20170124135444.pdfPACIFIC ENGINEERINGDESIGN, LLC m:::....:... 0 CIVIL ENGINEERING AND PLANNING CONSULTANTS January 12, 2017 City of Edmonds Attn: JoAnne Zulauf 121 51h Avenue North Edmonds, WA 98020 Subject: BLD20160215-3,d Our Proiect Number 16001 Response to November 4, 2016 Plan Review Corrections JoAnne, Thank you for your timely review of our Building Permit application. The following response is made to the comments presented in the November 4 plan review correction letter. The following outline provides each of your comments in italics exactly as written, along with a narrative response describing how each comment was addressed: 1. 1114116 Completed but may need revising per other comments. Please complete site plan (sheet A-1) to include all required information. Remove spot elevations for clarity, the contours are sufficient. See example. 2. 9112116 Done. 3. 9112116 Done. 4. 1114116 See Plan Markups (attached) for remaining items to correct/revise. 9112116 Incomplete. 1) 1114116 Completed. 2) 1114116 Completed. 3) 1114116 Completed. 4) 1114116 Completed. 5) 1114116 Completed. 6) 1114116 Completed. 7) 1114116 Currently waiting for word back from the Water Division on the configuration. Please contact Kris Kuhnhausen for more information at Operations 425-771-0235. Water meter must be installed on the right of 'il)ay side of the property line. Response: Done. Called Water Division — No response. We agreed in a meeting that the exact location of the meter is to be decided in the field by the contractor and City Water staff. 8) 1114116 Completed. www.paceng.com 15445 59RD AVENUE SOUTH, SUITmm 100, ..SEA...._LE,...�__A...981S9 FAX 206 . _.. � N_ 261-�.®...._��_...�.....� �®E�-1641� PFiFJIlIE 425 251-53811 206 431-7970 City of Edmonds Attn: JoAnne Zulauf 2 January 12, 2017 Response to November 4, 2016 Plan Review Corrections PED Project No. 16001 9) 1114116 Completed. 10)1114116 Completed. 5. 1114116 Completed. 6. 1114116 Completed. 7. 9112116 Completed. 8. 9112116 Completed. 9. 9112116 Completed. 10. 1114116 Completed. 11. 1114116 Completed 12. 9112116 Complete. 13. 9112116 Complete. 14. 1114116 Completed 15. 9112116 Complete. 16, 1114116 Completed. 17, 1114116 No longer applicable 18. 1114116 See Stormwater Pump Report Comments below. 9112116 This review ivill be deferred to the next submittal due to the changes required to the stormwater system. Note, current stormwater report, page 2, states the force line is to be installed all the way to 94th. Please provide a stormwater pump report as described in detail in. the City of Edmonds Handout E62 Regulations for Private Residential Sewage Pumps in Edmonds (Single Family Residential Only). The handout is for sewage but the requirements for pump submittal is the same. Please review handout carefully to ensure that all required information is provided in the resubmittal. Response: Storm Pump Report Revised. 19. 1114116 Completed. 20. 1114116 Completed 21. 9112116 Completed. 22. 9112116 Completed. 23. 9112116 Completed. 1114116 Stormwater Pump Comments: Michele (Mike) De Lilla, PE, LEED AP City of Edmonds Senior Utilities Engineer mike. delilla@edmondswa.gov (425) 771-0220 Review of. w Design Plans Engineer stamped 1013116 and signed by Greg A Diener • Storm Drainage, Storm Pump Station and Forcemain Report Engineer stamped 912712016 and signed by Jingsong Feng: Review Comments: 1. Design Sheets (COI, CO2, CO3, & C05) City of Edmonds Attn: JoAnne Zulauf 3 January 12, 2017 Response to November 4, 2016 Plan Review Corrections PED Project No. 16001 a. Delete flow control structure. The pump needs to act as the flow control structure and needs to discharge the same as a code compliant gravity detention system. 2. Page 3 of Storm Drainage, Storm Pump Station and Forcemain Report a. Currentpump is currently designed to discharge at a rate greater than allotived Please size it per the handouts. 3. Design Sheet (CO4) a. Need details for pump system and structure in the plan set, including anti flotation device and associated buoyancy tales. 4. Design Sheets (CO1, CO2, CO3, & C05) a. The overflow for the detention system as shown on the plans is not acceptable since it would cause downstream erosion, sedimentation. Downstream building flooding is also likely. Therefore the overflow will also need to be a pumped system designed to handle the overflow flow rate and the system will need an external alarm and backup power to power the overflow pump. Design plans and report will need to reflect this accordingly. Please contact Mike De Lilla at the contact information above with any questions concerning the stormwater pump comments. In light of the storm pump comments, is it possible to maybe put the pump structure at the back of the house and then force line to the detention, maybe in the front of the house or wherever it is possible to gravity to avoid some of the issues above? Just a thought. Response: Detention tank has been moved to the access easement under the access driveway and has a gravity outfall to the drainage ditch that is a part of the Talbot Park B Creek drainage system. Use the existing dry well as the pump storage tank. Use a sump pump installed in a Type I CB to pump storm water to the detention tank. The sump pump is equipped with a battery back-up system and external alarm. We believe that the above responses, together with the enclosed revised plans address all of your comments. Please review and approve this project at your earliest convenience. If you have questions, comments, or need additional information, please contact me at your convenience. Thank you. Sincer y, PAC C "']NEERING DESIGN, LLC Attachment: *Revised Plans *Revised 2016-12-20 TIR Copy: Dale Fonk