2017-04-10 Magic Toyota Edmonds_Permit Set - plumb.pdfA
AI%COMPRESSED AIR
ABS
AC YLONITRITE BUTADIENE STYRENE
ABV
ABOVE
AC
AIR COMPRESSOR
AD
ACCESS D00%AREA DRAIN/AIR DRYER
ADD/ADD'L
ADDITION ADDI IONAL
I
ADJ
ADJACEN�,/ADJUST/ADJUSTABLE/ADJUSTMENT
AFF
ABOVE FINISHED FLOOR
AFG
ABOVE FINISHED GRADE
AP
ACCESS PANEL
ARCH
ARCHITECT
ASME
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ATM
ATMOSPH ERE/ATMOSPH ERIC
BHP
BRAKE HORSEPOWER/BOILER HORSEPOWER
BLDG
BUILDING
BOP
BOTTOM OF PIPE
BOT
BOTTOM
BS
BLACK STEEL
BTU
BRITISH THERMAL UNIT
BTUH
BRITISH THERMAL UNITS PER HOUR
COND
CONDENSATE
CA
COMPRESSED AIR
C TO C
CENTER TO CENTER
CAP
CAPACITY/END CAP
CB
CATCH BASIN
CENT
CENTRIFUGE/CENTRIFUGAL
CFF
CAP FOR FUTURE
CFM
CUBIC FEET PER MINUTE
CI
CAST IRON
CLG
CEILING
CMU
CONCRETE MASONRY UNIT
CO
CLEANOUT�COMPANVCARBON MONOXIDE
CO2
CARBON IOXIDE
COL
COLUMN
CONC
CONCRETE
COND
CONDENSATE
CONN
CONNE&CONNECTEDYCONNECTION
CONT
t A
CONTINU US/CONTIN ATION
CONTR
CONTRACTOR
COORD
COORDINATE
CPVC
CHLORINATED POLYVINYL CHLORIDE
CT
COOLING TOWER
CU
CUBIC/COPPER CONDENSING UNIT
CW
DOMESTIC COY WATER
DCVA
DOUBLE CHECK VALVE ASSEMBLY
DDC
DIRECT DIGITAL CONTROL
DEG
DEGREE/DEGREES
DI
DEIONIZED WATER
DIA
DIAMETER
DIFF
DIFFERENTIAL/DIFFERENCE/DELTA
DISCH
DISCHARGE
DN
DOWN
DOM
DOMESTIC
DR
DRAIN
DS
DOWNSPOUT
DWG
DRAWING
DWV
DRAIN, WASTE AND VENT
EA
EACH
EFF
EFFICIENCY
EL
ELEVATION
ELEC�ELECT
ELECTRICAL/ELECTRIC
EMER
EMERGENCY
ENT
ENTERING
EQUIP
EQUIPMENT
ERW
ELECTRIC RESISTANCE WELDED
ES
EMERGENCY SHOWER
ET
EXPANSION TANK
EWC
ELECTRIC WATER COOLER(I
EVAPORATIVE WATER COO ER
EWT
ENTERING WATER TEMPERATURE
EXIST
EXISTING
EXP
EXPANSION EXPOSED/EXPLOSION PROOF
EXT
EXTERNAL EXTERIOR
F
FAHRE H IT FEED/FILTER
FA
FACE FIRE ALARM
FCO
FLOOR C%LN OUT
FD
FLOOR DRAIN
FDN
FOUNDATION
FF
FINISH FLOOR
FFD
FUNNEL FLOOR DRAIN
FIC
FURNISHED AND INSTALLED BY CONTRACTOR
FIO
FURNISHED AND INSTALLED BY OWNER
FLEX
FLEXIBLE
FLR
FLOOR
FOIC
FURNISHED BY OWNER INSTALLED BY OTHERS
FP
FREEZE PROOF/FIRE PROTECTION
FPM
FEET PER MINUTE
FPS
FEET PER SECOND
FPWH
FREEZE PROOF WALL HYDRANT
FS
FLOOR SINK, FLOW SWITCH
FT
FOOT/FEET
GA(GAL
GALLON
GA V
GALVANIZED
GD
GARAGE DRAINYGARBAGE DISPOSAL
GC
F
GENERAL CON RACTOR
GEN
GENERAL
GND
GROUND
GPH
GALLONS PER HOUR
GPM
GALLONS PER MINUTE
HB
HOSE BIBB
HD
HEAD
HDR
HEADER
HG
MERCURY
HORIZ
HORIZONTAL
HOA
HAND -OFF -AUTOMATIC
HIP
HORSEPOWER
HR
HOUR
HT
HEIGHT/HEAT TRACE
HW
DOMESTIC HOT WATER
HWC
DOMESTIC HOT WATER CIRCULATING
HX
HEAT EXCHANGER
HZ
HERTZ
IA
INSTRUMENT AIR
IBC
INTERNATIONAL BUILDING CODE
ICW
INDUSTRIAL COLD WATER
ID
INSIDE DIAMETE%DIMENSION
IE
INVERT ELEVATIO
IN
INCH(INCHES
IN WG
INCH S WATER GAUGE
INV
INVERT
IRW
IRRIGATION WATER
1W
INDIRECT WASTE
KWH
KILOWATT HOUR
KEC
KITCHEN EQUIPMENT CONTRACTOR
LAV
LAVATORY
LB/LBS
POUND/POUNDS
LBS/HR
POUNDS PER HOUR
LPG
LIQUID PROPANE GAS
LIPS
LOW PRESSURE STEAM
LWT
LEAVING WATER TEMPERATURE
MAX
MAXIMUM
MBH
1000 BRITISH THERMAL UNITS PER HOUR
MCA
MINIMUM CIRCUIT AMPACITY
MECH
MECHANICAL
MFR
MANUFACTURER
MIN
MINIMUM� MINUTE
MISC
t
MISCEL NEOUS
MM
MILLIMETERS
MPS
MEDIUM PRESSURE STEAM
MTD
MOUNTED
N
NITROGEN
NA
NOT APPLICABLE
NC
NORMALLY CLOSED/ NOISE CRITERIA
NG
NATURAL GAS
NIC
NOT IN CONTRACT
NO
NORMALLY OPEN/ NUMBER
NO2
NITROUS OXIDE
NOM
NOMINAL
NP
NON -POTABLE
NTS
NOT TO SCALE
02
OXYGEN
OC
ON CENTER
OD
