit Revision #2: Water fountain was added to Reception Area, 101. Owner Revision #3: Scope of work has changed to only include room 119 and 124. Space occupancy loads were updated to reflect scope of work changes. 3. Sheet AM —Owner Revision #3: Revised area of work. 4. Sheet A2.0 — Changes to Demo Notes and Scope of Work Permit Revision #2: Added note to prepare area for new drinking fountain. Owner Revision #3: Demolition key notes have been edited, and area of work has been reduced. 5. Sheet A2.1— Changes to Scope of Work Permit Revision #2: Water fountain added to room 101, Elevation bubble in room 124 has been clarified, and elements along the north interior wall of room 119 will be simple office desks procured and placed by the owner. Owner Revision #3: Scope of work has changed to only include room 119, 124. 11416 98°i Avenue NE —Suite 200, Kirkland, WA 98033 P: 425.823.2244 F: 425.898.4722 W: www.awerks.com Swedish Radia - Edmonds November 16, 2016 Page 2 6. Sheet A3.0 — Changes to Scope of Work Owner Revision #3: Demolition Key notes and areas of work are updated to show new scope of work. 7. Sheet AM — Changes to Scope of Work and Lighting Controls Permit Revision #2: Light reduction controls, occupancy sensors, means of egress lighting, and exit signs are now indicated on plan. Owner Revision #3: Areas of work have been revised, and Reflected ceiling notes, legend and schedule have been updated. 8. Sheet A-4.0 — Owner Revision #3: Sheet removed from scope of work 9. Sheet A4.1— Owner Revision #3: Sheet removed from scope of work 10. Sheet A6.1— Details Updated with Scope of Work Changes Owner Revision #3: Removal of detail numbers 3, 17, 18, 19, 20. Added Details number 4, and 9. 11. Sheet A7.1— Interior Elevations Updated with Scope of Work Changes Permit Revision #2: Addition of elevation 4 Owner Revision #3: Removal of elevations 1 and 2. 12. Sheet A8.1— Details Updated with Scope of Work Changes Owner Revision #3: Removal of detail numbers 3 and 5. 13. Sheet A9.1— Schedules and remarks updated, changed or removed. Owner Revision #3: In the door schedule, one conference room door was removed, and one scheduling room door was added to the scope of work. Frame type 1 was replaced with a standard swing door type, and hardware group descriptions were updated. Exterior window schedule and exterior window types were removed due to new scope of work. Room finishes were updated per new scope of work areas. Please feel free to contact us with any specific questions regarding the drawing revisions. Thank you for your help and assistance with this project review. Sincerely, Ar h' ectural Werks, Inc. Fran in Ng, AIA Attachments: 1612SwedishRadia PermitResubmittal 2016-11-17 CC: Stephanie Aplin, Radia; Josh McGaffey, Ferris Turney; Janet Monda, AWI -via email