2017-0054 Carrington remodel-addition - Western Edge Arch (2).pdfoy ED O City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: April 21" 2017 TO: Western Edge Architecture & Design fergv_51(2hotmail. com FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017-0054 Project Address: 714 Fir Street Project: Carrington addition -remodel Scope: addition to garage/entry/deck — remodel to include conversion of portion of garage to living space, remove/add interior non -bearing walls, relocate/add windows, reconfigure interior spaces — R-3/U occupancy groups — VB construction — mechanical and plumbing included Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Please see items marked in red as they are unresolved items and will need to be addressed to complete this plan review. Additional comments are noted in italics. On sheet G-001 — Cover Sheet: Energy Code Compliance — Note 1 — Change on the plans the information regarding the climate zone to that per the currently adopted Washington State Energy Code (WSEC) Table R301.1. 2. Site, Zoning, Code Information a. Site Information: i. Change on the plans the county the parcel is located within from `King' to 'Snohomish'. ii. Change on the plans the legal description of the parcel from that indicated to that recorded with the Snohomish County Assessor. b. Zoning / Code Information: Jurisdiction — Change on the plans the authority having jurisdiction over the project from `Snohomish County' to `City of Edmonds'. c. Building Code Information: i. Design Dead Loads: Floor — Clarify on the plans the indicated load. It does not appear to reflect that `typical' or anticipated by the represented construction. ii. Design Live Loads: Roof — Change on the plans the indicated load from `25' to `40' per International Residential Code (IRC) Table R301.5. 3. Fire Protection Compliance — Note 3 — Clarify on the plans the reference to MC Table 508.4 regarding the indicated dwelling -garage separation. The referenced table or a corresponding requirement cannot be found in the currently adopted version of the IRC. On sheet G-002 — General Info — Gen. Notes/Symbols: 4. General Notes, cont.: Note 30, Item 4 — Change on the plans the wording regarding the emergency escape and rescue opening from `finished sill...' to `clear opening...' per IRC R310.2.2. On sheet A-101 — 1st Floor Plan: 1st Floor Plan (N) a. Indicate on the plans the installation of the natural gas fueled fireplace in the `Recreation Room' noted on the City of Edmonds `Residential Building Permit Application' to accurately reflect the project scope of work. b. Indicate on the plans the required carbon monoxide alarm per MC R315.2.2. c. Indicate on the plans the minimum required construction of the `(N) Extended Entry' floor to guide proper review, construction, and inspection. Include the size, species, grade, and spacing of any wood framing materials or any other proposed construction criteria. d. Indicate on the plans the proposed path of compliance to meet the WSEC provisions for the change of nonconditioned space of the garage to conditioned space for `Bedroom 1' per WSEC R502.1.2 and/or R505.1. Of particular concern is the prescriptively required perimeter insulation of the slab in the area of the change of occupancy. e. Indicate on the plans the required local exhaust for the enclosed area of the `Laundry' per MC R1507.4. f Indicate on the plans the required local exhaust for the Bathroom' per MC R1507.4. g. Indicate on the plans the proposed method of meeting the `make-up air' and `combustion air' requirements for the installation of the furnace and dryer in the enclosure of the `Laundry' per MC G2407. h. Indicate on the plans the minimum required beam to support the loads over the new windows in the north wall of the `Recreation Room'. i. Indicate on the plans the minimum column to support the loads below each end of beam `7' — 4x8 DF #2 — over the window in the south wall of the `Master Bath'. Page 2 of 5 j. Clarify on the plans the represented width of the `raised shear wall' along the east side of the garage door opening. It does not appear to meet the minimum width specified on detail `2/A-201' — Raised Shear Wall. k. Indicate on the plans the proposed orientation of the deck joists used to support the `Enlarged Deck' to guide proper review, construction, and inspection. Of particular concern are the cantilevered framing members required to support the cantilevered portion of the deck at the northwest corner of the structure. 1. Indicate on the plans the minimum column to support the loads below each end of beam `13' — 6-3/4 MS GLB — over the north end of the `Garage'. m. Indicate on the plans the minimum required `widened' or isolated footing to support the cumulative loads below the east end of beam `13' — 6-3/4 MS, the west end of the `(N) 4x12 DF #1 header if needed' on sheet `A-103' — Roof Structure, and the north end of the east -most beam `3' — 3-1/2x12 GLB — over the `Living Room' on sheet `A-103' —Roof Structure. n. Indicate on the plans the minimum required beam to support the floor loads over `CL-1' and the south end of the `Garage'. o. Indicate on the plans the minimum column to support the loads below each end of beam `15' — 3-1/2x9-1/2 GLB — over the opening to `CL-l' in `Bedroom 1'. p. Indicate on the plans the minimum column to support the loads below each end of beam ` 16' — 4x 12 DF #2 — over the window in the south wall of the Bedroom 1'. q. Indicate on the plans the minimum required beam to support the loads over the new window in the west wall of the `Bedroom 1'. r. Clarify on the plans the callout for the 24"x24"x10" isolated footing to be used to support the loads below the north end of the `(E) roof ridge beam (used to support the east end of beam `4'). It appears to be undersized for the loads anticipated by the represented construction and the loads noted in the provided structural calculations for the `existing ridge with new loading'. Note: the beam calculation for beam `4' does not appear to reflect the actual loading conditions — the loads from the connections of beams `3' result in a greater load at the east end of the beam instead of the uniform roof loading shown. 