OUTSIDE DIAMETER/DIMENSION/ OVERFLOW DRAIN
ODP
OPEN DRIPPROOF
ORD
OVERFLOW ROOF DRAIN
OVHD
OVERHEAD
PD
PRESSURE DROP/ PIT DRAIN/ PUMP DISCHARGE
PERF
PERFORATED
PH
PHASE
PLBG
PLUMBING
POC
POINT OF CONNECTION
PRESS
PRESSURE
PRV
PRESSURE REDUCING VALVE
PS
PRESSURE SWITCH
PSF
POUNDS PER SQUARE FOOT
PSI
POUNDS PER SQUARE INCH
PSIG
POUNDS PER SQUARE INCH GAUGE
PVC
POLYVINYL CHLORIDE
QTY
QUANTITY
R
RISER / RETURN
RCVR
RECEIVER
RD
ROOF DRAIN/ REFRIGERANT DISCHARGE
RECIRC
RECIRCULATING/ RECIRCULATE
RED
REDUCE/ REDUCING
REF
REFERENCE
REG
REGULATOR
RL
RAIN LEADER/ REFRIGERANT LIQUID
RPBP
REDUCED PRESSURE BACKFLOW PREVENTER
RPM
REVOLUTIONS PER MINUTE
RS
REFRIGERANT SUCTION
RV
RELIEF VALVE
RVD
RELIEF VALVE DISCHARGE
S
SOIL/ SUPPLY
SAN
SANITARY
SAT
SATURATION
SD
STORM DRAIN
S-C
SEATTLE --- CODE
SECT
SECTION
so
SCREENED OPENING
SOL
SOLENOID
SOLV
SOLENOID VALVE
SID
STATIC PRESSURE/ SPRINKLER
SPEC
SPECIFICATION
SQ
SQUARE
SQ FT
SQUARE FEET
SS
SANITARY SEWER
STRUC
STRUCTURAL
SUCT
SUCTION
TBD
TO BE DETERMINED
TD
TEMPERATURE DIFFERENTIAL
TEMP
TEMPERATUR TEMPORARY
THERM
THERMOMETE
TOP
TOP OF PIPE
TP
TRAP PRIMER
TIPS
TRAP SEAL
TYP
TYPICAL
UG
UNDERGROUND
UNO
UNLESS NOTED OTHERWISE
UPC
UNIFORM PLUMBING CODE
UR
URINAL
UTIL
UTILITY
V
VENT/ VOLT
VA
VALVE/ VOLT AMPERE/ VACUUM AIR
VAC
VOLTS ALTERNATING CURRENT/ VACUUM
VB
VACUUM BREAKER
VEL
VELOCITY/ VERIFY EXACT LOCATION
VERT
VERTICAL
VOL
VOLUME
VR
VENT RISER
VTR
VENT THROUGH ROOF
W
WASTE/ WIDTH/ WATT
W/
WITH
W/O
WITHOUT
WAGD
WASTE ANESTHESIA GAS DISPOSAL
WC
WATER CLOSET
WCO
WALL CLEANOUT
WH
WALL HYDRANT/ WATER HEATER/ WATT HOUR
WILD
WELDED
WM
WATER METER
WO
WASTE OIL
WIP
WATERPROOF/ WEATHERPROOF
WR
WASTE RISER
WT
WATERTIGHWT WEIGHT
WWP
A
WORKING ATER PRESSURE
0 ELBOW UP
D ELBOW DN
DIRECTION OF FLOW
DIRECTION OF SLOPE DOWN
REDUCER
TEE OUTLET UP
TEE OUTLET DOWN
UNION
PIPE ANCHOR
EXPANSION JOINT
kly STRAINER WITH BLOWDOWN VALVE
.1 GATE VALVE
GLOBE VALVE
BALL VALVE
CHECK VALVE
......... ... PRESSURE REDUCING VALVE
FLOW BALANCING VALVE (AUTO OR MANUAL)
T&P RELIEF VALVE
GAS COCK
LINE CLEANOUT
PRESSURE GAUGE WITH GAUGE COCK
THERMOMETER
FLEXIBLE CONNECTION
PLUG OR CAP
WATER HAMMER ARRESTOR
BUTTERFLY VALVE
SOLENOID VALVE
BACKFILOW PREVENTER
REDUCED PRESSURE BACKFLOW PREVENTER
METER METER
ZUR sm., I
-
EXISTING PIPING
01
DEMO PIPING
WASTE
- - - - - - - - -
VENT
DOMESTIC HOT WATER- RECI RCU LATI NG
DOMESTIC HOT WATER
DOMESTIC COLD WATER
GRW
GREASE WASTE
SD
STORM DRAIN
OSD
OVERFLOW STORM DRAIN
NPCW/NPHw-
NON -POTABLE COLD/HOT WATER
DI
DEIONIZED WATER
WAGD
WASTE ANESTHESIA GAS DISPOSAL
CA
COMPRESSED AIR
CO2
CARBON DIOXIDE
N2
NITROGEN
NO2
NITROUS OXIDE
02
OXYGEN
MA
MEDICAL AIR
MV
MEDICAL VACUUM
MPSW
MEDIUM PRESSURE STEAM SUPPLY
MPR(#)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LPS(#)
LOW PRESSURE STEAM SUPPLY
LPR(#)
LOW PRESSURE STEAM CONDENSATE RETURN
COND
CONDENSATE
0 FLOOR CLEANOUT
19 FLOOR DRAIN / SINK
PUMP
0 ROOF DRAIN OR OVERFLOW DRAIN
PLUMBING FIXTURES
PLUMBING FIXTURE DESIGNATION
POINT OF CONNECTION
RISER DESIGNATION
PLUMBING EQUIPMENT DESIGNATION
&_ DRAWING (CIRCLE NOTE) REFERENCE
PLUMBING / PIPING GENERAL NOTES
1. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS, INCLUDING, BUT NOT
LIMITED TO THE 2015 IBC, 2015 UPC, 2015 WSEC, 2015 IMC & 2005 SEATTLE BOILER AND
PRESSURE VESSEL CODE WITH WASHINGTON STATE AMENDMENTS.
