Loading...
20161128093336.pdfVI: CARLETTI ARCHITECTS, ctkiee, interior rll(nign & a n n n i? November 21, 2016 Chuck Miller, Plans Examiner City of Edmonds 121 5th Avenue North Edmonds, WA 98020 RE: Plan Check: BLD2016-1264 Project Address: 8119 240t"Street SW, Suite A Project. Boyer Electric TI Scope: Infill existing exterior roll -up door - add non -bearing interior walls/doors to create conference room and individual office spaces B/S-2 oce-upaXicy groups V-B construction — existing NFPA- 13 sprinkler system — mechanical included Mr. Miller: Thanks for speaking with me on the phone in regards to the above permit number. Please find below our itemized responses to your correction letter dated October 26, 2016 General review note: 1. The design work :For proposed alterations to an existing structure that include a change in the use of the space, and the associated determination of the occupant load and means of egress, iri a structure off realer ttian r6tir tbouq'sind S(,It:m,rc feet of sim is ray (pured tot)e perfi)rmed ley licensed desigtqj 11 c )f 11-ic e Rviscd Code per C'l)apt 1, 18,08,410 ( of Washirigtoiii (14"W), Resubmitted consiruction dout"rtents sbotild represetit/resolve the concerns -of the following plan review comments Response: Plans have been prepared and stamped by Carletti Architects, P.S. On sheet A- I and/or A-2: 2. Ileprcwnt on the plans the con fitguralkni of t1le `rile tails o f egresscoi'1'11�*Tlents 116 lizil Ig the noted 'existing doorwiiy to ex ttli, 0 C SinCV,,I Meaar sofegresstar ,,in exit carmoi. bc, through storage spaces (warehouses), a hallway, or corridor, rmr typically L11j] iXC!d Its provide a dedicated path to the exterior. Among the concerns are the dimensions of the 1 16 E Fir Street, Suite A *i-ounf Vernon, WA C)8273 (.16 0) 4 2 d - 03 '!,1 FLAX f 3 6 :) ) 424 5 7 2 6 Movember 21, 2016 Boyer EleCtilicy II BLD2016-16 Correction response letter anticipated corridor (height/width/length), if there are other opelihigs into the corridor, if the corridor also serves as the nieaus of egress for the occupants of tfic adjacent space, and that all of the occupants served byr the corridor have unrestricted access to it. Response, See revisedfloor plan illustrating exit corridor, required door fforn adjacent teriant space and required door clesirances. ,Vire S'h,eetA-20 3. Indicate on the plans the required minimani ventilation rates per Inteniational Mechanical Code (TIVIC)'Fable 40331A for any proposed system(s) serving the following areas: 0 Storage/warehouse -- ininimum 418 UM outside air o Conference Room — mininium 55 CFM outside air a Remaining office areas (combined) --m-inimurn 129 COA outside air The proposal to use as 300 CFN/1, fan connected to the existing roof duct may necessitate additional.nicasures to provide the re minirnurn ventilation rates for each'of the spaces — see also plan review coniment 411 Response: See revised. floor plan illustrating notesabout required ventilation, See,VzeelA-2.0 4. Indicate on the phins any built-in furnishings, 'Shelving, or racks that may be installed in any of the spaces. Shelving/racks that exceed 6 feet in height must be seismically anchored. Otherwise,note that ffirnishings/furniture is not to be 'Exed-in-place', Response. See revised floor plan notes in regards to shelving and racks which have been added, .Yee Sh eet A-Z 0 5, Indicate on the plans the required accessible entrance per International Existing Building - Code (IEB(.,) 410.6/403.1 International Building Code (113C) 1103,221/1105 and the applicable sections of ICC Al 17.1-2009 Chapter 4. 'The total cost of the atterations for accessibility is not required to eweed 20 percent of the total cost of the project. Respoixsee The existing entrance into the building is from a set of stairs. We are not altering the path of entrance in the building. the costs to provide a ranip areboth greater than 20% ofthe costs of the alterations.proposed and would be teclinically difficult to achieve. We are proposing to leave the existing elevated eritranct, as it currently exists hito tti,ellacility which previously had office and warehouse tenant space;. 