20170321080643.pdf3/113/2047
ASME Heater I Commercial Pool Heaters - Hayward Pool Product�
Q HAYWARD-
Specs Parts
Select 2-4 items to Compare
Compare
Ctn. City. 1
Ctn. Weight240 lbs.
HEATER-UNIVERSAL 500 ASME NA LONX
Item # H500FDNASME
Product Description
Hayward Commercial Pool's Universal H-Series ASME gas heaters are designed
and certified for commercial use. The flagship ofour H-Series line encompasses
high -end features and construction materials as standard. They combine industry -
leading hydraulics, exceptional performance, energy efficiency and reliability, with
planet -friendly low-NOx emissions. Flexible connection options make them ideal for
new or existing applications. Choose from 250,000, and 400,000, and 500,00 BTU
natural gas or propane models.
• Patented Cupro Nickle Finn Plate� heat exchanger with bronze header as
standard
• Independent left or right side electric, water and gas connections
• 2in x 2 1/2in CPVC flanged connections
• ASME pressure relief valve included as standard
• Electronic lock -out feature prevents unauthorized access to configuration settings
• Easy installation and service via access of single front panel
• Easy gas valve adjustment
• Easy dual voltage conversion with fuse -protected circuit boards
• Texas Heater Kits Available
• 500,00 BTU provides unprecedented speak to heat, with just 2 models delivering
1 million BTU's while using minimal pump room space
• New Warranty - 3 Years Parts and Labor
Click the link below to find your manufacturer's data report
C> Data Reports
( . - 141TYCOPY
Ir"ECEIVED
ra,
t
MAR �_ 0 2e17
DEVELOPMENT SERVICES
COUNTER
13LD9�0 (1 0 3_71
http://www.hayward-pool.com/shop/ProductDisplay?urlRequestType=Base&catalogld=l0055&categoryld=40OT79&productld=4146123&urILangld=-I&Iangld=-1 ... 1/1
2638560 FORM HLW-6 MANUFACTURER'S DATA REPORT FOR Page 1 of 2
Work Order # WATER HEATERS OR STORAGE TANKS
As Required by the Provisions of the ASIME Code Rules
1. Manufactured and certified by Hayward Industries, Inc., 2935 Sidco Drive, Nashville, Tennessee, 37204
(name and address of manufacturer)
2. Manufactured for Stock
3. Location of Installation Stock (name and address)
21131603106652001 to
4. Identification 21131603106681001 N/A 2902586801 Rev M 3795-3824 2016
(manufacturer's serial no.) (CRN) (drawing no.) (National Board no.) (year built)
5. The chemical and physical properties of all parts meet the requirements of material specifications of the ASME BOILER AND PRESSURE VESSEL
CODE. The design, construction, and workmanship conform to Part HLW, Section IV 2013 N/A 2768
(year) (adden-da�(iis-a--p-pli—ca'15 �edate (Code Case no.)
6. Shell 1 SB-584 (C90300)
.300
None 2.88" ID
0' 14.96"
(no.) (material spec., gr.)
ithickness)
(lining) (diameter)
[length(overall)]
7. Joints Seamless "Casting"
80%
Seamless "Casting"
I
[long. (seamless, welded)]
leff. (compared to seamless)]
[girth (seamless, welded)]
(no. of shell courses)
8 Heads
Flat
Location
Material Spec., Gr., Thickness
Crown Radius
Knuckle Radius
Elliptical Ratio
I
j Flat Diameter
(cSide Press
oncave,convex)
END
SB-584 (C90300) .250"
N/A
1
1 4.75"
9. Tubesheet SA-240 T304 Tubes 4 .750 in
(material spec., gr.) (no. (size)
10 Nn771P';- insnertion. and safetv valve oDeninas:
5' 8.717" SB-543 (C70600) .049 in Both
[length(overall)] (marl spec., gr.) (thickness) (rolled or welded)
Purpose (inlet, outlet, drain, etc.)
No.
