Loading...
2017-0041 Madrona Non-struc Beck #2.pdfBeck & Associates, PLLC Structural Engincering & Codc Consulting June 30, 2017 Leif Bjorback Building Official City of Edmonds 121 51h Avenue North Edmonds, WA 98020-3145 Subject: Madrona K-8 (Non-structural — 2nd Review) Permit: BLD2017-0041 Per your request, Beck & Associates has completed a 2nd non-structural review of the drawings and documents for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Legend: Faded text initial comment adequately addressed — no further action required Plain text initial comment (these remain where an additional comment is made) Blue text additional comment in response to the resubmittal NON-STRUCTURAL General 1) Snohomish Health District (SHD) approval is required for all areas used for food handling and preparation. It is the responsibility of the applicant to coordinate directly with SHID to achieve this approval. This comment is for your use only and no response is required. 2) Provide complete design and detailing of the bleachers to demonstrate compliance with the code. If this will be submitted as a deferred submittal to the Building Department (non- structural and structural), the plans should be updated to indicate so. 3) Please clarify the meanings of the abbreviations used for the various classrooms (LD, DHH, M, 1, SM, K, etc.). Energy Code (2012 WSEQ 4) Reference Sheet G-004— Building Code Review a) Reference the Building Envelope Requirements Section. Code references need to be corrected. 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 2 of 11 5) On the plans, specify the requirements for air barrier construction as required by the WSEC. C402.5.1.1 6) Please clarify the use of Door 120.2. It appears that this door will be used as an entrance and exit to the building. If so, it is required to be provided with a vestibule. C402.5.7 7) In response to this item, the architect references "attached WSEC "LTG-CHK"" for applicable 11 additional efficiency package options". However, this was not included in the most recent submittal. Please submit this for our review. The initially submitted WSEC Lighting Summary (LTG - SUM) utilized the 'standard' calculation and not the "Additional Energy Efficiency Package Option." It appears that the following Additional Efficiency Package Options will be utilized on this project: reduced lighting power in accordance with C406.3 AND enhanced lighting controls in accordance with C406.4. Please confirm that this is the case or identify the other options that will be used. Provide an analysis within the drawing set and revise the drawings to demonstrate compliance with the WSEC for Lighting Systems. Analyses should address: a) Lighting controls (occupancy sensors, time switch controls, daylight responsive controls, exterior lighting controls) C405 b) Interior lighting power allowance (provide a copy of compliance forms within the drawing set) C405.4 c) Exterior lighting power allowance (provide a copy of compliance forms within the drawing set) C405.2.7 d) Additional efficiency package options C406 e) System Commissioning C408 8) Reference sheet G-031. Table C402.4 a) Specify required exterior door U-values (U=0.37, max). Use and Occupancy 9) On the plans, identify the Occupancy Classification for the office area (13 Occupancy). Reference the Commentary to the IBC which corroborates the designation of educational office spaces as a B Occupancy. 305 a) Revise the allowable building height& area calculations accordingly. Chapter 5 b) Provide and demonstrate how this mixed occupancy will be achieved (nonseparated or separated occupancies). 508 10) Assembly spaces (Gym, Commons Area/Dining) are considered as separate occupancies if they are used for school purposes (ancillary and supportive of the educational operation of the building). 305.1.1 However, they are required to be considered as separate occupancies where they are not supportive of the educational occupancies. The Commentary states that "often these school facilities are used for other functions such as a meeting of a community services organization or a community crafts fair. These types of uses fall outside of the intent of this section, and therefore such assembly spaces would need to be classified as a Group A." It is unclear form the plans (G-102) if these assembly areas will be used for functions other than for the operation of the school (such as for community functions). a) Please clarify the extent of use of the 'after hours' assembly areas. 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 3 of 11 b) If the spaces will be used for other than educational purposes directly supporting the school function, they are required to be considered to be A occupancies. 