6. Beam Schedule a. Beam 11 - Indicate on the plans the required orientation of the `HGUS 5.5/10' beam connector to support the loads when constructed as represented in the provided structural calculations. b. Beam 13 i. Clarify on the plans the specified size of the beam. ii. Indicate on the plans the minimum required beam connector and its orientation to support the loads when constructed as represented in the provided structural calculations. On sheet A-102 — 2nd Floor Plan: 7. 2nd Floor Plan (N) a. Indicate on the plans the installation of the natural gas fueled fireplace in the `Master Bedroom' noted on the City of Edmonds `Residential Building Permit Application'. b. Indicate on the plans the required smoke alarm per IRC R314.2.2. c. Indicate on the plans the required carbon monoxide alarm per IRC R315.2.2. Page 3 of 5 d. Indicate on the plans the required local exhaust for the following areas per IRC R1507.4: • Kitchen • Guest Bath • Master Bathroom • Master Bathroom water closet • Master Bathroom shower enclosure * Include CT A4 ratings q/.' fans on plans e. Clarify on the plans the note "Expand deck to maximum of 20' front yard setback" regarding the deck serving the `Master Bedroom'. Additional information supporting structural changes in that area could not be found elsewhere in the provided construction documents. f Provide on the plans a detail and a reference to it for the minimum required construction to transfer the lateral loads from the shear wall along the north side of the `Living Room' — wall line `A' level `2' in the provided structural calculations — to the shear walls below. g. Clarify on the plans the difference in the indicated `new' roof beams noted along the south side of the structure and of that proposed on sheet `A-103' — Roof Structure and Roof PI (N). h. Indicate on the plans the minimum `typical' beam to be used to support the loads over various openings for windows and doors. i. Clarify on the plans the callout for beam `6' — 3.5x11.25 GLB — to be used to support the loads over the `bifold glazed doors' in the north wall of the `Living Room'. It appears to be over spanned and deflects beyond that allowed per IRC Table R301.7 when subjected to the design loads. The size of the beam also appears to be different than that indicated in the provided structural calculations (for a shorter span). j. Indicate on the plans the minimum column to support the loads below each end of beam `6' — 3.5x11.25 GLB — over the `bifold glazed doors' in the north wall of the `Living Room'. k. Clarify on the plans the callout for beam `6' — 3.5x11.25 GLB — to be used to support the loads over the `bifold glazed doors' in the north wall of the `Master Bedroom'. It appears to be over spanned and deflects beyond that allowed per IRC Table R301.7 when subjected to the design loads. The size of the beam also appears to be different than that indicated in the provided structural calculations (for a shorter span). 1. Indicate on the plans the minimum column to support the loads below each end of beam `6' — 3.5x11.25 GLB — over the `bifold glazed doors' in the north wall of the `Master Bedroom'. m. Clarify on the plans the callout for beam `7' — 4x8 DF #2 — to be used to support the loads over the window in the south wall of the `Master Bath'. It appears to be over spanned, fails in bending and in shear, and deflects beyond that allowed per IRC Table R301.7. The span of the beam and the various loads indicated in the provided structural calculations do not appear to reflect that anticipated by the represented construction. With the revision of'the window size. A 4"X8"DF #I header is still indicated on the plans. A 4"x8"DF #I header is still over stressed f6r the conditions and does not match the revised engineering submitted Clarify which beam, is to be used and change on the plans. n. Indicate on the plans the minimum column to support the loads below each end of beam `7' — 4x8 DF #2 — over the window in the south wall of the `Master Bath'. Page 4 of 5 On sheet A-103 — Roof Plan: 8. Roof Structure a. Clarify on the plans the note "(N) 4x12 DF #1 header if needed" below the north end of the existing roof ridge beam. There does not appear to be a specified determinant regarding the `need' of the header. Typically, a note is added to `verify' the presence of a beam determined to be the minimum necessary to support the design loads. b. Clarify on the plans the means to be used to support the existing north -south oriented roof beams over the east portion of the structure. The work represented on sheet `A- 102' — 2nd Floor Plan (N) — appears to include the removal of bearing walls, similar to that on the west side of the structure. On sheet A-400 — Details: 9. Detail 2 — Holdown / Shearwall Schedule - Clarify on the plans the callout for the "SET" epoxy to be used for the post -installed anchorage of the `HTT4' tension tie. Specified epoxies must be tested in accordance with the International Code Council (ICC—ES's) Acceptance Criteria for `Adhesive Anchors in Concrete Elements' (AC308) for use in this type of installation. 10. Detail 3 — Roof Girder Detail — Provide as part of a complete permit application submittal information from the `closed cell spray foam insulation' manufacturer regarding the air- permeability/air-impermeability and the `R-value' per inch of applied product to meet the requirements of IRC R806.5. On sheet A-401 — Details: 11. Detail 1 — Stair Section — Indicate on the plans the required construction to limit the passage of a 4-inch sphere between the open risers per IRC R311.7.5.1. On the provided structural calculations: 12. Sheet 5.1 — Clarify the difference in the number and length of shear walls indicated along wall line `A' on level `2' and of that represented on sheet `A-102' — 2nd Floor Plan (N). Verify the effect upon the design of the shear walls on level ` 1' . Page 5 of 5