Diameter or
Size
Type
How Attached
Material
Nominal
Thickness
Reinforcement Material
Location
Handhole
N/A
NIA
—
NIA
Inlet/Outlet Port
2
2.40
Flanged
Cast
SB584/C90300
.300
Shell
Drain Valve Port
1
3/4"NPT
Female Thrd
Machined
Third Opening
Shell
Pressure Relief Valve
1
1314"NPT
Female Thrd
Machined
Thrd Openingl
Shell
Temp Sensor Ports
2
1/4"NPT
Female Thrd
Machined
Third Openingi
Third Openlng�
—A ^ --- :--i
Shell
Pressure Sensor Port
1
1/8"NPT
Female Third
ERiE
Machined
Shell
!�A
Thermistor Temp Sensor Pori
I
3/8"NPT
Female Thrid
Machined
Shell
11. MAWP 125 psi Max. input 500,000 BTU Max. temp. 140 *F Hydrostatic test Isil psi
12. Manufacturers Partial Data Reports properly identified and signed by Commissioned Inspectors have been furnished for the following items for this report
N/A (name of part, item no., manufacturer's name, identification stamps)
AD
13. Remarks
Cast header is also called the shell as refered to in section 6.7. and 10 above.
3/4" and below Ports are drilled and tapped openings in shell casting.
PKEY 2500302 exe: v6.2.98 HLW6-8 NB-30 Rev 8
HLW-6 (BACK) Page 2 of 2
Manufactured by Hayward Industries, Inc., 2935 Sldco Drive, Nashville, Tennessee, 37204
Mfr's Serial No. 21131603106652001 to 21131603106681001 National Board No. 3795-3824
CERTIFICATE OF SHOP COMPLIANCE
We certify that the statements made in this data report are correct and that all details of design, material, construction, and workmanship of this
water heater or storage tank conform to Section IV of the ASME BOILER AND PRESSURE VESSEL CODE.
"HLW" Certificate of Authorization no. 40380 expiration date 2/16/2017
Date 4/1/2016 Name H In Signed
4a a �d Mries, Inc.
w ur
s c - I Fig ----Ta— —
(manuTacturer that n- 7e a ce7 ried water neater or storage nRT
CERTIFICATE OF SHOP INSPECTION
Constructed by Hayward Industries. Inc. at 2935 Sidco Drive, Nashville, Tennessee, 37204
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by
The Hartford Steam Boiler Inspection and Insurance Company of Connecticut
have inspected parts referred to as data items 6 thru 11
and have examined Manufacturer's Partial Data Report for items
and state that, to the best of my knowledge and belief, the manufacturer has constructed the water heater or storage tank in accordance with
Section IV of the ASME BOILER AND PRESSURE VESSEL CODE.
By signing this certificate, neither this Inspector, nor his employer makes any warranty, expressed or implied, concerning the water heater or
storage tank described in this Manufacturer's Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for
any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 4/4/2016 Signed *A4- x X,�C— Commission 15227A
(Authorized Inspector) (National Board commission number and endorsement)
PKEY 2500302 exe: v6.2.98 HLW6-8 NB-30 Rev 8
U. S. Govemment Federal law prohibits removal of this label before consumer purchase.
EnERGYGUIDE
Pool Heater Hayward Industries, Inc.
Natural or Propane Gas Models H200FD, H250FD
H350FD, H400FD, H500FD
SW20013H, SW25ODH
SW40ODH
Thermal Efficiency
83mO
IT I I
182.0 95.0
Least Efficient Most Efflcient
Efflclency Range of Similar Models
• Efficiency range based only on models fueled by natural gas.
• For more information, visit www.ftc.gov/appliances.
1301705801 REV E
0
COUjVTEa1-RVjCES
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page I of 2
Service Water Heating Permit Plans Checklist SWH-CHK
on! 9 W_hi� t . Q+�+. 1Z..— rM. r— fi— Pnrmc fnr r-mmomini Rijildinns ine-Andinn R9 P. R3 over 3 stories and all R1 Revised January 2017
__FProject Title: Replace pool heaters Date 3/17/2017
The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the
Washington State Energy Code, Commercial Provisions.
