Loading...
2017-0350 Sherwood Elem protable.pdfOV EDV City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION 'r't. (425) 771-0220 DATE: April 26, 2017 TO: Will Thomsen ThomsenW@edmonds.wednet.edu FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017- 0350 Project Address: 22901 106th AVE W. Scope: Install manufactured structure including foundation, electrical and demo of small playground. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatin where the 'clouded' or otherwise hil!hlil!hted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: Plans submitted for the structure do not appear to comply with current applicable codes and city standards. Per 19.60.005 of the Edmonds Community Development Code all buildings or structures moved into or within the city shall comply with the provisions of this code including the current adopted codes. Please either (A) resubmit all A, E and M sheets of those previously reviewed and approved by L and I with current applicable code compliance including stamped by the Engineer of Record; or (B) provide a letter signed by the Engineer of Record referencing that this proposed factory assembled structure meets the structural provisions of the IBC, and proposed location. 2. Please describe in detail to what extent and methods will the proposed structure be disassembled for transport. Do you intend to disassemble at the marriage lines? This wi I I help us determine the type of inspections that will need to be performed, and if further regulation and oversight of the transport process will be necessary. Page 2 of 2