2017-0041 Madrona Struc Beck #2.pdf Beck & Associates, PLLC Structural Engineering & Code Consulting June 30, 2017 Leif Bjorback Building Official City of Edmonds th 121 5 Avenue North Edmonds, WA 98020-3145 Subject:Madrona K-8 (Structural Review) Permit:2017-0041 nd Per your request, Beck & Associates has completed a 2 structural review of the drawings and calculations for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. _______________________________________________________________________ Legend: Faded text = initial comment adequately addressed – no further action required Plain text=initial comment (these remain where an additional comment is made) Blue text=additional comment in response to the resubmittal Geotechnical 1)The geotechnical engineer, Shannon & Wilson, Inc., is required to review the submitted permit plans and specifications that pertain to the geotechnical aspects of the project to determine if they are consistent with the recommendations (p. 18). Shannon & Wilson, Inc shall prepare a letter summarizing their review and identifying any recommendations for revisions to the plans. All recommendations are required to be addressed in the resubmitted plans. General 2) Reference sheet S-111C. Both footing E and a 4x8x30’ footing are called out for the same canopy footings. Please coordinate. Reference detail 27/S-609. Specify the required width of the plinth. Additionally, it may be helpful to locate the plinths on the foundation plan. Provide complete analysis and design for the following elements: a)Walkway covers occurring between buildings b)Covered Play area th 16425 SE 66 Street, Bellevue, WA 98006 beckpllc@msn.com PH: 206-313-3739 Permit 2017-0041 (structural) June 30, 2017 Page 2 of 4 S-101 through S103 –General Structural Notes 3)Reference the Design Loading Criteria on S-101. a)The correct response modification factor for the Small Canopies, consistent with the calculations, is R=2.5 Steel Special Cantilever Column System, not R=1.25. Update the plans accordingly. Specify lateral force resisting systems used for canopies, play structure, etc. b)Identify the base shear for each individual structure. nd 4)Reference note 33 on sheet S-102 (2 paragraph). Specify wind uplift pressures for which joists are required to be designed. 5)Reference not 34 on sheet S-102. Welds that are part of the seismic force resisting system (SFRS) are required to comply with clause 6.3 of AWS D1.8/D1.8M. This needs to be specified in the General Structural Notes. Additionally, the steel elements that are part of the SFRS are required to be identified on the plans. S-111A – Foundation Plan Zone A 6)Provide an analysis for the covered walkway located along grid 3 between grids D.5 and F.8. 7)Reference the Mechanical Level Framing Plan. Section 6/S-602 is called out. However, this is an incorrect reference. Should the reference be to 12/S-602? 8)In response to this comment the structural engineer provided calculations for bracing the top of the sliding glass partition (2x4@48” o.c.) for a base load of 5 psf. However, calculations were not provided to check seismic loads to see if they govern. Additionally, the engineer referenced B3/A552 for bracing requirements. B3/A552 does not specify bracing. a)Provide calculations to determine if out-of-plane seismic loads govern lateral bracing of the top of the sliding glass partition. b)Provide detailing for connection of required bracing to the head of the sliding glass partition framing and to the main building structure. c)Provide coordination with the architect for detailing of the brace and the connection at each end of the brace. Reference the architectural plans (A-121A) which identify a folding partition located between 101T and 101P (Prof Dev/Staff Lounge). Provide an analysis for and design of gravity support and bracing as required to brace the top of the folding partition against out-of-plane loads. S-111B – Foundation Plan Zone B 9)Reference the W6 shear wall located along grid C.3 (adjacent to the restrooms). The shear wall differs substantially from the conditions assumed in the calculations. Please coordinate. 10)Reference the W4 shear walls located along grid A.3. Calculations show that the shear walls (B6-NS/8) should be 2W3 shear walls in lieu of W4 shear walls. Please coordinate. 