Loading...
2017-0042 Madrona Plm and Mech- Rainbow.pdf February 7, 2017 Mr. Leif Bjorback Building Official City of Edmonds 121 Fifth Avenue North Edmonds, Washington 98020-3145 Subject: Edmonds SD - Madrona School BLD20170041 Mechanical Permit Review 01 I have received and reviewed the above referenced project for conformance with the following codes, as adopted and amended by the State of Washington and the City of Edmonds: 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 Uniform Plumbing Code (UPC) 2015 Washington State Energy Code, WAC 51-11 (WSEC) The comments listed below only apply to the documents submitted with the building permit application for the mechanical and plumbing reviews (medical gas systems have not been reviewed): 1. Resubmit the Washington State Energy Code Compliance Forms using the 2015 forms. I acknowledge that there was a long delay waiting for current forms to be made available, but at this juncture we are able to utilize the correct forms. Please note that specifications are not reviewed; items listed as being required to be indicated on the plans need to be included in the plan set. 2. Sheet M-001: Indicate on this sheet that the design meets the requirements of the 2015 IMC, 2015 IFGC, 2015 UPC, 2015 WSEC, and all local code amendments. 3. Load calculations: Include a copy of the load calculations with the plans. In addition, provide a summary of the cooling and heating loads and the corresponding equipment capacities. 4. Provide domestic water service sizing calculation on the plans that indicates all fixtures, length of piping, and water pressure. 5. Plumbing plans: Provide waste and vent pipe sizes for each discrete pipe section. Indicate drainage fixture unit counts on waste trunk lines. (This comment also applies to sheet M503). Note that 2- overloaded. 6. Plumbing plans: Provide domestic water pipe sizes for each discrete pipe section. Indicate water supply fixture unit counts on main lines. (This comment also applies to sheet M503). th Rainbow Consulting Mechanical Engineering 336 NW 50 Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com Edmonds SD - Madrona School BLD20170041 Mechanical Review 01 February 7, 2017 Page 2 of 2 7. Sheet M-003, Plumbing Fixture Schedule: Indicate that emergency showers and eyewashes are provided with an ASSE 1071 thermostatic tempering valve. 8. Sheet M-003, Plumbing Fixture Schedule: Indicate that water connections to ice makers are provided with reduced pressure backflow devices. 9. Sheet M-122: Provide vent for drain CD-1. 10. Sheet M-122: The kitchen equipment plan labels are interfering with the legibility of the plumbing plan; revise as required. 11. Sheets M-122, M123: Flag note indicated on the plans, but no flag note referenced. 12. Sheets M-221, M-222, M-223: Label and size all condensate piping. 13. Sheet M-221: Indicate that the dishwasher drainage connection located in the Staff Lounge is installed in accordance with UPC Section 414.3. 14. Sheet M-322: Indicate type of vent provided for the kiln. 15. Sheet M-322: The requirements for commercial kitchen hoods are governed by the IMC and including the hood information as for-reference-only is not adequate. Include a hood schedule in the mechanical plans. Be sure to indicate hood listings by rating agencies, hood material and gage. 16. Sheet M-322: There is a 22x14 on the north side of the kitchen which doesnt appear to connect to anything. Please clarify the purpose of this duct. 17. Sheet M-502: Provide drain for all RPBA installations. 18. Sheet M-502: Add the indicated flag notes to the plan. 19. Sheet M-601: I was unable to locate the plumbing vent connected to the grease interceptor. Please point this out or update plans as required. 20. Sheet M-802: Provide MPG pipe size for line serving the two boilers. 21. Sheet M-904: Gravity grease interceptor calculations are based upon 2012 UPC. Update as required to 2015 codes. If you have any questions or require additional clarification on any of the items contained in this letter, please email me at steven@rainbowconsulting-me.com or contact me directly at 206-235-6002. Sincerely, Rainbow Consulting LLC Steven Rainbow, PE cc: Douglas Beck, Beck & Associates, PLLC, beckpllc@msn.com th Rainbow Consulting Mechanical Engineering 336 NW 50 Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com