Loading...
20170215110634.pdfV Lovell-Sauerland and Associates, Inc. Phone: 425-775-1591 19217 3611' Avenue West, Suite 106 LSAEngineering.com $ 'M 0 fi f Z M — Lynnwood, Washington 98036 Surveyors / Engineers / Y g Planners / Development Consultants JoAnne Zulauf Engineer Division City of Edmonds Re: BLD20160598, Brackett Court 21276 80th Avenue W, Edmonds Dear Ms. Zulauf: R ,31 February 13, 2016 LSA No. 5537 Cr `OF F This letter is to address the review comments made by the Engineer Department on February 9, 2017. The numbers of the responses correspond to the comments on the review. I will attempt to point out how and where the comments have been addressed on the attached revised plans and reports. GENERAL 1. The King County Site Improvement Bond Quantity Worksheet has been revised to include the sewer and water improvements. There are 18 catch basins as listed in the worksheet — 6 CB Type I, and 12 CB Type IL. Sizes and quantities of storm drain pipe have been revised. STORM DRAINAGE REPORT: Minimum Requirement #1 — Preparation of Stormwater Site Plan 1. Sheet C2 — The name and telephone number of the CECSL have been changed. 2. Sheet C4 — Comment has been addressed. 3. Sheet C4 — Depth of infiltration trench #10 has been revised to 5 feet. 4. Sheet C4 — Depth of infiltration trench #11 has been revised to 5 feet. Minimum Requirement #7 — Flow Control 1. MR #1 comments have been addressed. Minimum Requirement #11 — Financial Liability Engineering Comment #1 has been addressed. Civil Plan Review: r Comments have been addressed. The footing drains, overflow piping and the tightline shall be 4-inch PVC, unless noted otherwise. 9MMENNIMIM Responses to be provided by the Landscape Architect. Thank you for your time and effort in this review. If you have any questions or need additional information, please do not hesitate to call. John Yuen