Applicable
I
Code Section
Code Provision
I I
Information Required - Must be in permit documents
I
Location in
Documents
Building Department
_�Lotes
_(y2s,no,na)
Equipment - Sizing, Performance and Type
SWH equipment type and
Provide equipment schedule on plans indicating type and capacity; indicate efficiency complies
C404.2
I efficiency
with required federal standard
For individual SWH equipment serving an entire building with �: 1,000,000 Btu/h capacity.
indicate thermal efficiency �� 90%; or exception taken
High input -rated SWH
For buildings with aggregate capacity of all SHW equipment �� 1,000,000 Btu/h (exclude <
C404.21
100.000 Btu/h equipment from threshold calculation), indicate average capacity weighted
systems
thermal efficiency a 90%; or exception taken
If applying Exception 1 for site -solar or site -recovered energy, provide calculations and source
—of
annual service water heating energy use estimate
C404.4
Heat traps
I Indicate piping connected to equipment have heat traps on supply and discharge
Insulation under electric
For electric water heaters located in unconditioned spaces or on concrete floor., indicate R-10�
C404.5
Iwater heater
linsulation under equipment
Piping Systems
Indicate thickness of piping insulation on plans per Table C403 2 9; verify insulation is provided
C404.6
Insulation of piping
.. from the water heater to the final fixture in a line, from the inlet / outlet piping at water heater
to heat trap (up to 8 feet), and on piping that is heat traced; note exceptions taken
Indicate method of compliance on plans for all piping runs connecting service hot water source
C404.3
Efficient SWH supply piping
to hot water fixture (maximum pipe length or maximum pipe volume method per Table
F404.3. 1); provide calculations for all piping runs documenting the total length and / or volume
Service Water Heating System Controls
For circulation systems with dedicated return piping, indicate controls are configured to
automatically start pump based on demand for hot water and shut-off pump when there is no
demand and when the desired water temperature is met
C404.7.1
C404.8
Heated -water circulating
systems
For circulation systems with cold water supply piping serving as the return, indicate controls
are configured to automatically start pump based on demand for hot water and shut-off pump
when there is no demand, or when temperature of water entering the cold water supply pipe is
2� 104'F
For heat trace systems provided to maintain temperature of service hot water in piping,
C404.7.2
Heat trace system controls
indicate controls are configured to de -energize system when there is no demand for hot water
and when the desired water temperature is met
Controls for hot water
For systems with separate water heater and storage tank, indicate controls are configured to
C404.7.3
storage
limit operation time of pump after end of heating cycle to:5 5 minutes
For SWH. pool / spa and pressure boosting pump motors gt 7.5 hp, indicate method of variable
flow control (VSD or equivalent method that requires � 30% design wattage at 50% design
C403.2.13
Variable flow control -
fluid flow); note exception taken
C403.4�2.7
pumps
Identify basis of pump speed control (differential or static pressure setpoint, pressure, zone
I
load demand, etc)
Pools and ermanent Spas - Equipment and Controls (Sections are under C404.11)
Provide equipment schedule on plans indicating type and capacity for all pool heating
Yes
C404.10.1
'Pool heating equipment
equipment; indicate efficiency complies with required federal standard; for heat pump water
Energy
efficiency
heaters indicate COP � 4
guide
No
C403.2.13
Variable flow control -
Refer to Service Water Heating System Controls
pumps
C404 - 101
Indicate automatic on / off control based on scheduling and readily accessible on / off switch
Yes
C404.10.2
Pool heater on / off controls
on heater that operates independent of thermostat setting; note exceptions taken
Front Panel
For all pools and in -ground permanent spas, indicate a vapor retardant cover on plans
NA
C404.10.3
Pool covers
For all pools and in -ground spas heated to > 90'F, indicate cover shall include insulation �: R-
12
For all pools and in -ground spas heated to > 90*F, Indicate on plans that sides and bottom are
NA
C404.10.3
Pool assembly insulation
provided with insulation ? R-1 2
C404.12
Energy consumption of
Indicate portable spa complies with Association of Pool and Spa Professionals APSP-14
I
portable spas
C-TI
RECE11VED
kQ' 2`0 2,217
DEVELOPMENT SERVICES
COUNTER
9n1 R 1A1nQhinnMn Rtntp Pnp.mv rndp Comnliance Forms for Commercial. R2 and R3 over 3 stories and all R1 - Pane 2 of 2
Energy Recovery (ER) Systems - Service Water Heating and Pool Systems
For buildings with pools or permanent spas with water surface area > 200 sf, indicate exhaust
C404.10 4
Pools and permanent spas
air ER method and use of waste heat (preheat ventilation air, pool water or service hot water);
(Section
under
exhaust systems
or exception taken
C404.1 1)
(energy recovery)
Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air
temperature at design conditions by a 36oF
For buildings with food service, meat or deli departments that have �: 500,000 Btu/h of remote
refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat
C403.5.3
Energy recovery -
service water
cooler / freezer condensers
For buildings with �� 40,000 sf conditioned floor area and with �: 1,000,000 Btulh of remote
refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat
service water
For buildings with 24-hour operation and > 1,500,000 Btu/h of heat rejection capacity and
Energy recovery -
design SWH load > 250,000 Btuth, indicate condenser ER to pre -heat service water; or
C403.5.4
condenser systems
exception taken. Provide calculations showing the amount of recovered heat that is utilized
(60% of peak heat rejection load or pre -heat service water to 85'F).