303, 305 i) Revise the allowable building height & area calculations accordingly. Chapter 5 ii) Provide and demonstrate how required rated separations will be achieved (assuming separated use). Table 508.4 11) On the plans, identify the Use (Incidental Use) or Occupancy Classification of the Mechanical Level, depending on the conditions. a) If the Mechanical Level will be considered to be a separate occupancy, revise the building area calculations to consider the proposed occupancy on the 2nd level (height/stories, area). Does the use most closely resemble a U occupancy (buildings and other structures of an accessory character and miscellaneous structures not classified in any specific occupancy)? Chapter 3 b) Demonstrate how required separations (mixed occupancy or incidental use), if applicable, will be achieved. Table 508.4; Table 509 12) Review the Incidental Use Table, Table 509, to determine if any of the incidental uses are applicable to this project. Identify on the plans how the required separations will be achieved (labs and vocational shops within Group E occupancies, laundry rooms over 100 square feet, stationary storage battery systems). T509 Fi re -Resistive- Rated Construction 13) In response to the item, the architect specified assemblies and provided specifications for construction within the drawing set. Thank you. The following are comments related to what was submitted. Reference sheets A-601 and A-602. 0 General Comments relative to ALL of the assemblies and specifications. • In all cases, where a listed, tested assembly is designated that provides multiple options, the drawings need to identify the specific option(s) used along with the specific requirements of each of those options. • Where an assembly was listed, tested with proprietary gypsum panels, the specific proprietary panels to be used are required to be designated on the drawings. • All required fasteners and fastener spacing are required to be specified for each assembly and for each layer of gypsum based on the assembly option(s) chosen. o Generally, all aspects of assemblies are required to be specified within the drawings. Assemblies are listed and tested under specific construction conditions, all of which need to be met. This is why providing an exact copy of each FRR assembly within the drawing set and identifying the specific options used, can be an effective means to communicate construction requirements. 0 Reference sheets A-601. AER 09038 is specified to be used as a ceiling assembly (3 different options used in the drawings). However, testing is only for rating as a wall assembly. While horizontal assemblies can be used in vertical applications. Vertical assemblies are not permitted to be used in horizontal applications. Identify an 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 4 of 11 alternate assembly and provide specifications/detailing for that assembly that is designated to be used in a horizontal (ceiling) application. 0 Reference assembly notes for UL-U415 on sheet A-601. o Identify the specific options used for the assembly so we are able to review for compliance and so the assembly can be properly specified for construction. o Type TH gyp board is specified. It is unclear what 'TH' is. Additionally, this assembly relies on proprietary gyp board products for different options. The specific proprietary gyp board products to be used in this assembly are required to be identified/specified. o All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum based for the assembly option(s) chosen. 0 Reference assembly notes for UL-U301 on sheet A-601. o Identify the specific options used for the assembly so we are able to review for compliance and so the assembly can be properly specified for construction. o This assembly relies on proprietary gyp board products for different options. The specific proprietary gyp board products to be used in this assembly are required to be identified/specified. o All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum based for the assembly option(s) chosen. 0 Reference assembly notes for UL-U305 on sheet A-601. o Identify the specific options used for the assembly so we are able to review for compliance and so the assembly can be properly specified for construction. • This assembly relies on proprietary gyp board products for different options. The specific proprietary gyp board products to be used in this assembly are required to be identified/specified. • All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum based for the assembly option(s) chosen. 0 Reference assembly notes for UL-U356 on sheet A-601. o Identify the specific options used for the assembly so we are able to review for compliance and so the assembly can be properly specified for construction. • This assembly relies on proprietary gyp board products for different options. The specific proprietary gyp board products to be used in this assembly are required to be identified/specified. • All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum based for the assembly option(s) chosen. 0 Reference assembly notes for GA WP-3820 on sheet A-601. 