City of Edmonds Building Department Cir(,)F IEDM0?4DS,
Select Homes
BLD2016-1238
Plan 3132
23924 104th Ave W
6. Sorry for the incorrect note on the previous resubmittal. The Adobe program didn't
save the revised sheet into the revised plan set. The correct file has been uploaded into
the final plan set.
8. We have removed the windows from the great room fireplace wall so that we can not
only revise the shear nailing for Line 2 Main to P1-4" but it also allows for transfer of the
P1-6" shear walls on the upper level to the foundation. Please see revised plans and
calculations.
10. We have revised this detail to remove the toenails. See L1
11. Shear values reviewed and revised
Mike Johnson
Nash and Associates Architects