Loading...
20170103135636.pdfSlay Valley Testing, LLC ate: P.O. Box 835 04/22/16 Monroe, WA 98272 V Da of Week: ....�.0.._.w..w m_............._._............................ Friday Job Name S Location: Weather: Sprague St Side Sewer Sunny Mileage: 919 Sprague. Edmonds WA 32 Observation Category Contractor: RMK 306: 1654 Time On Site: 3.0 Drive Time: 1.0 Total Hours: 4.0 Forman: Doug Test Paint Number 1 Test Location Side Sewer Fill Depth (ft.) Elevation Feet 4'<S.G Moisture Content (% 6.3 Dry Density (pcf) 118 Max. Dry Density (pcq 112.8 Compaction Percentage 96% 2 3 4 Side Sewer Side Sewer Side Sewer 4'<S.G. 2'<S,G. 2'<S.G, 6.6 7.9 7.3 117 120 119 112.8 112,8 112.8 95% 98% 97% 5 Side Sewer S.G. 6.1 118 112.8 96% 6 Side Sewer S.G. 5.9 117 112.8 I 95% I II NOTES: Checked backf ill placed over side sewer for new residence on north side of Sprague Street under construction. Contractor tapped into existing main to run side sewer to north side of road. Backfilled with imported crushed rock. A jumping jack compactor was used to compact crushed rock in lifts to street sub grade. Contractor capped street with cold patch asphalt end of day. Geotech in Field: Jerry Boyd Sky valley Testing, LLC Soil Consultants/ Geotechs/ Compaction Testing (206) 949-4938 Moisturt, Density Relationshil) Ctll've . . . . . .. ........... . . .. ....... . . ...... 9c) I S i U R F, C ON T N I - P F R C E NI F D RY �,A/E i G T 0 CAo qiq N