Loading...
2017-0333 Kahsay Addition Rev1.pdfOV EDAI 0 DATE January 2, 2018 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: LAUREN VITAL 2812 COLBY AVE EVERETT, WA 98201 PLANS@AMERICANHOMEPLANNERS.COM FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017-0333 Project Address: 23737 76th AVE W Scope: First floor addition. Revision I Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, includint! a written response in itemized letter format indicating where the 'clouded' or otherwise hii!hli2hted chani!es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. Page 6: The proposed steel beam revision does not appear to have structural calculations included with the submittal. Please include two copies of structural calculations. 2. It appears the proposed steel beams are bearing on Paralam posts. The plans do not include connection details to the posts, floor system, upper wall, or lower roof. Please submit connection details for review. Furthermore; if field welding is required, a certified third party inspector will be required. If field welding is required please complete the attached testing agreement. Please let me know if I can be of any further assistance. Sincerely, Eric Carter Page 2 of 2