water heat recovery
For systems incorporating drain water ER, indicate system design complies with CSA B55.2
C404-10 JDrain
units
(or CSA 55.1 for Group R); indicate potable waterside pressure loss at design flow is < 10 psi
Service Water Heating Energy Use Metering
SWH energy usage in
For Group R-2 multi -family buildings with central SWH systems, provide metering of hot water
C404.9
idwelling
units
energy usage per dwelling unit; indicate metering and data reporting method
For new buildings > 50,000 sf and building additions > 25,000 sf, with total SVVH equipment
I
C409.3.2
SWH equipment energy use
capacity ? 50 kW ( �� 170,600 Btu/h), verfly energy use metering of all SWH equipment will be
metering
provided per C409
Additional Efficiency Package Option, Reduced Energy Use In Service Water Heating - Must comply with both provisions to be eligible
To comply with additional efficiency package option, verify that 2: 90% of the conditioned floor
area of the building is one or more of the occupancies identified in this section, OR:
C406 7 1
Eligible building type
:Provide whole building energy analysis per C407 that demonstrates the SWH load in the
building is � 10% of total building energy loads
To comply with additional efficiency package option, provide documentation that verifies
,2: 60% of building annual SWH energy is provided by high efficiency sources (heat pump water
heater with COP �. 3, waste heat recovery. solar water -heating system);
C406.7.2
C403.5.4
Load fraction
For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and
design service hot water load > 250,000 Btu/h (per C403.5 4); provide documentation that
verifies �� 100% of building annual SWH energy is provided by condenser energy recovery or
1 other high efficiency source
Documentation and Specific System Requirements to Supporting Commissioning
Indicate that all SWH equipment and controls for which the WSEC requires control functions
Scope of service water
and / or configuration to perform specific functions are required to be commissioned; +D7
C408.4
heating systems
For buildings where the largest SWH system has ? 200,000 Btu/h total output capacity,
commissioning
indicate that all SWH systems regardless of individual capacity are required to be
commissioned
Indicate that all pool and permanent spa water heating systems regardless of individual
capacity are required to be commissioned;
Scope of pool and
Indicate that energy recovery equipment that heats pool water regardless of capacity is
C408.4.1.3
permanent spa systems
required to be commissioned '
commissioning
Identify all pool heating and energy recovery equipment and controls that the WSEC defines
as being capable of and / or configured to perform specific functions
Indicate in plans and specifications that Cx per C408 is required for all applicable service water
heating systems;
C404.13
Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408 1 2
C408 1 1
Commissioning
including: narrative description of activites, responsibilities of the Cx team, schedule of
C4081.2
requirements in construction
activities including verification of project close out documentation per C103 6, and conflict of
C408.1.4 2
documents
interest plan (if required);
C103.6
Include in general summary that a Cx project report or Compliance Checklist (Figure
C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner
prior to the final mechanical inspection
Functional performance
Identify in plans and specifications the intended operation of all equipment and controls during
C408A 1
testing criteria
all modes of operation, including interfacing between new and existing-to-ren
Project Close Out Documentation
Indicate in plans that project close out documentation and training of building operations
Documentation and project
personnel is required for all SWH components, equipment and systems governed by this
C103.6
close out submittal
code; indicate close out documentation shall include: record documents, O&M manuals,
requirements
applicable WSEC compliance forms and calculations
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1
Mechanical Summary MECH-SUM,
2015 Washington State Energy Code Corr pliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 20171
Project Information
Project Title: Replace pool heaters
Date 3/17/2017
Applicant Information. Provide contact information for individual who can respond to
For Building Dept. Use
inquiries about compliance form information provided.
Company Name: Circa Pacific, Inc.
Company Address: 280 44th Street N.W.