2. PLUMBING WORK CONSISTS OF WORK SHOWN ON DRAWINGS, DETAILS & DIAGRAMS. THE
WORK INCLUDES FURNISHING, INSTALLING, SYSTEM INTEGRATION, TESTING, AND ASSURING
PERFORMANCE OF THE SYSTEMS IN ACCORDANCE WITH REQUIREMENTS. THE WORK MAY INCLUDE
ELECTRICAL AND ELECTRONIC COMPONENTS AS DESCRIBED IN THE CONTRACT DOCUMENTS.
3. VERIFY SYSTEM AND PERFORMANCE REQUIREMENTS TO ENSURE SYSTEM OPERATES AS DESIGNED. I
4. LOCATION AND DETAIL OF ALL EQUIPMENT AND EQUIPMENT CONNECTIONS ARE APPROXIMATE.
COORDINATE FINAL EQUIPMENT AND ARRANGEMENT AND INSTALL IN ACCORDANCE WITH OTHER
TRADES' APPROVED SUBMITTALS AND DETAIL DRAWINGS AS APPLICABLE.
5. PROVIDE SUPPORTS FABRICATED FROM STEEL MEMBERS FOR INSTALLATION OF EQUIPMENT AS
REQUIRED BY EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS OR AS SHOWN ON THE
DRAWINGS. REQUIRED STRUCTURAL MEMBERS, BOLTS, AND WELDS SHALL BE IN
ACCORDANCE WITH THE LATEST AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) MANUAL.
6. PROVIDE ANCHOR BOLTS OF THE SIZE, TYPE, AND LENGTH RECOMMENDED BY THE EQUIPMENT
MANUFACTURER, AS REQUIRED BY EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS OR
AS SHOWN ON THE DRAWINGS.
7. PROVIDE SUPPORTS AND SEISMIC RESTRAINTS FOR PIPES AND EQUIPMENT AS SPECIFIED OR AS
SHOWN ON THE DRAWINGS. IF REQUIRED FOR INSTALLATION, PROVIDE ADDITIONAL STRUCTURAL
MEMBERS BETWEEN COLUMNS, JOISTS, AND STRUCTURAL FRAMES TO MEET THE SUPPORT
REACTIONS (FORCES, MOMENTS, DEFLECTIONS). STRUCTURAL MEMBERS SHALL BE DESIGNED BY
A REGISTERED PROFESSIONAL ENGINEER AND INSTALLED BY G.C. WIRES FOR CEILING
SYSTEM, ETC... SHALL NOT BE HUNG FROM PLUMBING EQUIPMENT OR PIPING SUPPORTS.
9. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF CEILING OR SURFACE MOUNTED DEVICES.
INSTALL EQUIPMENT IN CONFORMANCE WITH ARCHITECTURAL FEATURES IN THE CENTER OF
CEILING TILES, IN THE CENTER OF ROOMS, OR WHERE SHOWN ON ARCHITECTURAL DRAWINGS.
WHERE EQUIPMENT IS NOT SHOWN ON ARCHITECTURAL PLANS, OBTAIN DIRECTION FROM THE
ARCHITECT PRIOR TO INSTALLATION.
10. COORDINATE ROOF CURB AND FLASHING REQUIREMENTS WITH ARCHITECTURAL PLANS.
11. ROOM NAMES AND NUMBERS ARE FOR REFERENCE ONLY. REFER TO ARCHITECTURAL DRAWINGS
FOR PROPER NAMES AND NUMBERING SEQUENCE.
12. COORDINATE LOCATION OF PLUMBING EQUIPMENT TO PROVIDE CLEARANCES FOR REMOVAL AND
SERVICE OF LIGHTING FIXTURES AND ACCESS FOR MAINTENANCE OF EQUIPMENT.
13. PLUMBING DRAWINGS DO NOT INDICATE ALL INTERFACING EQUIPMENT AND COMPONENTS.
COORDINATE WITH OTHER PROJECT DRAWINGS AND DOCUMENTS FOR WORK
OF OTHER TRADES.
14. MAINTAIN HEADROOM CLEARANCES PER MINIMUM OSHA STANDARDS OR AS ALLOWED BY THE
AUTHORITY HAVING JURISDICTION UNLESS NOTED OTHERWISE.
15. COORDINATE ALL SLAB PENETRATIONS AND SLEEVES WITH THE GENERAL CONTRACTOR PRIOR TO
EACH CONCRETE POUR.
16. PROVIDE TRAPS WITH PROTECTION ON ALL FLOOR DRAINS, GARAGE DRAINS, AND TRENCH
DRAINS, EXCEPT WHERE DRAINS FLOW INTO OIL/WATER SEPARATORS OR STORM WATER VAULTS.
17. FOR WATER HEATERS, INSTALLED IN UNCONDITIONED SPACES OR ON CONCRETE SLABS, AN
INSULATED INCOMPRESSIBLE FLOOR PAD (R-10 MINIMUM) IS REQUIRED. PROVIDE 11" TALL PAN
WHERE INSTALLED ABOVE A CEILING.
18. PIPING INSULATION SHALL COMPLY WITH THE LATEST APPROVED VERSIONS OF THE
INTERNATIONAL MECHANICAL AND ENERGY CODES AS DESIGNATED BY THE LOCAL JURISDICTION.
