Loading...
20170214163105.pdf1"u'1G2 'orllr,:"lratiic!m 0 l IS , �� i ir7 A,,/(, , S t I G �.!,tt11,',V A 9s171 I To Attendees From Brad Barbee, MG2 Cc file RE Pre-ADDlication Meetinq with City of Edmonds Attendees: Date February 14, 2017 Project HomeStreet Bank - Edmonds, WA Project Number 15-5117-01A Brad Barbee grad Aftg' Mg2—com 206.962.6639 Elisha Person Iisha,g solo mmg2 corn, 206.240.0002 Fred Lawson f_red.l rson ,mt omesti; ee ,l)ank oi-ri206.264.4107 Toby Coenen t;gbyc; 7 « c_ .n q�s, cprij 425.827.2014 Civil & site design questions: Parcel A - two tax parcels with one legal lot Do tax parcels need to be consolidated for permitting review? 15'-0" setback along the west property line Are there landscape requirements for this area? New retaining wall along south, west and north of property Will this be considered a structure and require setbacks? Site entrance and drive-through/exit proximity to street parking and alley acceptable? Existing East/West Storm drain line is this a city maintained storm drain? Existing memorial bench and flower pole options for relocating? Open space - location and size Design/landscape requirements? Electrical transformer location and clearances Is screening required? Associate/MG2 Architect/MG2 Owner/HomeStreet Civil/PACE Building questions: Does building architectural language meet the standard requirements? Does building massing meet the design intent to create a more pedestrian scale? Is mechanical rooftop screening required for this project?