Loading...
2017-0042 Madrona Plm and Mech- Rainbow #2.pdf May 2, 2017 Mr. Leif Bjorback Building Official City of Edmonds 121 Fifth Avenue North Edmonds, Washington 98020-3145 Subject: Edmonds SD - Madrona School BLD20170041 Mechanical Permit Review 02 I have received and reviewed the above referenced project for conformance with the following codes, as adopted and amended by the State of Washington and the City of Edmonds: 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 Uniform Plumbing Code (UPC) 2015 Washington State Energy Code, WAC 51-11 (WSEC) The comments listed below only apply to the documents submitted with the building permit application for the mechanical and plumbing reviews (medical gas systems have not been reviewed): 1. Resubmit the Washington State Energy Code Compliance Forms using the 2015 forms. I acknowledge that there was a long delay waiting for current forms to be made available, but at this juncture we are able to utilize the correct forms. Please note that specifications are not reviewed; items listed as being required to be indicated on the plans need to be included in the plan set. Metrix: At the time of permit submission, the 2015 NREC forms were not available. The NEEC website required that the 2012 NREC forms were to be used until the 2015 forms were available. The information contained in the 2012 NREC forms is the same as the 2015 NREC form, other than the additional DOAS requirements, which is not required for this project being that it will be permitted prior to when the DOAS requirement goes into effect July 2017. The review process shall remain the same. There is ample time to provide the current 2015 WSEC forms and they are required for this permit submittal. As noted in the first review, specifications are not reviewed; items listed as being required to be indicated on the plans need to be included in the plan set. 2. Sheet M-001: Indicate on this sheet that the design meets the requirements of the 2015 IMC, 2015 IFGC, 2015 UPC, 2015 WSEC, and all local code amendments. Metrix: See attached Spec 23 00 10, section 1.06.b states and materials shall be in accordance with requirements of all applicable codes, rules and th Rainbow Consulting Mechanical Engineering 336 NW 50 Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com Edmonds SD - Madrona School BLD20170041 Mechanical Review 02 May 2, 2017 Page 2of 3 Specifications are not reviewed as part of plan review; provide the required information on sheet M-001. 3. Plumbing plans: Provide waste and vent pipe sizes for each discrete pipe section. Indicate drainage fixture unit counts on waste trunk lines. (This comment also applies to sheet M503). Note that 2- overloaded. Metrix: Pipe sizes to individual fixtures are shown in plumbing fixture schedule on M- 003. Drainage fixture units (DFUs) have been shown on trunk lines in revised underground drawings. 2-1/2 pipe sizes have been revised to 3. Increase font size of drainage fixture units (DFUs) so they are clearly legible; some DFU callouts are not readable as the waste line blots out the text. Revise plans as required. 4. Plumbing plans: Provide domestic water pipe sizes for each discrete pipe section. Indicate water supply fixture unit counts on main lines. (This comment also applies to sheet M503). Metrix: Pipe sizes to individual fixtures are shown in plumbing fixture schedule on M- 003. Water supply fixture units (WSFUs) have been shown on main lines in revised plumbing drawings. Increase font size of wso they are clearly legible. Revise plans as required. 5. Sheet M-003, Plumbing Fixture Schedule: Indicate that emergency showers and eyewashes are provided with an ASSE 1071 thermostatic tempering valve. Metrix: See attached plumbing fixture spec 22 40 00. P18 emergency shower shall be provided with Guardian G3800 thermostatic mixing valve or approved equal. Specifications are not reviewed as part of plan review; provide the required information on sheet M-003. 6. Sheet M-003, Plumbing Fixture Schedule: Indicate that water connections to ice makers are provided with reduced pressure backflow devices. Metrix: Ice maker in Sci Prep 136A served by reduced pressure backflow preventer located in room. See M221. Provide ice maker with dedicated reduced pressure backflow zone assembly. 7. Sheets M-122, M123: Flag note indicated on the plans, but no flag note referenced. Metrix: See revised M-122. Sheet M-122 still missing the flag notes on the plan. 8. Sheet M-221: Indicate that the dishwasher drainage connection located in the Staff Lounge is installed in accordance with UPC Section 414.3. -4 Dishwasher Connection provide braided stainless steel hose connection, air gap fitting in counter and waste th Rainbow Consulting Mechanical Engineering 336 NW 50 Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com Edmonds SD - Madrona School BLD20170041 Mechanical Review 02 May 2, 2017 Page 3of 3 connection to wye This language meets 2015 UPC, section 414.3 requirements. Specifications are not reviewed as part of plan review; provide the required information on sheet M-221. 9. Sheet M-322: Indicate type of vent provided for the kiln. Metrix: See EF09 in exhaust fan schedule on M005. Kiln shall be provided with Envirovent 2 kiln vent system. EF-09 is not shown on sheet M-322. What is the vent pipe material? Indicate both on plan. 10. Sheet M-322: The requirements for commercial kitchen hoods are governed by the IMC and including the hood information as for-reference-only is not adequate. Include a hood schedule in the mechanical plans. Be sure to indicate hood listings by rating agencies, hood material and gage. Metrix: See attached XK-201 kitchen canopy hood details sheet. Hood is not provided by mechanical contractor will be provided by others. Who is providing the hoods is not an issue; the kitchen hoods need to be included in a mechanical permit review. That can either be part of this review or be submitted under a separate permit submittal. 11. Provide specifications for the fume hood. Metrix: See attached plumbing fixture spec 22 40 00: P-9 for basis of design fume hood. Following review of the fume hood spec sheet, please verify exhaust air flow rate for the exhaust fan matches the specified hood. If you have any questions or require additional clarification on any of the items contained in this letter, please email me at steven@rainbowconsulting-me.com or contact me directly at 206-235-6002. Sincerely, Rainbow Consulting LLC Steven Rainbow, PE cc: Douglas Beck, Beck & Associates, PLLC, beckpllc@msn.com th Rainbow Consulting Mechanical Engineering 336 NW 50 Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com