11)Reference the W2 shear wall along grid A.2 (between grids 3.4 & 4). The shear wall differs substantially from the conditions assumed in the calculations. Please coordinate. th 16425 SE 66 Street, Bellevue, WA 98006 beckpllc@msn.com PH: 206-313-3739 Permit 2017-0041 (structural) June 30, 2017 Page 3 of 4 S-121A – Roof Framing Plan Zone A 12)Reference the Seismic Force Resisting System Legend. The Strut Truss note should specify the spacing of the 10d nails. 13)Reference the Plan Notes. a)Note 1 specifies T&G plywood with a span rating of 32/16. However, note 3 specifies wood trusses to be spaced at 48” o.c. The spacing for wood trusses is 24”o.c. per the calculations. Please coordinate. b)Specify the spacing of steel trusses. It appears that the spacing is 48” o.c. 14)Are the steel trusses required to be designed to resist any axial forces due to out of plane wall loads on the west side of the Gym? 15)The analysis of the brace appears to apply an incorrect load to the brace. The horizontal load was determined to be 50.4k. This would result in a horizontal force of 50.4k/cos(36) = 62.3k. The load used for design appears to be based on 50.4k x cos(36), which would be incorrect. The horizontal load that needs to be transferred is 50.4k, realizing a higher force in the brace. Please review and revise the design/analysis and detailing (S-604) accordingly. Reference the attachment at the end of this review letter. Provide a complete analysis and design for the diagonal tension bracing as specified along grid G per detail 24/S-604. Bracing will essentially serve as a collector to transfer loads and should be designed considering overstrength. Alternatively, it would need to be designed as a part of the seismic force resisting system, SFRS, with an appropriate response modification factor, R, with consideration given to different systems being used in a SFRS. ASCE 7-10 16)Detail 24/S-604 appears to be cut at an incorrect location. 17)Provide an analysis for the covered walkway located along grid 3+ between grids D.5 and F.8. S-121B – Roof Framing Plan Zone B 18)A notes states: “See Sheet S-205 for Plan Notes and Legends.” It appears that the reference should be to S-121A. Please coordinate. 19)Specify the required seismic joint along grid 5, located at grid D. S-121C – Roof Framing Plan Zone C 20)A notes states: “See Sheet S-205 for Plan Notes and Legends.” It appears that the reference should be to S-121A. Please coordinate. 21)Specify the required seismic joints between the covered walkway and the buildings. 22)Provide an analysis and collectors/strapping in order to transfer lateral loads from the roof into the shear walls running in the longitudinal direction. 23)It appears that 26/S-604 and 30/S-604 should be called out for connections from strut trusses to shear walls along grid C, similar to grid B. Please address. Provide section cuts and detailing at interior and exterior shear walls in the longitudinal direction. Provide a complete load path. th 16425 SE 66 Street, Bellevue, WA 98006 beckpllc@msn.com PH: 206-313-3739 Permit 2017-0041 (structural) June 30, 2017 Page 4 of 4 S-121D – Roof Framing Plan Zone D 24)A notes states: “See Sheet S-205 for Plan Notes and Legends.” It appears that the reference should be to S-121A. Please coordinate. 25)Specify the required seismic joints between the covered walkways and the buildings. 26)Provide an analysis and collectors/strapping in order to transfer lateral loads from the roof into the shear walls running in the longitudinal direction. 27)It appears that 26/S-604 and 30/S-604 should be called out for connections from strut trusses to shear walls along grid J, similar to grid H. Please address. Provide section cuts and detailing at interior and exterior shear walls in the longitudinal direction. Provide a complete load path. S-502 – Steel & Metal Deck Details 28)Detail 6/S-502 needs to be completed. There is missing information. S-503 – Misc. Steel Details 29)Provide an analysis for the design of the covered walkways. S-607 – Covered Play Framing Plans and Details 30)Provide an analysis and complete detailing for the design of the Covered Play Framing. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC th 16425 SE 66 Street, Bellevue, WA 98006 beckpllc@msn.com PH: 206-313-3739