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 5 of 11 • All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum. • All other requirements, such as staggering of joints, etc. are required to be specified. Fire -Resistive Rated (FRR) Assemblies a) Reference assembly 1RO1 on A-601. Identify the listed, tested assembly used as the basis to provide the required 1-hour construction. All Fire -Resistive -Rated assemblies are required to be identified by the listing designation. This appears to have been done for the FRR assemblies currently on the plans. b) Provide complete detailing and specitications tor the construction ot each listed, tested FRR assembly. A simple and effective way to do this is to provide an exact copy of each FRR assembly within the drawing set. c) Provide detailing to demonstrate that continuity of the FRR assemblies will be provided -.- -1 ',rmir-'- -' - - -- - — ` d) Provide complete detailing for the construction of the fire wall at the following locations and demonstrate compliance with horizontal and vertical continuity/termination requirements. 706 i) Reference sheet A-14113. "1' HR Fire Treated Sheathing" is specified. I am not aware of a 1-hour fire treated sheathing. It appears the note should simply specify "fire - retardant -treated roof sheathing." This is what is required by 706.6, 4.3. Update the plans accordingly. Head of wall to roof 706.6 ii) Fire wall to exterior wall 706.5.1 iii) Reference comments (1) & (2) below. (1) Reference section 706.5.2, exception #3. 1 appears that a concealed space occurs at the eave condition where the fire wall intersects grid A. If so, the fire wall is required to extend through the concealed space to the outer edges of the projecting element. Provide detailing for this condition. If there is no concealed space, provide detailing to demonstrate that there is no concealed space at this location. (2) Reference the note on sheet A-14113, located near grids 3.2 & D. The note states 11 roof assembly — as per IBC 706.6.1 stepped building." It doesn't appear that the required 1-hour assembly is identified anywhere in the drawings. Also reference A3/A-332. Specify the required assembly and reference it from the plans for construction. Continuity of fire wall at horizontal projecting elements (eaves, canopies, etc.) 706.5.2 iv) This item remains to be addressed. Specify requirements for membrane penetrations in fire walls. 706.9, 714 14) The plans show that the new school will be built adjacent to the existing school during construction. 0 Reference sheet G-042, AD-101, and AD-102 Temporary Facilities Plans. The plans specify parapets. We are in agreement that they are required for the height of 30- inches as shown. 705.11.1 16425 SE 66 1h Street, Bellevue, WA 98006 # beckpllc@msn.com * PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 6 of 11 • Provide an analysis for the structural design of the parapet and connections. Update the detail as determined by the analysis. • Reference assembly notes for UL-U305 on sheet A-102. Identify the specific options used for the assembly so we are able to review for compliance and so the assembly can be properly specified for construction. • This assembly relies on proprietary gyp board products for different options. The specific proprietary gyp board products to be used in this assembly are required to be identified/specified. • All required fasteners and fastener spacing are required to be specified for this assembly and for each layer of gypsum based for the assembly option(s) chosen. o Parapet construction requires noncombustible faces for the uppermost 18 inches (including counterflashing and coping materials). Update the detail to demonstrate compliance with this requirement. 0 The existing doors that are being utilized for egress from the existing Gym (assembly) are required to be provided with panic hardware. This needs to be specified on the drawings. 1010.1.10 0 Sizing of the modified means of egress for the existing building is required to be based on a means of egress capacity factor of 0.20 (not 0.15 as used in the calculations) unless the building is equipped with an automatic sprinkler system and an emergency voice/alarm communication system. Revise the egress design as required. 1005.3.2 a) Although the plan is to demolish the existing school during the summer/autumn of 2018, the plans need to demonstrate how code requirements will be met for buildings on the same lot. For the purposes of determining the required wall and opening protection, projections and roof covering requirements, buildings on the same lot are required to have an assumed imaginary lot line between them. 705.3 b) Given that the existing school will be demolished soon after the final construction and occupancy of the new school and that they will not be occupied simultaneously, the design team may wish to propose an alternate means to providing equivalent protection of both the existing and new construction. The proposal would need to address protection of the existing occupied school while the new school is under construction as well protection of the new occupied school during demolition of the existing school. This would be considered and alternate means and would need to be submitted to and approved by the Building Official. Egress 15) Gate G-6 is clearly shown as part of the means of egress and is required to be provided with panic hardware. Reference sheet G-101. Gate G-2 is required to be provided with panic hardware as it too is clearly a part of the means of egress. Reference sheet G-101. Additionally, Reference sheet A-611. Gate G-2 is noted as a sliding gate. G-2 is shown as a side -hinged swinging gate per G-101. Please coordinate. 