Applicant Name: James Denton
Applicant Phone: 253-867-0303
Project Description
E] New Building [:]Building Addition E]Tenant Improvement System Retrofit E]No System Changes
Briefly describe mechanical systems in
Replace current pool heater with new Hayward 500 pool heaters
the text box provided
[—]Total Bldg Performance (TBP)
This path includes all mandatory
provisions per C401 2 Option 2.
MECH-SUM, MECH-CHK, and C407
Energy Analysis forms required
Load calculation summary E] MECH-LOAD-CALC Form
Design Load Calculations
Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or
ventilating needs. If a load calculation summary is provided with the permit documents that includes a// applicable
compliance information then the MECH-LOAD-CALC form is not required
1:1 Mechanical Plans D MECH-EQ Forms (TBD)
Mechanical Schedules
Indicate location of equipment compliance information If provided on plans then MECH-EQ forms are not required,
however, include on plans all applicable compliance information listed in MECH-EQ tables
[:] DOAS is required per C403 6 effective July 1, 2017 (office, retail, education, library and fire station occupancies)
All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does
not require space conditioning fan operation Space conditioning fans cycled off when no heating or cooling is required.
Dedicated Outdoor Air
El ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, Exception 1)
System Requirements and
ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS (C403 6, Exception
2)
High Efficiency VAV
DOAS included in project, although not required (occupancy not office, retail, education, library or fire station)
Alternate
El DOAS related allowances included in project:
Prescriptive vertical fenestration maximum area allowance increased to 40% per C402 4 1.4 with 100% of
conditioned floor area in building served by DOAS.
Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form
Project includes HVAC air distribution systems that provide heating and/or cooling
Ifyes, provide a MECH-FANSYS -SUM form
Fan Power
For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp
lfyes, provide a separate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold.
Refer to Section C403.2 11 and MECH-FANSYS-DOC for requirements and exceptions
Hydronic chilled water El water -loop heat pump E] No hydronic systems
HVAC Hydronic Systems
El Hydronic heating water El Geothermal
El C406.2 More efficient HVAC equipment and fan systems
Requires 90% ofheating and cooling capacity to be equipment listed in tables C403 2 3(l)-(9) or air -to -water heat
pumps and heat recovery chillers All equipment listed in tables C403.2 3(l)-(7) must be 15% more efficient than
minimum requirements All stand alone supply, retum, and exhaust fans over 1hp must have FEQ � 71 and must be
C406 Additional Efficiency
selected within 10% of maximum total or static pressure
C406 6 Dedicated outdoor air system (DOAS)
Options - Mechanical
Requires 90% of conditioned floor area to be served by a DOAS per C403 6 that delivers required ventilation air in a
manner that does not require space conditioning fan operation
C406.7 Reduced energy in service water heating
Requires 90% of floor area be in occupancy types listed in C406.7. I and that 60% of annual hot water energy use be
provided by heat pump, waste heat recovery or solar water -heating systems. 'yz
MAR '20
*VELOPMEi"IT SERVICES
COUNTER
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1
Mechanical Summary, pg. 2 MECH-SUM
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2017
Equipment Type (s)
[—] Hot water heating tank(s) instantaneous No service water systems
Service Water Heating
El Dedicated boiler F-] Heat exchange from space heat boiler or
Systems
central hot water/steam
Distribution Type (s)
El Circulation System F1 on -demand
Commissioning
Commissioning is required for:
XMechanical systems per C408.2 El service water heating systems per C408.4
If required, commissioning shall be performed for all applicable systems regardless of individual equipment capacity
Exceptions to commissioning requirements:
Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h
cooling or 300.000 13tu/h heating. Mechanical systems commissioning not required
F-1 Capacity of largest service water heating system in building does not exceed 200,000 Btu/h Service water heating
systems commissioning not required.
Low Energy and Semi -Heated Spaces (Note 6 and 7)
Peak Space
Heating
Cooling
Conditioning
Space
Area Served,
Capacity, Btu/h
Capacity, 13tu/h
Capacity,
Compliance
Type_
Location in Plan(s)
Space(s) Served
square feet
(Note 4)
(Note 5)
Btu/h-sf
Check
Notes
Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh
Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btulh. Not allowed for semi -heated spaces. Enter 0 if no cooling.
Note 6 - Refer to Section C402. 1 1 Low Energy Building Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btul?7*Sf
Note 7 - Refer to Section C402. 1 1 1 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 Blulh*sf Only systems without
electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated.