Loading...
20170125111915.pdfFA,E�CO, Jan 19, 2017 Reg: The Needlepointer TI located at: 22811 100th. Avenue West Edmonds, Washington 98020 Plan check: BLD2016-1462 City of Edmonds Building Division Edmonds, Washington Chuck Miller, Plans Examiner Dear Mr. Miller: We reviewed your plan check dated on January 12, 2017, and our response to your structural comments in numerical order is as follows: Item #6 a. Please see revised criteria at General Structural Notes on Sheet S 1 Item #6 b. Please see revised note 24.A Item #7 Please see revised detail 1 S2 Item #8 Please see revised detail 2S2 Item #9 Please see revised detail 3S2 Item # 10 a. Please see revised detail 4S2 Item # 10 b. Please see revised detail 4S2 -Item #_1_1_ a. Please see -revised _detail 5 S2 Item # 11 b. Please see revised detail 5 S2 Item #12 Please see revised detail 15S2 Item # 13 The ceiling framing at the "Break Room" at the removed wall is supported by the continuous existing floor framing above to be verified by the contractor. see revised partial 2nd. floor framing plans on sheet S3. Item # 14 Please see revised partial foundation plan for new added footing at the converging ends of the 3 1 /2 x 9 1 /2 GLBs. Please feel free to give us a call if you have any questions. Best Regards, Khaled Y. Sabra, MERE SABCO CONSULTING ENGINEERS INC. 11322 34TH. DRIVE S.E. EVERETT, WASHINGTON 98208 TEL (425) 338 0342