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 7 of 11 Doors serving rooms or spaces with an occupant load of 50 or more in a Group E occupancy are required to be provided with panic. The following doors are required to be provided with panic hardware. Update the door schedule accordingly. 1010.1.10 121.2; 123.2; 136.1; 136.2; 201.2; 202.2; 203; 204; 207; 208; 301.1; 301.2; 305.1; 305.2; 401.1; 401.2; 402.1; 402.2; 403.1; 403.2; 407.1; 407.2; 501.1; 501.2; 505.1; 505.2; 601.1; 601.2; 602.1; 602.2; 603.1; 603.2; 607.1; 607.2; and G-6 (G-6 will serve as an exit even if it is not designated as one in the Life Safety Plan.) 17) In his response, the architect indicates that an emergency voice/alarm communication system is being provided for this project and it is identified on the electrical plans. As the electrical plans are not part of this permit, the architectural plans need indicate that an emergency voice/alarm communication system is being provided and should reference the electrical plans for details. In order to utilize reduced egress width per occupant (0.15"/occupant), an emergency voice/alarm communication system is required to be installed in accordance with 907.5.2.2. If it is the intent to provide a voice/alarm communication system, the plans need to clearly specify this and provide code specifications (907.5.2.2) to indicate required functioning. If not, all egress widths will be required to be recalculated. 1005.3.2 18) For the following comments, please reference sheets G-101 through G-103. In order to be an accessible means of egress, either an accessible route is required to be provided to the safe dispersal areas or an exterior area of assisted rescue is required to be provided. Please note the following requirements. 1009.2 a) Please provide the following in order to demonstrate that the routes to the safe dispersal area are accessible: - Identify slopes of the south ramp to demonstrate that accessible route requirements are met. If the slope is 5% or less, it is not considered a ramp. We assume this is the case. However, slopes need to be designated on the plans to demonstrate that it indeed is. If the slope is greater than 5%, then accessible ramp requirements need to be met (slopes, landings, handrails, edge protection, etc.). 1104; ICC A117.1-09, 405 - An accessible route remains to be identified and provided at the safe dispersal area to the north. In order to be considered accessible, a route is required to comply with the requirements of ICC A117.1-09, 403, including compliance with Section 302 which requires a surface to be 'stable, firm, and slip resistant'. Providing a concrete, asphalt, or otherwise stable, firm surface is required. Identify dimensions, slopes, etc. If ramps are necessary, then the ramp requirements of ICC A117.1-09, 405 will need to be met. b) Reference the Area of Assisted Rescue adjacent to Gate G-1. In order to serve this function, all of the requirements of an exterior area of assisted rescue are need to be addressed within the drawings. i) Provide design and detailing for providing the separation required by 1009.7.2. ii) Each door providing access to an exterior area of assisted rescue is required to be identified by a sign stating: "EXTERIOR AREA FOR ASSISTED RESCUE". 1009.9 iii) The exterior area of assisted rescue is required to be identified by the International Symbol of Accessibility. 1111.1, #10 iv) Instructions are required to be provided at the exterior area of assisted rescue in accordance with 1009.11. 1111.3, item #4 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 8 of 11 c) Signage is required to be provided at all locations where an accessible means of egress is not provided and at exterior areas of assisted rescue. Update the plans to specify required signage and locations of that signage: i) Exterior areas of assisted rescue in accordance with 1009.9. 1111 ii) Directional signage indicating the location of all other means of egress and which of those are accessible means of egress is required to be provided at exits not providing an accessible means of egress. 1009.10 The plans need to demonstrate how the required number of accessible means of egress will be provided to a public way or safe dispersal area. Two accessible means of egress are required to be provided. 