Loading...
20170307_Resub_ResponseLetter.pdfStud'OMENG STRAZZARA ARCHITECTURE PLAIIIN:NG C..� �ULT NG March 6, 2017 Kernen Lien Senior Planner City of Edmonds — Planning Division 1215 th Avenue North Edmonds, WA 98020 Kernen. Lien @ed mondswa.gov RECEIVED 03/07/2017 Development Services Ctr. City of Edmonds RE: Letter of Completeness and Request for Additional Information Westgate Village Mixed Use Building Augmented Design Review Application PLN20160054 Below, you will find our responses to your review of February 22, 2016. The original subject text of each correction has been included verbatim with any omissions clearly noted. Our responses are included in bold italics. Plannina Division Comments: I . SEPA Checklist: Addressed. 2. Plan Consistency: Addressed. 3. Setbacks: Addressed. 4. Massing and Articulation: Addressed. 5. Amenity Space: a. Not addressed. In addition to the spatial requirements of amenity spaces (a minimum 15% of the project area) amenity spaces must also meet certain requirements for how they are structured. ECDC 22.110.070.C.2 and C.3. Specifically, amenity spaces shall provide a minimum of 20 percent planted pervious surface area (such as a rain garden, bioswale, turf, groundcover, soil or mulch). The remaining balance may be any paved surface with a maximum 30 percent impervious paved surface. The area of provided amenity space is identified; however, it cannot be determined what percentage of the amenity area is planted pervious surface and what percentage is impervious. Please clearly identify on the TEL 206 587 3797 FAX 206 587 0588 2001 WESTERN AVE, SUITE 200 SEATTLE, WA, USA 98121 www.studioms.com 3/6/17 Response #2 Permit# PLN20160054 Westgate Village, Edmonds, WA plans how the amenity area complies with the requirements of ECDC 22.110.070.C.2 and 3. February 21, 2017 Comment: There is still not enough information to determine compliance with ECDC 22.110.070.C.2 and C.3. Please identify the square footage of amenity space that is planted pervious surface area and the square footage that is paved with impervious materials. Response: TRA response, Plan and calculations have been provided to illustrate the difference between plants and paving and delineate the required percentages. b. Pursuant to ECDC 22.110.070.C, sidewalks do not count toward the amenity space requirement. Addressed. 6. Public Space - Sustainability: Addressed. 7. Height Bonus: In orderto be eligible forthe height bonus allowed by ECDC 22.110.090, a project must score at least eight points on the Height Bonus Score Sheet. The application material indicates the project would score a total of nine points and be eligible for the height bonus. Some elements are verifiable from reviewing the plans such as the amount of amenity space, but other elements cannot be determined. a. Green Building Program will be added as a condition of approval. Once design review has been approved, the architect will have to submit documentation that the building has been designed to meet LEED Silver/Built Green 4-5 Rating as noted on the scoresheet. b. Green Factor score will be added as a condition of approval. Once design review has been approved, in accordance with ECDC 22.110.070.B.2 the landscape architect will have to submit the scoresheet with the project plans, certifying that the plan meets or exceeds the minimum green factor score and other requirements for the property. c. See comments in Item 5 above regarding amenity space. d. The claimed Miscellaneous Points cannot be determined from the application materials. Please provide the following information so these criteria can be evaluated: 1. Response letter noted car share parking will not be utilized. Identifythe Car -Share Parking areas on the plans (minimum 2 spaces). 11. Addressed. Identify the parking spaces and charging facilities for electric cars (minimum 4 spaces).. 111. Addressed. Identify the bicycle storage and indoor changing facilities on the plans. -2- 3/6/17 Response #2 Permit# PLN20160054 Westgate Village, Edmonds, WA 1v. Partially Addressed. Provide a description on how public art will be integrated into the provided amenity spaces. February 21, 2017 Comment: A public art area was identified in the amenity space area, however no description was provided on how public art will be integrated in the provided amenity spaces. Please provide a narrative description on how public art will be integrated into the amenity spaces. Response: The ownership group has started preliminary discussions with the Edmonds Art's commission to collaborate on a public -private venture that would create a rotating art display in the exterior amenity area. The art would be acquired by the ownership via purchasing andlor leasing pieces created by local artist and artisans. As this collaboration is in its nascent stages of development details will evolve as the discussions continue. In concept we propose the construction of a concrete pedestal located in the center of the public amenity area. This pedestal will provide the displayfor local artists work. Final details will continue to evolve as discussions mature. 