Loading...
20170405120418.pdf4113 B58 PRE -APPLICATION MEETING SUBMITTAL REQUIRMENTS i TING & DEVELOPNIC: 121 5th Avenue N P�_425.771.�'220 OPTION 1 0 FORMAL PRE -APPLICATION MEETING (SEE BACK PAGE) $1,000.00 (1/2 will be applied toward the future permit submittal) Staff from the Building, Planning, Engineering and Fire Departments attend the meeting, provide written comments and answer questions regarding the proposed project. This meeting is encouraged for major projects prior to a formal application submittal to the City. The goal is to identify MAJOR issues and discuss processing procedures applicable to the project. Submit 1 set of plans with required information per page 2. NOTE: PRE-APP Meetings are scheduled for the next available date with a minimum of two weeks lead time & DRC Meetings a minimum of one week. OPTION 2 DEVELOPMENT REVIEW COMMITTEE MEETING Complementary, informal meeting This is an informal opportunity to meet with staff and discuss your preliminary ideas and concepts for a project. The intent is to help identify the major code requirements that will need to be addressed and any significant site development issues that may relate to the project. The intent is for this to occur prior to considerable investment in plans and/or design work. You may wish to have your design professional(s) accompany you. Submit I set of the following: 1 ) Site Plan 2) Vicinity Map 3) This completed form 4) Pertinent background information 5) Floor plans if applicable 6) List of questions regarding your proposed project COMPLETE ALL REQUESTED INFORMATION Property Owner: Applicant/Conta F_�� d>F :� \J E i\J I EL b r= ri Mailing Address: 9-2-1 Pit-JE 6mejE-:-r Mailing Address: 15 1 10 N1 C 1-7�7-V' ACV- I q L+ City: eo"OtJ105 State: _7��'IBC)20 Zip: C O'MUI'Er State- Zip: li,13672- Phone: Fax: Phone: �.06-947-29_2!�� Fax: 425"48-2-2-13). �Sq%-q-qGI­5Sq'j Email: L36-rilo ?_6-t41Ay41?V1J 1124NAAL, C_6" Email: 1,'�e ip rAietowo6 Dt-_-%irLoaqarr Zoning: 1?8 Lot Size: 2to, 1&2 Sno County Tax Account Parcel#: 27032GO6105-6 Site Address(s): C1 2-1 Pi rA E Existing Use/Occupancy: Pre -Submittal for: F] Building Permit Only 91-and Use Approval/ Permit Description of Project: C— PA,�-2C_C-L 1'�-.> SQILDI"!�3 L_t�rr!!5> \�� WH ll-�06E C)IIJ C-f)M t-At-_A.3 IPV-(,% jr� 1- WLA— r<_)E�9L,N_7T_ IrD 1SIL-01-15, ;1 ipcmc)L46,�4 1,4�u�,E,_ Revised on 0110412017 Page I of 2 Vicinity Map - 921 Pine Street 'R* City of Edmonds P �J. v: x § OT jo e, V. 7 44, KI 0 4: rib nil V 16 A :IklD A. C-* 7 N! IF V 7. V 5, 14 10 188.08 376.2 Feet This map is a user generated static output from an Internet mapping site and is f reference only. Data layers that appear on this map may or may not be accural 'GS 1984 Web Mercator_Auxiliary—Sphere current, or otherwise reliab City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTIC � Legend I Notes AND VOL 33 P. 216) 4.76 CEDAR STREET ui Of. 1 2 4 co 'I'M N "0 REBAR W/CAP 0) F- SET 1/2 CITY OF EDMONDS SP No. SP 81-101 No. 28409 ON B-29-06 FENCE )S 1.0' W & 1.9' N 1/2" REBAR W/CAP 9760 SET ON 5-8-97 10 S81*52'27"E !9 L00, TO-3r-- 0 tol -- -, 79.03' 20' Z vi 5' SANITARY AND/OR STORM SEWER w EASEMENT. REC. No, 1610488 .0 6 0 7 t-3. z L ----------- 6 DECK HOUSE ' 1 1 3. A < No. 921 CARP RT ' -06 0 0 N US'3 0 in Ici Of 5,9 3. 7. r_ z n ol --------- d 0 C) C-4 to C 01� F C, S END OF 6' F E N C E 1/2" REBAR W/CAP 9760 C" IS 1. 7' W OF LINE SET ON 5-8-97 30' OLD LOT LINE- 20' V) NEW LOT LI\N FOUND OLD 3/4"0 IRON PIPE 9.0 99.04* 719.03- 79.03� --r DOWN 0.9', IS 1.1' N X 0.5' W NT CN 6' SLOPE EASEME REC. No. 2234476 C14 FOUND CONCRETE MONUMENT - - - - - - - - - W/1 7/8"0 BRASS DOME SW CORNER NW 1/4, NE STREET (216th ST. SW.) 370.17' NE 1/4. FOUND BRASS r� SURFACE MONUMENT ON 5-1-97, TYP. SET 1/2"0 REBAR W/C\AP. No. 28409 ON 8-29-06 S, LINE NW 1/4, NE 1/4, SECT10N 25-27-3 A - J.X N- Questions for Development Review Committee RE: Proposed Short Plat at 921 Pine Street 1. What are the City of Edmonds mitigation or impact fees that may be charged to this project? 2. What is the depth of the existing side sewer that serves the house on the property? 3. Can the homes on the three proposed lots be served by the existing side sewer or is a new sewer main tap required? 4. Is the proposed short plat lot layout consistent with the City of Edmonds dimensional standards? 5. What are the public right-of-way improvements that may be required as a part of the proposed short plat? 6. Does the "Critical Area" designation on the property refer only to the cut bank and the 6-foot slope easement easement behind the sidewalks on 9` Avenue and Pine Street? 7. May any trees on the site be removed to accommodate the preferred location of the houses within the setback delineations on the Site Plan? 8. What is the preferred method of on -site storm drainage retention for each building lot? _3 t418 ("rj� / OZI N v - L -319 2) ar-;7 - S N I�i Ll l6b