Loading...
20161202112953.pdfTo Mr. Chuck Miller Plan Review Examiner Building Division City of Edmonds November 28, 2016 Dear Mr. Miller, OF", 0 A I!()I�" Thanks for the review comments dated October 12 for Chinese Grace Evangelical Free Church proposal. In the following I have prepared some clarification to your review notes number 3, 4, 12, 15, 21 and 22. Review note 3 — We shall use slotted roof truss clips to allow for the deflection of the floor or roof trusses above. Review note 4 — We have resubmitted Washington State Energy Code (WSEC) Compliance Forms. The attachment includes the followings: Lighting Summary, Interior Lighting — Space -By -Space Method, and Lighting, Motor, and Electrical Permit Checklist. Lighting Plan (Page 7, 8 & 9) Lighting Fixture Schedule (Page 6). Review note 12 — We have added Page 4 to show the construction and electrical wiring of the 7 feet high architectural feature wall along the north wall of Room 109. Review note 15 - We have Indicated that Range and Type II hood will be installed in Room 110 for the purpose of boiling, steaming, and warming precooked food, which shown in Page 2 & 5. Review note 21—The occupant load of 2 on the proposed use of the space to the north of the Meeting Room is based on occupant density 10/1000 sq ft multiply the area of 221 sq ft. In reality, this area is primarily served as pathway to offices and the existing lunch area. Review Note 22 — We shall use an Exit Door in the Meeting Room in a means of egress to Hallway, which shown in Page 3. I hope these editing and clarification will meet your approval. Thanks you. Pastor David Lo Simon Lui (Church Board) V✓ r