19. ALL MOTOR STARTERS NOT SHOWN IN EQUIPMENT SCHEDULES SHALL BE FURNISHED AND
INSTALLED BY ELECTRICAL CONTRACTOR. MOTOR EFFICIENCIES TO MEET OR EXCEED CODE
MINIMUM.
20. WASTE AND STORM DRAIN PIPE SHALL BE SLOPED AT J" PER FOOT UNLESS OTHERWISE NOTED.
21. ELECTRICAL METERING OF SYSTEMS AS REQUIRED BY ENERGY CODE SECTION C409 IS BY
ELECTRICAL. THE ELECTRICAL DESIGN & CONTRACTOR TEAM WILL FURNISH THE NECESSARY
ELECTRICAL DISTRIBUTION AND METERING COMPONENTS - SEE ELECTRICAL DRAWINGS. THE
MECHANICAL CONTRACTOR WILL FURNISH A BUILDING MANAGEMENT SYSTEM CAPABLE OF
COLLECTING AND STORING THE INFORMATION WITH A VISIBLE DISPLAY/NOTIFICATION READILY
ACCESSIBLE TO OPERATION AND MANAGEMENT PERSONNEL AS REQUIRED.
DRAWING INDEX
SHEET NO.
SHEET TITLE
CURRENT
REVISION
PO.00
LEGEND, ABBREVIATIONS, GENERAL NOTES & SHEET INDEX - PLUMBING
PO.01
SCHEDULE SHEET - PLUMBING
PO.02
SCHEDULE SHEET - PLUMBING
P2.00
FOUNDA11ON PLAN PLUMBING
P2.01
1ST FLOOR PLAN PLUMBING
P2.02
2ND FLOOR PLAN PLUMBING
P2.R1
ROOF PLAN - PLUMBING
P5.01
DETAIL SHEET - PLUMBING
FTI W 0
of 1 off
NE 1/4 OF THE NW 1/4 SECTION 29, TOWNSHIP 27N RANGE E4, W.M.
VICINITY MAP
NO SCALE
SITE MAP
NO SCALE
MINIMUM PIPE INSULATION LAST UPDATED: 07/11/16
FLUID DESIGN
OPERATING
TEMPOF
INSULATION CONDUCTIVITY
NOMINAL PIPE DIAMETER (INCH)
CONDUCTIVITY
RANGE
MEAN TEMP
RATING OF
<1
1 TO
<1-1/2
1-1/2 TO
T <4
4 TO
<8
>8
HEATING SYSTEMS (STEAM, CONDENSATE,
HYDRONIC
HOT WATER, DOMESTIC HOT WATER & RECIRC)
>350
0.32-0.34
250
4.5
5.0
5.0
5.0
5.0
251-350
029-0.32
200
3.0
4.0
4.5
4.5
4.5
201-250
0.27-0.30
150
2.5
2.5
2.5
3.0
3.0
141-200
0.25-0�29
125
1.5
1 1' 5
10
2.0
1 2.0
105-140
.28
0.21-0 �9
+ 100
1 1.0
1 1.0
1 1.5
1 .5
1 1.5
DOMESTIC COLD WATER AND HORIZONTAL RAIN LEADERS
TO FIRST VERTICAL
RAIN LEADER (TO PREVENT CONDENSATION)
N/A
1 0.21-0.27
1 75
1 0.5
1 0.5
1 0.5
0.5
0.5
COOLING SYSTEMS (CHILLED WATER, BRINE AND REFRIGERANT, WATERSIDE ECONOMIZER SYSTEMS)"
40-60
0.21-0.27
75 1
0.5
0.5
1.0
TO
1.0
<40
020-0.26
75
1 0.5 +
1.0
1.0
1.0
1.5
111
A C 0
IX
M1
ACO
NOTE:
NOT REQUIRED FOR STRAINERS, CONTROL VALVES & BALANCING VALVES ASSOCIATED WITH PIPING 1" OR LESS IN DIA. ISSUE FOR PERMIT
TYPICAL CONDENSER WATER PIPE IN NON -ECONOMIZER SYSTEMS IS NOT INSULATED AND SEE R403 FOR RESIDENTIAL INSTALLATIONS.
Hermanson
ftilding Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
�,ODOR 41,
0�, WAS,,tj,
rl
GIS
10
IV;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3_
03/24/17 DWN COORD SET REV2 -
03/17/17 DWN COORD SET REV1_
03/02/17 DWN DD SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11-17-10152
Issue Date 04/12/17
LEGEND, ABBREVIATION,
GENERAL NOTES & SHEET
INDEX - PLUMBING
POM00
INSUL INSULATE/INSULATION
ELECTRIC WATER HEATER SCHEDULE
LAST UPDATED: 3/22/2017
STORAGE
RECOVERY
UNIT
BASIS
CAPACITY
EWT
LWT
RATE
ELEC
WEIGHT
TAG
LOCATION
SERVES
DESIGN
MODEL
TY PE
GALLONS
OF
OF
GPH
KW
V/PH
LBS
REMARKS
EWH-1
1ST FLR RESTRIM
MAIN OFFICE
AO SMITH
DRE-52
TANK
50
50
120
52.7
9
480/3
680
1,2,3,7
EWH-2
TOOL RM
WASH/DETAIL
AO SMITH
DRE-120
TANK
119
50
120
52.7
9
480/3
1378
1,2,3,7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
POWER WIRING AND DISCONNECT (BY ELECTRICAL CONTRACTOR)
2
PIPE RELIEF VALVE TO NEAREST FLOOR DRAIN OR HUBDRAIN AT SINK WITH INDIRECT TERMINATION
3
DISCONNECT AS REQUIRED BY ELECTRICAL CONTRACTOR
4
120V RECEPTACLE REQUIRED FOR PLUG IN CONNECTION BY ELECTRICAL CONTRACTOR
5
150 PSI OPERATING PRESSURE - MOUNT IN CABINET SPACE BELOW SINK.
6
120V HARD WIRED CONNECTION BY ELECTRICAL CONTRACTOR
7
DRAIN PAN TO BE PIPED TO INDIRECT CONNECTION AT FLOOR DRAIN, WALL BOX, MOP SINK, OR AIR GAP FITTING
HOT WATER CIRCULATION PU.M..P SCHEDULE LAST UPDATED: 03/14/17
: --------------- A REA-Em—
SERV ED 11,
BASIS OF DESIGN
OPER. HEAD
FTH20
SHUT-OFF
HEAD FT H20
'TIO
'.-ORSTR#C 11
PRESS. PSI
��Rrkffrerz
ME
1 STA9TE9. DISCO1J1JEAt!1fWD TIVE9, FUTE9LOC"TITIJG
BY ELE1*_9,IC4,L C8'UT9,kWOP.