6. Indicate on the plans the required drinking fountain(s)installation to meet both the accessible and standing spout otitlet height requirements , of IC' 4103/403 , 1 /410.6 IBC 2902.5.1/1109.5. 1 and ICC Al, 17.1-2009 section. 602.4. , I'lle total. cost of the alterations for accessibility is meat required to exceed 20 percent of the total cost of the project. November 21, 2016 Boyer Eleciric T1, RLT).2016-126 Correction response letter Response: See revised floor plan illustrating the drinking fountain and required ino-unting heights and clearances as noted. See Sheets A-0.0fir nol(,.�s and clearances and .Sheet A-Z 0fi)r location. 7. fndicate on.,the plans the required fully accessible toilet facilities per TEBC 410.7/403,1/410.6 IBC 2902.3/1109.2 and [CC Al 17.1-2009 section 603,1 , The existing toilet facilities may be altered to create an accessible ftunily or assisted -rase toilet room, reducing the required number of toilet facilities by one, per lE8C 410.8.10. The total cost of the, alterations f'or accessibility is not required to exceed 20 percent of the total cost of the project. Response: See revised floor plan illustrating a barrier free restroom which was add ' ed, As we discussed the occupant load is lotul enougli we provide (2) restrooms alld both are uni-sex. The barrier Eree restroom takes the place of the two former none barrier free restrooms and we. still maintain access to the other commou restroom, See Sheets A-0.0./or notes � nd clearances and Sheel A-2.0fior locution. 8. Indicate on the plans the required installation of door hardware that does not necessit ' ae. t till -it: pinching or grasping, or twisting of the �vwist to operate for each ofthe doors per IBC- 10 10. 1 ,9, 1 and ICC At 17.1-2009 section 404.2.6. Response. See revised floor plan. with notes added in regards to door handles and operation, See Sheet A-22. Ofior notes added. , 9. Indicate on the plans that, with tyre maneuvering clearance proposed on the `push' side of the door, a closer may not be installed on the door at the north end of the hallway to the warehouseper fIX" 1103.2.2 andlCC Al 17,1-2009 section. 4014.2.3.2. Response: See revised floor plan illu ' strating notes added for clearances at doors, Stw,Vlteet A-2. O.'fi)r door locations and note v added. 10. Clarify on the plan,,, the proposed'tocation of the door Croon the 'Receptionr area to the warebtouse. It does not appear to provide the required 18 inches minini U131 Maneuvering clearance ad ' jacent. to the latch from the"pull' side per IBC 1103,2.2 and ICC Al 17. 1 - 2009 section 404.232. Response: Door and hallway added which illustrate the required 18" clearance. See Sheet A -2. 0.1or location. 11. On sheet A-1 --- Note 47 — appears to indicate that tlae project contains a serrii-heated space. Washington State Energ 0 Enemy C ode (WSEC) (302. 1. 1, .1 requires interi r walls/ceilings separating serni-heated spaces from other conditioned spaces (the spaces indicated as having electric wall heaters on sheet A-3) in the same bdilding to COrriply with exterior therinal, envelope requirernents and be -specified as applicable on the plwis, J!, November 21, 2016 Boyer Electric T I RLD201 6- 126 Correction response letter Response: See revised floor, plan illustrating insulation added at the walls and ceiling over the' office area. We are using presedptive codes. We also added notes requinng shop drawings to be submitted to the, fire marshal for fire sprinkler niodifications to drop heads into the ceiling area over the new offices. See Sheets A-0.0fi)r holes Sheel A-2.Ofir notes calling out insufalion values. I trust that this is satisfactory for your to cornplete your review. If you require additional. i ii1brinoi,� �,p please don't besitate to email and or .all me. R f's, Ce: ,Vac Bayer, Boyer, Boyer Electric Y-Wachments: Revised plans A-0.0-Cover Sheet A-2.0- Dernolition Plan/Proposed Floor Plan A-2. 1 -Reflected ceiling plan and framing