20170125104141.pdfI q- SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #.- BLD2-0160146
Project:
mast returned Prior to issuance ofapemdt, this form mu be etyand arnedtothe City for
approval, The completedfor m must have signatures of acknowledgment by all parfies.
DUTUES AND RESPONSIBILITEES
Ira jo , FInd Spec a I laspectors."
VSLX-m a
The Special Inspection fin-n of 16-azan & Associates, Inc. will perform special inspection for the following
types of work (separoe firms must, be submitted if more thap one firth is to be employed): -
R Structarad Stee, welding
All individual inspectors to be employed on this prOject, will , be WAJ3Q certified for tfie type of wort they are to
inspect. if inspection, is for work that is not covered by t1w WAW categories, or the inspector is not WA
certified, a detailed resurne of inspootor and firm must be subm itt c The 1-csome must show that the
inspector and the fun are qualified, by education and experience to perform the work mid testing required by the
project design and specifications.
The work shall be inspected for confortnaum with the plans and specifications, approved by the City, Revisions
and addenda sheets will not be used for insPoWbri, unloss they have been approved by the City. Inspection
records shall include:
A- daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the inirpediate attention of the contractor for resolution,
A weekly report shall be submitted to the City; detailing die inspections and testing performed, listing
any nonoo4forining word and resolution Of nO=oTrFbru1iR9 items.
A'fmal report s1rall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that i'lVection and''icsting was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in. the -final report:
Cqq,t_ractor., adequate nod lication of work requiring inspection
The contractor shall provide the special inspector or agency
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regulariuspections, No concrete shall be
poured Or other work covered until approval is given ]bY the City inspector.
PR0JJ].CJVUmn= ADdens n BandsheU Replac—MCO-tmction\800 Reports gtudles&
rcszXo 111spoodonskWou u&Pecial i urmotion md tLstir% Vmmcnt COE.dool/292017
The building departraent,$ball review zany revisions and addenda. The City inspector will monitor the special
inspection ftinctions for compliance with the agreernent and the approved plans. The City inspector shall be
responsible for approving, various stages of construction to be covered and for work to proceed,
Ilwesian P Yofessional— of special
The architect andfor engPleer will clearly indicate-, on the plans and specifications the specific, types or
inspection required and shall include a schedule, for inspection and testing. The architect and/Or engine w .ill
coordinate their revision and addenda process in sucli a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner.
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency-,
ENFORCEMENT
A failure of the special insPOCtOr Or firm to perforrn in keeping with the requirements of the 113Qthe approved
plans and this document, akay void this agreement and, the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perfon-win apcordappe with this agreement may result in a STOP W ORK
notice bein8 posted on the proj"t until nonconforining items have been resolved.
ACKNOWLEDGMENTSI have, read and agree to comply with the terms, and conditions of this agreement.
Date 14 3 A
Owner
Signature : I L, s �
ft
Contrdctw:—L�
Special Insp- Agency -X'1 & -AssooialLes, 110,
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT.
Date.
Date:
Date*
Date:A-117
VWdmsyt-4ctytW-rkgiri-.cring\CapftaP.CAPITAL pR0JF',C1SW=f�" Arxkrson 4andshull Repl=wicntCOIISLti068W Reports Studies &
-1"zsjrAR7-0 inspylion mid testing a4acment COE.docMV2017