2 STAINLESS STEEL CONSTRUCTION. PROVIDE WITH AUTOMATIC TIMER
EXPANSION TANK SCHEDULE LAST UPDATED: 02/28/17
UNIT
TAG
LOCATION
SERVES
BASIS OF
DESIGN
TYPE
POSITION
DIA
INCHES
HEIGHT
INCHES
CAPACITY
GALLONS
ACCEPTANCE
GALLONS
MIN
TEMP (OF)
MAX
TEMP (OF)
PRESS
RATING (PSI)
WEIGHT
LBS,
REMARKS
Ei
2ND FLR JAN
EWH-1
AMTROL ST-5
BLADDER
VERTICAL
8.0
12.0
2
1
50
120
125
35
1
Ei
FIRE RISER RM
EWH-2
AMTROL ST-5
BLADDER
VERTICAL
8.0
12.0
2
1
50
120
125
35
1
1
1
'Eur"I on
PLUMBING FIXTURE CONNECTION SCHEDULE LAST UPDATED 3/2/17
MANUFACTURER AND MODEL NUMBER
WATER CLOSET (ADA)
WALL MOUNT, SENSOR FLUSH VALVE
KOHLER K-4325, K-10956-CP FLUSH VALVE
WATER CLOSET (ADA)
FLOOR MOUNT FLUSH VALVE
KOHLER K-4405, SLOAN ROYAL 111-1.28
URINAL (ADA)
WALL MOUNT SENSOR FLUSH VALVE
KOHLER K-4904, K-10949-CP FLUSH VALVE
LAVATORY (ADA)
KOHLER K-2215, 23 X 16, DYSON AB09 SHORT
LAVATORY (ADA)
KOHLER K-1999-1-0 LAV & SHROUD, CHICAGO EQ-Dl2A-13ABCP
KITCHEN SINK (ADA)
S.S. DOUBLE COMPARTMENT, COUNTERTOP
ELKAY LRADQ-3319-55-3, 18 GA. SS, 33X19, DELTA 100-WIF-12" FAUCET
SINGLE COMP. SINK (ADA)
S.S. SINGLE COMPARTMENT, COUNTERTOP
ELKAY LRADQ-2219-55-3, 18 GA. SS, 22X19, DELTA 100-WIF-8" FAUCET
IFINOTOR mm"k
FLOOR MOUNT, CORNER
PROFLO PFMB 2424, 24X24, FIAT 830AA SERVICE FAUCET
DRINKING FOUNTAIN (ADA)
INDOOR WALL MOUNT - DUAL HEIGHT
ELKAYEZH20 MODEL LZSTL8WSLK (DRINKING FOUNTAIN WTH BOTTLEFILLING STATION)
so . .
LOOSE KEY HANDLE, MALE HOSE THREAD OUTLET
WOODFORD 22, SILLCOCK WITH VACUUM BREAKER, CHROME PLATED
WALL HYDRANT EXTERIOR
NON -FREEZE, WALL HYDRANT, CHROME
WOODFORD 65C, VACUUM BREAKER
NICKEL BRONZE, ROUND ADJUSTABLE STRAINER
JR SMITH 2005-A
FUNNEL FLOOR DRAIN
NICKEL BRONZE, ADJUSTABLE STRAINER
JR SMITH 2005-A WITH 3591 FUNNEL
INTIT-307TIM
DRAIN INSERT (NO TRAP PRIMER)
JR SMITH 2692
TRENCH DRAIN
JR SMITH 9930-GHD-1,�V
TRENCH DRAIN
LTivsto 0 111cf-3
JR SMITH 9930-GHD-25'-8"
TRENCH DRAIN
PRE -SLOPED POLYPRO WITH GALV SLOTTED GRATE
JR SMITH 9930-GHD-32'-3"
TRENCH DRAIN
JR SMITH 9930-GHD-51-6"
TRENCH DRAIN
LTivsto 0 111cf-3
JR SMITH 9930-GHD-52'
FLOOR CLEANOUT
CI TOP, BRONZE OR ABS PLUG, ADJUSTABLE
JR SMITH 4224LXH04
WALL CLEAN OUT
CAST IRON TEE, SS COVER, CI OR ABS PLUG
JR SM IT H 4530S
0 RW-
CAST IRON DOME STRAINER
JR SMITH 1010Y-R-C
OVERFLOW ROOF DRAIN
CAST IRON DOME STRAINER, WATER DAM
JR SMITH 1080Y-R-C
THERMOSTATIC MIXING VALVE
IN WALL, MOUNTING BRACKET, BRONZE
POWERS LFe480
1 WALL CARRIERS: JR SMITH 0700 FOR LAVS, JR SMITH 0630 FOR URINALS, JR SMITH 0200 WATER CLOSETS, WATTS ISCA-141 FOR SINGLE WATER CLOSETS -
MOUNTING HEIGHT AS SHOWN ON ARCHITECTURAL DRAWINGS
2 PROVIDE OLSONITE 1OCC ELONGATED SEAT, OPEN FRONT, NO COVER, EXTERNAL CHECK HINGE
3 SIZE CW AT 1 1/4" DOWN TO FIXTURE CONNECTION FOR ALL FLUSH VALVES
4 PROVIDE 1 1/4 17 GA P-TRAP CP, MCGUIRE 155A OPEN GRID PO PLUG , BRASSCRAFT LOOSE -KEY LAV SUPPLY KIT CP WITH BRAIDED FLEXIBLE HOSE.