1009.1 19) In response to this comment, the architect references sheets G-101& G-102 for signage requirements. However, these drawing sheets (including G-103) do not address signage. Please reference our new comments to item #18 above. It is acceptable if the actual signs will be provided as a deferred submittal. If this is the case, the plans need to be updated to indicate that this is the case. At a minimum, the drawings need to state that signage is required to be provided at the exits that are not an accessible means of egress and at exterior areas of assisted rescue. Notes should indicate what is required to be provided on the signage (see new comments to #18 above). Directional signage indicating the location of other means of egress and which of those are accessible means of egress are required to be provided at all exits that do not provide an approved accessible means of egress. Identify all doors & gates that do not provide an accessible means of egress and specify required signage to be provided at those locations. 1009.9; 1009.2 Accessibility (Chapter 11, ICC A117.1-09) 21) An accessible route remains to be identified and provided to the Playfield area to the north. In order to be considered accessible, a route is required to comply with the requirements of ICC A117.1-09, 403, including compliance with Section 302 which requires a surface to be 'stable, firm, and slip resistant'. Reference new comments to #18 above. The plans need to clearly demonstrate that an accessible route will be provided. 1104 a) between all buildings and b) to all amenities such as play areas and the track, etc. 22) In response to this item, the architect references us to the Landscape and Civil drawings provided in the Site Permit. Unfortunately, we have not been provided with these drawings. As accessible parking and accessible loading zones are governed by the Building code (IBC), those sheets applicable to accessible parking and loading zones (only those applicable sheets, please) should be included in the Building permit for reference. Accessible aspects will need to be reviewed under the Building permit. The original comment remains to be addressed. Provide a complete parking and passenger loading/drop-off plan. 1106 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 9 of 11 a) Provide accessible and van accessible parking spaces in accordance with 1106.1. Specify all requirements for accessible and van accessible parking spaces including parking space size, access aisles, signage, etc. 1106.1; ICC A117.1-09, Sec. 502 b) Provide accessible passenger loading zones in accordance with 1106.7. Specify all requirements for the accessible passenger loading zone. 1106.7; ICC A117.1-09, Sec. 503 23) In response to this comment, drawings were updated to identify a maximum height of 34" at the sinks in the Science Room. However, a front approach, including knee and toe clearance, are also required to be provided for the sink to be accessible. Please update the plans accordingly. At least one sink in the Science Room, Room 136, is required to be accessible. Revise the plans accordingly. 1109.2; 1109.3; ICC A117.1-09, 606 24) Reference our new comment to item #23 above. It is unclear if a cabinet is or is not provided at this location. Please specify the requirement for a front approach with knee and toe clearances to be provided. The sink in the Learning Support room, Room 102, is required to be accessible. Revise the plans accordingly. 1109.2; 1109.3; ICC A117.1-09, 606 25) Reference our new comment to item #23 above. It is unclear if a cabinet is or is not provided at this location. Please specify the requirement for a front approach with knee and toe clearances to be provided. The sink in the Parent Room, Room 132, is required to be accessible. Revise the plans accordingly. 1109.2; 1109.3; ICC A117.1-09, 606 26) In order for the sink in the Staff Lounge to be accessible, it is required to be provided with a front approach, including knee and toe clearance. This needs to be specified/demonstrated within the drawing set. The Staff Lounge kitchen, Room 101P, is required to be fully accessible. Update the plans accordingly as indicated below. 1109.4 a) The architect indicates that the cooktop controls comply with the code. However, compliance was not demonstrated within the drawing set. This item remains to be adequately addressed. Specify all requirements or otherwise demonstrate within the drawing set that the requirements will be met. Cooktop controls are required to be located so that reaching across burners is not required. ICC A117.1-09; 804.S.4.4, 804.5.5.4 b) The architect indicates that the refrigerator/freezer model complies with the code. However, compliance was not demonstrated within the drawing set. This item remains to be adequately addressed. Specify all requirements or otherwise demonstrate within the drawing set that the requirements will be met. Combined refrigerators and freezers are required to have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. ICC A117.1-09, 804.5.6 C) A cieaf Tloor space posaioneCl Tor a paraiiei approacn, ana OTTset zz4 maximum Trom ine centerline of the refrigerator/freezer, is required to be provided. ICC A117.1-09, 804.5.6 Plumbing Fixtures (Chapter 29) 27) Aside from the common grouped bathrooms, provide an analysis for each separate building/space where restrooms and sinks are provided in order to demonstrate that an adequate number of fixtures is provided at each of those locations. 