Loading...
20161208155246.pdfCITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS December 8, 2016 ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DRC20160039 8029 238" St SW 46 unit mixed used building Comments - There were no plans submitted showing any preliminary utilities or stormwater system so please use the wealth of information available on our website to understand the requirements for this construction. The complete Edmonds Community Development Code (ECDC) is available on the city website. You will need to review the 2017 Stormwater Code (ECDC 18.30), Edmonds Stormwater Addendum, and the 2014 Stormwater Management Manual for Western Washington for the stormwater mitigation requirements for the development. Informational handouts and standard details are available for utility, frontage and other requirements. To address the questions pertaining to the Engineering Division requirements: There will be frontage improvements required. Curb and 5 foot sidewalk is required for that section of 238tn A 30' access to the site is required. See standard details on our website for more specific information. Engineering Division will require a right of way permit and a side sewer permit in addition to the overall building permit. Utility Connection fees will be increasing as of January 1 St. You may be able to get the updated fee schedule from the permit coordinator. If not, please email me and I will gather that information and email back to you. Please let me know if you have any additional questions for Engineering. Thank you! JoAnne Zulauf Joann zula[;" d� oncl v gc v 425-771-0220