20170328145252.pdfL EASTSIDE CONSULTANTS, INC. ENGINEERS-
www.eastsideconsultants.com SURVEYORS
March 24, 2017 RESUB
Jennifer Lambert MAR 2 4 2017
Review Engineer BUILDING DEPARTMENT
City of Edmonds CrrY OF EDMONDS
6830 NE 185 1h Street
Edmonds, WA 98028
RE: Lanning Single Family Residence — BLD20161719
Dear Ms. Lambert:
Attached are the revised plans per the review comments dated March 14, 2017. The
following is an itemized response to your comments:
SITE PLAN
1) Noted
DRAINAGE AND UTILITY PLAN (Sheet I of 3)
GENERAL
1) The Permit Number was added to the Plans
2) The label for the Deck was added
3) The area for new curb was added
4) The landscape strip was added
5) The note was added to the plans
6) The note was added to the plans
WATER
1) Noted
a) The I " meter was added
b) The water meter was moved to the planter strip
c) The 1-1/2" line was called out
d) The pipe material was added and a note placed for the tracer wire
2) Noted
3) The 10' separation was called out
4) The note was added
5) Noted
1320 N. W. MALL STREET, SUITE B, ISSAQUAH, WASHINGTON 98027 PHONE: (425) 392-5351 FAX. (425) 392-4676
SEWER
1) Noted
2) The note was added
3) A note was added
4) The pipe material and size were added
5) The cleanouts were added
6) The cleanouts were added
7) The elevations were added to the plans
STORM
1) Noted
a) Since the driveway cannot all slope to the front and the lawn is to high grade
wise for a dispersion a trench drain was added at the Front CB. This will act
as a dispersion trench to dissipate the flow across the sidewalk as it bubbles up
from the CB.
b) The CB in the Back is connected to the front CB. See comment above.
c) Splashblocks were added to the downspouts so it can sheet flow out to the
yard, etc. and possibly eventually out to the street.
2) Noted, this was mainly for storage so the pumps don'
STORMWATER REPORT
Background
a) This was added to the Report
b) This was added to the Report
Minimum Requirement #1
1) This was revised per the following comment from above. Since the driveway
cannot all slope to the front and the lawn is to high grade wise for a dispersion
a trench drain was added at the Front CB. This will act as a dispersion trench
to dissipate the flow across the sidewalk as it bubbles up from the CB
Minimum Requirement #2
Noted
Minimum Requirement #3
Noted
Minimum Requirement #4
Noted
Minimum Requirement #5
Noted
Minimum Requirement #7
Noted
Minimum Requirement #8
Noted
Minimum Requirement #9
Noted
Minimum Requirement #11
Noted
DRY UTILITIES
1) The dry utilities were added to the sheets
2) The underground note was added
TESC PLAN (Sheet 2 of 3)
1) The Title was changed
2) A note was added
3) The stockpile location was added
DETAILS (Sheet 3 of 3)
Noted
Please review the drawings. I can be reached at 425-392-5351 if you have any questions.
Sincerely,
EASTSIDE CONSULTANTS, INC.
Ronald S. Frederiksen, PE