2902.1 28) Washington State Amendments to the 113C require that not less than one urinal be provided in men's facilities that serve an occupant load of 26 or more. Currently, no urinals are specified. Please indicate how this requirement will be met and revise the plans accordingly. 2902.1.1.2 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 10 of 11 29) The code requires that separate facilities be provided for each sex. I understand that the intent is to provide gender inclusive restrooms and that this is being addressed in the submitted alternate means. 2902.2 30) Public facilities are required to be provided with signs that designate the separate sex for which the facility is intended. I understand that this is being addressed in the submitted alternate means. 2902.4 31) The number of drinking fountains provided in Building A should be based on the anticipated occupant load for that building as not everyone will have access to the drinking fountains in adjacent structures/classrooms. Determination of the number of drinking fountains should include consideration to the different occupant load scenarios (reference G-101 & G-102). 2902.5 Sheet G-004 — Building Code Review 32) This was not provided within the drawing set (G-004) as indicated and remains to be addressed. Membrane Penetrations (714.3.2) should be included in the code sections. 33) Section 1005.3 — Required capacity based on occupant load, should specify that an emergency voice/alarm communication system is required to be installed in accordance with Section 907.5.2.2 in order to achieve the reduced egress width values. 907.5.2.2 Sheet G-101 — Life Safety Plan 34) The Kindergarten Play area is not permitted to interfere with egress from the adjacent classrooms which egress into the Play area. Provide clarification to demonstrate that unobstructed egress will be provided at all times. 1003.6 Sheet G-102 — Concentrated Assembly 35) Clarify on the plans how the occupant load at the Concentrated Assembly area was determined [125(GYM) + 486 (COMMONS) = 611 (3 EXITS)]. Sheet G-121D — Floor Plan — Zone D 36) A reference is made to Cl/A-411. However, A-411 is not included in the plan set. Please coordinate. Sheet A-251 — Accessible Mounting Heights and Details 37) Ambulatory accessible compartments are required to have a clear width of precisely 36 inches. This clearance is neither a minimum nor a maximum. ICC A117.1-09, 604.10 38) Ambulatory accessible compartments are required to have the centerline of the toilet located 17" minimum and 19" maximum from the edge of the compartment. ICC A117.1-09, 604.2 39) The height of the drinking fountain for standing persons is required to be 38" minimum and 43" maximum above the finished floor. ICC A117.1-09, 602.4 40) Reference the Accessible Mounting Heights — Children detailing (Al/A-251). ICC A117.1-09, 609.4.2 a) The bottom of the vertical bar is required to be 21"-30" above the finished floor. b) The vertical bar is required to be located 34"-36" from the back wall. c) Reference DIV22 CHILDREN'S TOILET. The back grab bar is incorrectly located and dimensioned. Sheet A-256 — Interior Elevations Learning Support 41) A front approach, including knee and toe clearance is required to be provided. It is unclear from the drawings if a cabinet is located at this sink or if it is open underneath. Please clarify. Reference El — 102 Learning Support N. The sink is required to be accessible. Provide complete detailing to demonstrate compliance. 1109.3 16425 SE 66 th Street, Bellevue, WA 98006 # beckpllc@msn.com * PH: 206-313-3739 Permit: BLD2017-0041 (non-structural) June 30, 2017 Page 11 of 11 Other/New Comments 46) Reference sheet G-101. a) Identify the exterior man-cloor/gate and include it in the Door Schedule. It is required to be provided with panic hardware. 1010.1.10 47) Reference AVA-421 — Stair Section — Stair 1 Facing West a) IBC 1107.3 is referenced. However, this reference is incorrect. The correct reference is 1011.7.3 b) Identify the listed, tested assembly to provide the required 1-hour rating and provide complete specifications and detailing for construction. c) Aside from the soffit being 1-hour, the walls enclosing the usable space under the stairs are also required to be 1-hour rated. Identify the listed, tested assembly to provide the required 1-hour rating and provide complete specifications and detailing for construction. 48) Reference 131 & B3/A-552. Provide complete detailing for out -of -plane bracing at the 'slider heads' of the movable partitions. Coordinate with structural. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC 16425 SE 66 th Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739