5 PROVIDE TRUEBRO 103 INSULATION FOR P-TRAP AND SUPPI TES PER ADA REQUIREMENTS
6 PROVIDE VACUUM BREAKER, PAIL HOOK, INTEGRAL CHECK STOPS, WALL BRACE, 30" RUBBER HOSE, HOSE HOOK, METAL STRAINER, MOP HANGER W/ GRIPS, STAINLESS STEEL WALL GUARD
7 PROVIDE JUST J-35 SS CUP STRAINER WITH REMOVABLE BASKET, 1 1/2 17 GA P-TRAP CHROME PLATE, BRASSCRAFT LOOSE -KEY LAV SUPPLY KIT CHROME PLATED WITH BRAIDED FLEXIBLE HOSE.
8 PROVIDE 1 1/4 17 GA P-TRAP
9 FOR NON-FREEZING AREAS ONLY
10 PROVIDE VACUUM BREAKER, 1/4 TURN T-HANDLE KEY
11 PROVIDE TRAP PRIMER, PRECISION PLUMBING PRODUCTS P/N-PO-500
12 WITH GRAVEL GUARD, PROVIDE ROOF SUMP RECEIVER AND UNDERDECK CLAMP IF NEEDED
13 120 VOLT POWER (TO OPERATE WATER SOLENOID) TO DRINKING FOUNTAIN BY ELECTRICAL CONTRACTOR. COORDINATE LOCATION OF ELECTRICAL OUTLET
14 DISHWASHER PROVIDED BY OTHERS. CONNECT DRAIN TO SINK TAILPIECE WITH DRAIN AND WATER SERVICE & SHUT OFF BY PLUMBING CONTRACTOR. PROVIDE WITH EASTMAN AIRGAP FITTING AT SINK
15 POLYSTYRENE OR METAL BOX WITH QUARTER TURN STOP SHUTOFF.
16 WATER SERVICE& SHUT OFF BY PLUMBING CONTRACTOR
17 INSTALL IN ACCESIBLE LOCATION OR PROVIDE WALL ACCESS PANEL (BY G.C.)
18 PROVIDE NO SEEP WAX RING, 1/4X2 1/4 STAINLESS T-HANDLE, STAINLESS BNW SET
Her,manson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
,�,ODOR
9
GIS
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3 —
A 03/24/17 DWN COORD SET REV2_
03/17/17 DWN COORD SET REV1-
03/02/17 DWN DID SET
No. Date By Description
Design Team
Design DWN
Drawn FVIP
Checked DTNI
Project Number 11-17-10152
Issue Date 04/12/17
SCHEDULESHEET
- PLUMBING
P0001
ISSUE FOR PERMIT
iREDUCEDPRESSUREBACKFLOW PREVENTER, LAST UPDATED: 03/22/17
BASIS OF
DESIGN
MODEL # OR
TYPE
1 CERTIFIED TO MEET LOW LEAD REQUIREMENTS WITH WETTED SURFACES CONTAINING LESS THAN .25% LEAD
PIPING
MATERIAL SCHEDULE
03/01/17
PIPE SERVICE
LOCATION
F_ MATERIAL
JOINT METHOD
REMARKS
COLD & HOT WATER
UNDERGROUND
COPPER/L
BRAZED
UNDERGROUND-,-----
PEX-A
MECHANICAL JOINT
ABOVE GROUND
COPPER/L OR M
LEAD FREE SOLDER, PRESSFIT, ROLL
GROOVED JOINT ......
ABOVE GROUND
PEX-A
PEX FLARE JOINT
PROTECT IF IN RAPLENUM, INCREASE ONE NOMINAL PIPE SIZEO\/ERCOPPER
WASTE
UNDERGROUND
PVC SCH 40 DWV
SOLVENT CEMENTED
WHERE ALLOWED
UNDERGROUND
PVC SCH 40 DWV
SOLVENT CEMENTED
GREASE WASTE (UNDER 1400F)
ABOVE GROUND---
CAST IRON
NO HUB
.
..... ABOVE GROUND
PVC SCH 40 DWV_ ---- — -
SOLVENT CEMENTED
IF NOT IN A RA PLENUM
NOTE: BLDG HEIGHT LIMIT DELETED IN 2002 WSBC AMENDS
VENT
.
.......... ALL -
- - ----------
..... . ................. CAST IRON ........................
NO HUB
......... . . ...................
.......................... . ..... . . . . ...................... . .... . .......................... . ..... . .....
A-BOVE GROUN-D
C_1'______'
5 d
+ PV SCH 40 DWV
SOLVENT CEMENTED
IF NOT IN A RA PLENUM
RAIN LEADERS
—ABOVE GROUND
CAST IRON
NO HUB
ABOVE GROUND
PVC SCH 40 DWV
SOLVENT CEMENTED
IF NOT IN A RA PLENUM
UNDERGROUND
CAST IRON
NO HUB OR HUB AND SPIGOT
COIL CONDENSATE
ABOVE GROUND.
