20170214153814.pdf4F1
k_-JTY OF EDMONDS
1215TH AVENUE NORTH - EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 02/14/2017
Expiration Date: 08/14/2017
Parcel No: 00451200000105
PRO PERTY0 NNI N Ell APPLICANT CONTRACTOR
CHARLES K & TAFAZZOLI FAR SCOTT CHARLES'K & TAFAZZOLI FAR SCOTT GLOBAL PLUMBING
19003 80TH AVE W 19003 80TH AVE W PO BOX 58322
EDMONDS, WA 98026-6010 EDMONDS, WA 98026-6010 RENTON, WA 98058
(425) 967-5312 (425)967-5312 (206)383-8001
LICENSE#: GLOBAP*880MS EXP:07/
REPLACE W SL
VALUATION: $0.00
018:
PERMIT TYPE: Residential
PERMIT GROUP: 47 - Plwnbing
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY:
OCCUPANT GROUP,
OCCUPANT LOAD:
FENCE: 0 X 0 FT.
'ODE. 2015
OTHER: ------- OTHER DESC:
ZONE
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #,
BASEMENT ° 0 1 ST FLOOR: 0 2ND FLOOR. 0
BASEMENT. 0 I S1' FLOOR: 0 2ND FLOOR; 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
BEDROOMS:0 BATHROOMS:0
BEDROOMS.0 BATHROOMS:0
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULAT ING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED
THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27,
12 A1"I'1jiCA`S` k0 1S'NOT A PERMIT UNTIL SIGNED BY THE WII II 1 G OFFICIAL OR HIS/HERIII,;PI P' ")m`AND ALL FEES ARE P 11) ,.
1� 460) LEI 454 2,11
lgnature Rhit,r lame Nt6 I eleased By ate
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED; UBC109/ IBC110/ 1RC110.
ONLINE APPLICANT ASSESSOR OTHER
• TCC
• Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building.
0 City approvedplastic piping may be used in water service piping provided that where metal water service piping is used for
electrical grounding purposes; replacement piping shall be of like materials (UPC604.8). A state electrical permit and
inspection is required if electrical' grounding is altered, removed, improved, or added. Contact State Dept. of Labor &
Industries Electrical Division at425-290 1309.
• Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required; City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation '(hereinafter "variance"),from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
•) Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
0 Sound/Noise originating from temporary, construction sites as aresult of construction activity are exempt from the noise limits
ofECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
ham>fess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements.
• Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION' ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS; DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
• E Water Service Line