Loading...
2017-0398 Jones SFR (Houston).pdfOV EDAf > St. I DATE: TO: FROM: RE: Citv of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 May 1, 2017 Lawerence Houston lawerencehouston&comcast.net Eric Carter, Plans Examiner Plan Check: BLD2017-0398 Project Address: 20902 HillCrest PL Scope: Remodel / New Single Family Dwelling — R-3/U occupancy group — V-B construction— mechanical and plumbing included Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatin where the 'clouded' or otherwise hil!hlil!hted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: Sheet A 0.0: Energy Notes: a. Item 2 references a climate zone of "I". Snohomish County is referenced as 4C. Please change on the plans. b. Item 6, details whole house ventilation per section M1508.4 of the IRC. Whole house ventilation requirements are specified in section M1507.3 of the 2015 IRC. With a ventilation rate of 50CFM for a total of 8 hours a day, your ventilation requirements are not being met for a home of this size. Please change on the plans to comply with table 1507.3.3(l) or 1507.3.3(2) c. Item 9 specifies using energy credit 5b. Credit 5b only allows for I credit. A home of this size requires a minimum of 3.5 credits. Please indicate on the plans the additional credits per table 406.2 of the Washington State Energy code that will be used. If high efficiency heating and cooling appliances are opted, please indicate on the plans their location and ratings. TABLE M1507.3.3(l) CONTINUOUS WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM AIRFLOW RATE REQUIREMENTS DWELLING UNIT NUMBER OF BEDROOMS FLOOR AREA 0-1 __F_2 — 3 1 4-5 1 6-7 1 > 7 (square feet) Airflow In CFM < 1,500 30 45 60 75 90 1,501 — 3,000 45 60 75 90 105 3,001 — 4,500 60 75 90 105 120 4,501 —6,000 75 90 105 120 135 6,001 — 7,500 90 105 120 135 150 > 7,500 105 120 135 150 165 For SI: I square foot = 0.0929 m', I cubic foot per minute = 0.0004719 m/s. TABLE M1507.3.3(2) INTERMITTENT WHOLE -HOUSE MECHANICAL VENTILATION RATE FACTORS6.b RUN-TIME PERCENTAGE IN EACH 4-HOUR SEGMENT 25% 33% 50% 66% 75% 100% Factor' 4 3 2 1.5 1.3 1.0 a. For ventilation system run time values between those given, the factors are permitted to be determined by interpolation. b. Extrapolation beyond the table is prohibited. Sheet S2.0 1. References to plan notes are indicated. Page numbers are not associated with these notes. Please indicate on the plans the applicable page in which these notes reference. 2. The foundation plan appears to indicate pier footing sizes but does not reference which plan page to reference for details. Please add page reference to plans. 3. Beam callouts on the "upper floor and low roof' framing plan do not reference size or have indications to reference S3.4. Indicate on the plans the beam sizes or add reference of where to find the sizing. Please be aware, upon review of your resubmitted information, additional comments may be generated. Page 2 of 3 Page 3 of 3