PVC SCH 40
—ORM
SOLVENT CEMENTED
NOT IN A RA PLENUM
�_ABOVE
GROUND
:::::j:::::::::��'P_ER/DWV
PRESSFIT OR SOLDI R
R
REFRIGERANT
ALL
COPPER ACR
BRAZED
PROVIDE NITROGEN PURGE
ALL
COPPER ACR
ZOOMLOCK, LOKRING
PROVIDE NITROGEN PURGE
ALL
PRE -INSULATED COPPER LINE SETS
BRAZED
PROVIDE NITROGEN PURGE
WATER HAMMER ARRESTORS LAST UPDATED: 02/28/17
BASIS OF
DESIGN
SIZE
INCHES
UNIT FIXTURE
RATING
WADE SHOPSTOP
GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS (ELECTRICAL, WEIGHT, SIZE, ETC ... ) WITH APPROVED SUBMITTALS
PRIOR TO INSTALLATION; FIELD COORDINATE FINAL LOCATION &INSTALL PER MANUFACTURERS REQUIREMENTS
1 UNIT APPROVED FOR SEALED WALL INSTALLATION WITHOUT MAINTENANCE.
2 UNIT CONFORMS TO PDI AND A.S.S.E. STANDARDS
WATER PRESSURE REDUCING VALVE SCHED LAST UPDATED: 03/22/17
�8111111111!i
LOCAT N
OA�
BASIS OF
DESIGN
MODEL # OR
TYPE
I I I TOM reim
GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS (ELECTRICAL, WEIGHT, SIZE, ETC ... ) WITH APPROVED SUBMITTALS
PRIOR TO INSTALLATION; FIELD COORDINATE FINAL LOCATION &INSTALL PER MANUFACTURERS REQUIREMENTS
1 CERTIFIED TO MEET LOW LEAD REQUIREMENTS WITH WETTED SURFACES CONTAINING LESS THAN .25% LEAD
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
-c,ODOR
WAS,,tj,
0�
�GIS
S10
N;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3_
03/24/17 DWN COORD SET REV2 —
03/17/17 DWN COORD SET REV1_
03/02/17 DWN DD SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11 —17-10152
Issue Date 04/12/17
SCHEDULESHEET
- PLUMBING
P0002
ISSUE FOR PERMIT
E= �4"W
7.65'
------------------- --- --------------- --- --------------- -- ---------------
--------- --- --------------- - --------------------- --- ------------------------ ---
Uj
CL
C�
Lo
2"W UP -\
TO SINKS 0—
IE= 98.75'
4"W UP
IN WALL/- 4'V 4"W
0D)-4"W-U1'-TO
WALL CLEANOUT
3"W UP TO
FLOOR DRAIN
2"V Up A UP TO
2-V UP SINKS
3"W UP TO J
FLOOR DRAIN 2"V UP
I'll I I
3"W UP TO
FLOOR DRAIN
,CE IE: 98.5'
4"W
4"W
2"W UP
2'"V up--/, TO IINKS
FL�OUP TO
R DRAIN
- - - - - - - - - - - - -4 P
4V UP
4V UP TO
TO WCO
FLOOR CLEANOUT
4HOW Up To
L CLEANOUT
4"OW
VA VA MA VA 1% SLOPE MA M1%
4"RD UP 4"RD UP 4"RD UP 4"RD UP
Up T
(2837 SF 02") TO FCO
TO FCO 4"R�99
IE= 99.17' IE= .17'
------------ - --
(249-3-SF--@*- ------------ -430i%�-SIF 02�— -
So 6 SD
IE= 91'8.55� IE= 98.5' IE= 98.5' 4"RD UP
TO FCO
in Cn
I LLJ
CL Q-
LLJ 2 LLJ
U) Q- U) CL
6"RD 6"OW 4"RD
(5549 SF 02")
(n (2837 SF 02")
4"OW UP TO
4"OW UP TO
FLOOR CLEANOUT IE= 97.87' TRENCH DRAIN
4"OW 1 % SLOPE IE= 98.5'
IE= 98.24' is ka /is— —ka ks --- Ut v- IE= 98.17'
4-OW UP TO
4"OW IE= 98.5' TRENCH DRAIN
T f
FLOOR %RA12 SEE STRUCTURAL DWGS
6'
4"RD
IE= 98.39
IE= 98.5'
4"RD UP
IE= 99.17'
(3434 SIF C
lE= 98.33' GIENM NOTE.
FINAL INVERT ELEVATIONS TO BE COORDINATED
WITH CIVIL. FIELD VERIFY CONDITIONS.
6-RD �
IE= 97.5'
6"RD FOR SLEEVE THRU 4"RD 6"RD
IE= 98.17" FOOTING DETAIL (TYP) IE= 98.10' IE= 97.43'
Uj
(5549 SF 02') 2'-8" 3"RD UP (2837 SF 02')
5-118
(511 SF 02') 5'-058
J rj� --02
�5 7 4 3
1 9 C7)
C�) , �Iy / '\�7 �)
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
0� WAS,,tj,
GIS
10
N;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3
03/24/17 DWN COORD SET REV2
03/17/17 DWN COORD SET REV1-
03/02/17 DWN DID SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11 -17-10152
Issue Date 04/12/17
FOUNDATION PLAN
- PLUMBING
P2000
ISSUE FOR PERMIT
D2
------------------------- ---- ------
------ -- ---------- - -------------- -- ---------------- --- ----------------
CB.
4"V UP TO THE OUTSIDE.
TERMINATE FLAGPOLE VENT
7'-0" ABOVE ROOF
CD) ------------ ---- -------- Ag�-
(TYP 2)
1"HW DN -
1"HW DN
SEE DETAIL
(z
P5.01
, DE —
c6j�-
TT
1rCW` I
L-2
V-
I ET-2
SEE DETAIL,�Z'
P5.01
1 0 9 C-7 (�6� 3 2 1. 5�' I
1 "HW UP
HAVE INTEGRAL AIR GAP
F!
14 TO WATER HEATER- -
J""HWC
2"CW
J"HW
2"V D
2"CW'
�"CW DN ------------------ -
J"CW N
DN r J"HW 5 ""'�"HW DN
3"RD UP
3"RD UP
(197 SF 02-)
4-OW DN
1!2�
9*\l tip
N6
SCALE: 3/32" = 1'-0"
",A/
YORD UP
(2,837 SF)
3"RD UP
(2837 SF)
3"RD DN
(2837 SF 02')
4
�4
11�7-
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
'�'o OR
0�, WAS
GIS
10
N;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3-
03/24/17 DWN COORD SET REV2 —
03/17/17 DWN COORD SET REV1-
03/02/17 DWN DD SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11 —17-10152
Issue Date 04/12/17
1ST FLOOR PLAN
- PLUMBING
P2001
ISSUE FOR PERMIT
D2
----------- ---- --------------------- --- ----------------
------------------------- ---- ------
------ -- ---------- - -------------- -- ---------------- -- ----------------
CB.