8. Stormwater Facilities: Not addressed. The design guidelines for the Westgate Mixed Use zone contain many references to incorporating low impact development stormwater techniques into the overall design of the project (ECDC 22.110.000, 22.110.030, 22.110.050.C.2, 22.110.070, and 22.110.080). While permeable concrete is shown on some of the parking spaces, the no rain gardens, bioswales or other stormwater technique referenced in ECDC 22.110 have been addressed. Please provide information and identify on the plans how the stormwater requirements ofECDC 22.110 and ECDC 18.30 will be met. February 21, 2017 Comment: The resubmittal response letter notes the storm drainage and calculations will address these issues. However, no preliminary storm drainage report has been submitted. These items are key design elements for development within the Westgate Mixed Use zone which need to be addressed during design review of the proposal. Response: A preliminary storm drainage report has been provided to address stormwater design. The drainage report reflects the stormwater requirements identified in the Stormwater Management Manualfor Western Washington (2014 amendment) and Edmonds City Code Chapter 18.30. 9. Lot Line Adjustment: Please note that a lot line adjustment will be required condition since the amenity space and open space values are calculated on a project area of 48,980 square feet, which does not match the current parcel layout. February 21, 2017 Comment: As noted in recent conversations, the project area is -3- 3/6/17 Response#2 Permit# PLN20160054 Westgate Village, Edmonds, WA going to be adjusted to include more of the site which will impact the amount of amenity space and open space required. In addition to the lot line adjustment, covenants must be recorded to ensure that areas left out of the amenity and open space calculations for the current phase are included in future phases of redevelopment. Response: The lot line adjustment has been updated as discussed and agreed to during the review cycle meetings between the design team and city reviewers. The site boundary line has been increasedfrom 48,980 sf to 56,407 sf. The open space provided has correspondingly been increasedfrom 7,347 sf to 8,419 sf. Noted the ownership group understands that a covenant will need to be recorded to ensure that areas left out of the amenity and open calculations in the current phase are included in future phases. 10. Parking Agreement: Given that all of the required parking stalls will not be located on the subject property after a lot line adjustment, a parking agreement must be recorded to ensure parking requirements are met. Please note this will be included as a required condition. Response: Noted the ownership group understands that the lot line adjustment will require a parking agreement as part of the approval process. 11. Geotechnical Report: February 21, 2017 Comment - The geotechnical report submittal with the initial application does not address the criteria for geologically hazardous areas in ECDC 23.80. Please submit a revised geotechnical report to be consistent with ECDC 23.80.050 and address the criteria in ECDC 23.80.060 and ECDC 23.80.070. Response: Pan Geo has created an updated memo to their originally provided geotechnical report that addresses the criteria for geologically hazardous areas. See attached. -4- 3/6/17 Response #2 Permit# PLN20160054 Westgate Village, Edmonds, WA Enfzineering Division Comments: 1. Not addressed. The response letter states this requirement is "understood" and "detailed storm drainage plans & calculations will be provided with the building permit drawings"; however, a storm drainage report is required at this time to confirm project feasibility. A preliminary storm drainage report and plan shall be submitted to the City to confirm project feasibility. A preliminary storm drainage report and plan shall be submitted to the City to confirm project feasibility. a. Stormwater management system(s) shall be shown with invert elevations at facilities and connection to City stormsystem. b. For those areas where permeable pavement, bio-retention, or other LID technique is provided as a means of meeting stormwater management requirements, infiltration rates shall be provided consistent with City of Edmonds requirements. Refer to Handout E72B & E72D for additional information. Response: A preliminary storm drainage report has been provided to address stormwater design. The drainage report reflects the stormwater requirements identified in the Stormwater Management Manualfor Western Washington (2014 amendment) and Edmonds City Code Chapter 18.30. Invert elevations have been provided, and preliminary infiltration rates have been assumed based on grain size analysis. Testing for infiltration rates shall be performed as required for final design. 