Loading...
20170217082614.pdfJohns, Kristin From: Tanner Kirchoff <TKirchoff@MAHLUM.com> Sent: Friday, June 24, 2016 10:49 AM To: Fisher, Steve Cc: McConnell, Jeanie; Andy Drissell; Corrie Rosen Subject: RE: Madrona School I Waste, Recycling, Compost Containers Thanks, Steve. I've provided comments to the questions you had below. Have a great weekend! -Tanner Tanner Kirchoff AIA EDAC LEED AP Mahlum I Architects Inc From: Fisher, Steve [mailto:Steve. Fisher@edmondswa.gov] Sent: Friday, June 24, 2016 10:30 AM To: Tanner Kirchoff Cc: McConnell, Jeanie; Andy Drissell; Corrie Rosen Subject: RE: Madrona School I Waste, Recycling, Compost Containers Hi Tanner, Thanks for sending this. I sent it to the Operations Manager at Republic Services and he had the following comments: The 100+ foot back up is fine as well as the turnaround lane — not a problem. There is concern about the extent of the covered play area shown, so perhaps a need to clarify where exactly it occurs down along that fire turnaround lane — will the trucks need to be looking out for any overhead structure while turning around? (not sure what the heavy dashed line on north side of turnaround lane means). The heavy dashed to the north of the orange fire lane is the fire lane location from a previous design scheme —that dashed line does not indicate an overhead structure of any kind. The dashed box at the termination of the orange fire lane indicates the proposed covered play area to the north of the gym. That location is not set at this moment and may change. We will keep in mind to keep covered play or any other structures out of the way of the service vehicles. He noted there was no space for a loading dock shown in the service area — is that by design? At this time we are not planning for a loading dock as it was not requested by food service. However, further confirmation on the layout of the service yard will be verified with the district. Steve Fisher City of Edmonds Public Works cell 206-450-4836 City of Edmonds Public Works work cell 206-450-4836 From: Tanner Kirchoff [TKirchoff@MAHLUM.com] Sent: Friday, March 18, 2016 3:03 PM To: Fisher, Steve Subject: Madrona School I Waste, Recycling, Compost Containers Hi, Steve. I was pointed in your direction for guidance on container sizes for a new K-8 school that Mahlum is designing for the Madrona School. We're very early in the design process but I thought it'd be a good time to correctly size our service yard. Currently I have sized our containers based on Lynnwood Elementary that we recently permitted with the City of Lynwood. Any assistance you could provide would be greatly appreciated. Thanks - have a great weekend. Tanner Tanner Kirchoff AIA EDAC LEED AP Mahlum I Architects Inc (206) 816-1106 d (206) 441-4151 p (206) 441-0478 f 71 Columbia, Floor 4 1 Seattle, Washington 98104 WVt""W I Y arukedIn 1 ^ktca ur I VhTieo