OD)— -
C6 J�- — -
(197 SF 02")
1 0 9 C-7 (�6� 3 2
3�ORD UP
ARD UP AD UP
SEE DEML,��
P5.01
3"RD UP
Y
2ND FLOOR PLAN - PLUMBING
SCALE: 3/32" = V-0"
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
�,ODOR
0, WAS
GIS
10
IV;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3-
03/24/17 DWN COORD SET REV2 —
03/17/17 DWN COORD SET REV1-
03/02/17 DWN DD SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11 —17-10152
Issue Date 04/12/17
2ND FLOOR PLAN
- PLUMBING
P2002
ISSUE FOR PERMIT
(�) ------------------------- ----
�).8 ------ --
CB.
OD)— -
c6j�-
TT
(I
(I
ROOF
SCALE: 3/32" = V-0"
�V V
Hermanson
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
MAGIC TOYOTA
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
'�'o OR
0�, WAS,,tj,
GIS
10
IV;AL
Revisions
04/12/17 DWN ISSUE FOR PERMIT
03/31/17 DWN COORD SET REV3-
03/24/17 DWN COORD SET REV2 —
03/17/17 DWN COORD SET REV1-
03/02/17 DWN DD SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11 —17-10152
Issue Date 04/12/17
ROOF PLAN
- PLUMBING
P2mR1
ISSUE FOR PERMIT
, A " ^111
UNION (TYP) _/
DMHPC'n DDCQQHDC
BACKFILOW PREVENTER
VALVE ASSEMBLY
M BACKFLOW PREVENTER DETAIL
P5.01 NOT TO SCALE
Q_CD
a
PRESSURE
GAUGE
W/COCK
y1 " AIR GAP Q
INDIRECT DRAIN
0 VVM31 L
SPRINKLER DRAIN DETAIL
P5.01 NOT TO SCALE
— ---------- - SEE PLAN
FOR PIPE SIZES
RAM
P5_01 NOT TO SCALE
0 0 0 0 0 0
4911.61116 4,, 10�10
0 0 0 0 0 0
I �" 1 11 fjmll�
TO BE INSULATED
la, 0 �01 v
CAULKED
OR NO -HUB
OUTLET
(:Z) TYPICAL COMBINED ROOF AND OVERFLOW DRAIN DETAIL
P5.01 NOT TO SCALE
Z
COMBINE OVERFLOW
IN VERTICAL PIPE
PRESSURE RELIEF VALVE
PIPE TO DRAIN
NEEDLE
VALVE (TYP 2)
11-V _� * -
UNION
PRESSURE REDUCING VALVE
STRAINER
BALL VALVE
(TYP 2)
M 2" & SMALLER WATER PRV STATION DETAIL
P5.01 NOT TO SCALE
1-1" VENT MIN.
2
PLASTIC SUPPORT
BRACKETS
2" SANITARY
TEE TAPPED 1-1'*
4
GATITTIT501-0
2" WASTE
MINIMUM
THERMOMETER ., EXPANSION TANK
PUMP
VACUUM
RELIEF HWC
VALVE CW
HW
i Y ASME RATED TEMPERATURE
T T AND PRESSURE RELIEF VALVE.
PIPE DISCHARGE FULL SIZE TO
FLOOR DRAIN OR MOP SINK
WATER DIELECTRIC UNION (TYP)
HEATER SEISMIC STRAP @ 1/3 POINTS
OF VERTICAL DIMENSION (TYP 2)
R10 INSULATED PAD
DRAIN VALVE WITH THREADED HOSE CONNECTI
O� 0P-SIV,�
FLOOR MOUNTED ELECTRIC WATER
HEATER PIPING DIAGRAM
P5.01 NOT TO SCALE (WITH RECIRCULATION)
FED
'HEONS
FLEX RISER
TO FIXTURE
PROVIDE ASSE 1070
THERMOSTATIC MIXING
VALVE AT PUBLIC
LAVATORIES
LOOSE KEY ANGLE
STOP VALVE WITH
REPLACEABLE CARTRIDGE
a 1101M M 0 9 0_0 NF-Al by-0 2 to]
CLEAN -OUT PLUG
1-1" TRAP FOR FIXTURE*
4
1"' REQUIRED FOR LAV'S & ELECTRIC DRINKING FOUNTAINS
4
1-1" REQUIRED FOR SINKS
2
(:�:) TYPICAL LAV/SINK/EDF ROUGH -IN DETAIL
P5-01 NOT TO SCALE
HOTIM
PER WSEC C404.3.1 MAX LENGTH
FROM HOT WATER MAIN SUPPLY TO
TMV ON PUBLIC LAV'S IS 2'FOR 1"HW
2
(TFOR!"HW) FOR OTHER FIXTURES
8
43'FOR "'HW IS ALLOWED.
2
H
m coqik n s o n
Building Today, Defining Tomorrow
Hermanson Company LLP
1221 2nd Avenue North
Kent, Washington 98032
Tel: (206) 575-9700
Fax: (206) 575-9800
www.hermanson.com
Contractor Reg #: HERMACLO05BJ
KAAG I C TOYOTA
Biwa
OFEDMONDS
21300 HIGHWAY 99
EDMONDS, WA 98026
0� WAS
�GIS
S10
IV;AL
Revisions
04/12/17 DWIN ISSUE FOR PERMIT
03/31/17 DWIN COORD SET REV3
03/24/17 DWN COORD SET REV2
03/17/17 DWN COORD SET REV1_
03/02/17 DWN DID SET
No. Date By Description
Design Team
Design DWN
Drawn FVP
Checked DTN
Project Number 11-17-10152
Issue Date 04/12/17
---------------
DETAIL SHEET
- PLUMBING
P5mOl