2. Response letter states "conveyance into planted areas will be achieved where feasible". This does not entirely address this comment. Clearly show on the plans which low impact development features are being provided to meet both WMU zone requirements and stormwater management requirements and which features are being provided to only meet one or the other. Low Impact Development: ECDC 22.110 WMU Design Standards requires sustainable site design, including low -impact storm water treatment systems. As such, the following applies to the project and shall clearly be shown on the plans: a. Pervious surfaces shall be integrated into site design and may include: pervious pavement, pervious pavers and vegetated roofs. Capture and reuse strategies including the use of rainwater harvesting cisterns may be substituted for the effective area of pervious surface required. b. Runoff generated on site shall be routed through a treatment system such as a structured storm water planter, bioswale, rain garden, pervious pavement, or -5- 3/6/17 Response #2 Permit# PLN20160054 Westgate Village, Edmonds, WA cisterns. (Please note, where pervious pavement is provided as a means of also meeting stormwater management requirements, flows from other adjacent areas shall not be directed to these permeable pavement systems). c. Stormwater runoff from sidewalks should be conveyed to planted parkways or landscaped rain gardens. Overflow from parkways and runoff from the roadways should be directed into bioswales and/or pervious paving in curbside parking areas, along the street edges where it can infiltrate into the ground. Perforated curbs through which street water runoff can flow to open vegetated swales may also be provided, where feasible. (Please note, where pervious pavement is provided as a means of also meeting stormwater management requirements, flows from other adjacent areas shall not be directed to these permeable pavement systems). Response: A preliminary storm drainage report has been provided to address stormwater design. The drainage report reflects the stormwater requirements identified in the Stormwater Management Manualfor Western Washington (2014 amendment) and Edmonds City Code Chapter 18.30. Per the Direct Discharge requirement identifiedfor projects discharging to the municipal stormwater system in Edmonds Way, LID elements are not required to be addressedfor stormwater design. However, bioretention and permeable pavement have been incorporated in order to meet the intent of the Westgate Mixed Use zone. 3. As discussed, frontage improvements will not be required along Edmonds Way to the intersection. The current submittal accurately reflects the frontage improvement limits. Thank you. As noted during the pre -application meeting on 9/1/2016, the frontage improvements shall extend along the entire SR-1 04/Edmonds Way property frontage. Driveway access points shall be consolidated and the eastern approach shall be removed consistent with WMU zone requirements and access management plan (shown below). 3/6/17 Response#2 Permit# PLN20160054 Westgate Village, Edmonds, WA 0 0 0 0 0 0"*.".*. t 0 0 0 0 0 0 00000, 0 0 0000 0 0 0 0 0 0 0 0 4. Addressed. Along a portion of Edmonds Way, the proposal shows the required 5-foot wide landscape buffer (between street and sidewalk), as well as an 8-foot wide sidewalk. In providing these required improvements, it appears as though a portion of the sidewalk will be located on private property. Clearly show or annotate the intent to either dedicate additional right-of-way to the City or provide a public pedestrian easement. a. Please note, within the general area of the intersection of 1001h St SW and SR-104, the planting buffer may be reduced or excluded, provided that the sidewalk is greater than 8-feet in width. 5. Not addressed. Please clearly show the limits of the maximum 24-foot wide drive aisle. An internal circulation drive has been provided through the site. As perpendicular parking exists along one side of the drive and is proposed along the other, the travel lanes shall be 24-feet in width. The goal established within WIVIU zone is to reduce impervious surface areas and therefore, the 24-foot width is also a maximum. Sidewalk areas that flow through the site shall be a minimum of 6-feet in width. Please provide a cross section that confirms these design dimensions. Response: The limits of the drive aisle have been adjusted per discussion with Jeanie McConnell and Kernen Lien on 311117. See updated plan. 7- 3/6/17 Response #2 Permit# PLN20160054 Westgate Village, Edmonds, WA 6. Addressed. Plans indicate Compact parking stalls to the east of Amenity Area 1. Provide stall dimensions to confirm minimum dimensions of 8-feet x 16.5 feet. 7. Response letter states contact will be made with Olympic View to obtain their requirements and determine the feasibility of the project. Please provide confinnation that they are aware of the proposed project and have found it to be feasible. Water and sewer utilities fall under the purview of the Olympic View Water & Sewer District. Please provide confirmation that OVWSD has been made aware of the proposed project and that the proposal is found to be feasible from their perspective. Response: Olympic View Water and Sewer District is aware of the project, and has provided fire flows in the area for reference and use in water system design. Anin- person meeting with the District is scheduled for 317 to discuss the project. Thank you. Chris Davidson, AIA Director Studio Meng Strazzara