20170214163105.pdf1"u'1G2 'orllr,:"lratiic!m
0 l IS , �� i ir7 A,,/(, , S t I G
�.!,tt11,',V A 9s171
I
To Attendees
From Brad Barbee, MG2
Cc file
RE Pre-ADDlication Meetinq with City of Edmonds
Attendees:
Date February 14, 2017
Project HomeStreet Bank -
Edmonds, WA
Project Number 15-5117-01A
Brad Barbee grad Aftg' Mg2—com 206.962.6639
Elisha Person Iisha,g solo mmg2 corn, 206.240.0002
Fred Lawson f_red.l rson ,mt omesti; ee ,l)ank oi-ri206.264.4107
Toby Coenen t;gbyc; 7 « c_ .n q�s, cprij 425.827.2014
Civil & site design questions:
Parcel A - two tax parcels with one legal lot
Do tax parcels need to be consolidated for permitting review?
15'-0" setback along the west property line
Are there landscape requirements for this area?
New retaining wall along south, west and north of property
Will this be considered a structure and require setbacks?
Site entrance and drive-through/exit
proximity to street parking and alley acceptable?
Existing East/West Storm drain line
is this a city maintained storm drain?
Existing memorial bench and flower pole
options for relocating?
Open space - location and size
Design/landscape requirements?
Electrical transformer location and clearances
Is screening required?
Associate/MG2
Architect/MG2
Owner/HomeStreet
Civil/PACE
Building questions:
Does building architectural language meet the standard requirements?
Does building massing meet the design intent to create a more pedestrian scale?
Is mechanical rooftop screening required for this project?